 ITSEC Agreed upon initial set of Commonwealth-wide KPI’s* for Incident Management  Reporting is based upon ITSEC endorsed Incident Priority model as.

Slides:



Advertisements
Similar presentations
Office 365 for Enterprises: Pricing & Licensing Overview
Advertisements

Confidentiality and HIPAA
SQL Server Disaster Recovery Chris Shaw Sr. SQL Server DBA, Xtivia Inc.
1 RMS Workshop Retail Systems Disaster Recovery ERCOT May 6 th, 2014.
Information Technology Division Executive Office for Administration and Finance IT Service Excellence Committee (ITSEC) Nov 23, 2010.
Defining the Firm’s Mission and Social Responsibility.
Iron Mountain’s Continuity Service ©2006 Iron Mountain Incorporated. All rights reserved. Iron Mountain and the design of the mountain are registered.
6/3/20151 MARS... and the YEAR 2000 Management Administrative and Reporting System Commonwealth of Kentucky.
Group Presentation Design and Implementation of a company- wide networking & communication technologies strategy 9 th December 2003 Prepared By: …………
A Primer on Healthcare Information Exchange John D. Halamka MD CIO, Harvard Medical School and Beth Israel Deaconess Medical Center.
Incident Management ISD Division Office of State Finance.
Problem Management ISD Division Office of State Finance.
Implementing High Availability
Exchange 2010 Project Presentation/Discussion August 12, 2015 Project Team: Mark Dougherty – Design John Ditto – Project Manager Joel Eussen – Project.
Information Technology Division Executive Office for Administration and Finance Infrastructure Services Board December 13th, 2010 Commonwealth IT Service.
Sign-Off on Commonwealth Incident Prioritization: Defines Priority with which Incident will be managed URGENCY/ IMPACT High A service outage with broad.
Information Technology Division Executive Office for Administration and Finance Planning for Commonwealth Service Excellence Oct. 14, 2010.
1. Agenda Service Utilization Service Level Metrics Service Performance Review Incident Review Current / Future Service Plan Service Improvement Plan.
Electronic Public Record What is it, and Where Can Agency Lawyers Find It?
Chapter 7: Using Windows Servers to Share Information.
IT Business Continuity Briefing March 3,  Incident Overview  Improving the power posture of the Primary Data Center  STAGEnet Redundancy  Telephone.
Module 2.1 Finance and Administration Cabinet Organizational Changes and Agency Impact March
Administration and Finance Incident Prioritization Document
PPD Computing “Business Continuity” Windows and Mac Kevin Dunford May 17 th 2012.
Information Technology Division Executive Office for Administration and Finance IT Service Excellence Committee (ITSEC) Sept. 29, 2011.
A look at the current initiatives within UWE such as SharePoint, consolidation and virtualisation as well as some of the technology trends we can see coming.
Security Baseline. Definition A preliminary assessment of a newly implemented system Serves as a starting point to measure changes in configurations and.
IT Service Excellence Committee (ITSEC) Jan. 20th Meeting
Information Technology Division Executive Office for Administration and Finance IT Service Excellence Committee (ITSEC) Oct. 28, 2010.
Commonwealth Incident Prioritization– ITSEC Endorsed: Defines Priority with which Incident will be managed URGENCY/ IMPACT High A service outage with broad.
Case Study: Department of Revenue Data Breach National Association of State Auditors, Comptrollers and Treasurers March 21, 2013.
Health Information Technology Basics January 8, 2011 by Leola McNeill adapted from Information Technology Basics by June 2009, Kayla Calhoun & Dr. Frank.
Agency Health and the State of the Service Report 2006–07.
Deloitte Consulting LLP Commonwealth of Massachusetts IT Consolidation Program Statewide Working Group Discussion Document January 25, 2010 DRAFT FOR DISCUSSION.
Commonwealth IT Consolidation Background and Basic Talking Points (Update Title as Needed) Committee or Person Presenting Date MM/DD/YYYY.
December 14, 2011/Office of the NIH CIO Operational Analysis – What Does It Mean To The Project Manager? NIH Project Management Community of Excellence.
PPD Computing “Business Continuity” David Kelsey 3 May 2012.
Computer and Information Science Ch1.3 Computer Networking Ch1.3 Computer Networking Chapter 1.
Deloitte Consulting LLP Commonwealth of Massachusetts Statewide Strategic IT Consolidation (ITC) Initiative IT Consolidation Working Group Discussion Document.
Deloitte Consulting LLP Commonwealth of Massachusetts Statewide Strategic IT Consolidation (ITC) Initiative High-Level Infrastructure Consolidation Plan.
Information Technology Division Executive Office for Administration and Finance IT Service Excellence Committee (ITSEC) Dec. 23 rd Meeting Dec. 23, 2010.
Information Technology Division Executive Office for Administration and Finance IT Service Excellence Committee (ITSEC) Nov 10, 2010.
Deloitte Consulting LLP Commonwealth of Massachusetts IT Consolidation Initiative IT Governance Target State Update Briefing for Statewide Working Group.
MassDOT IT Informational - Brown Bag Lunch Date March 1, 2010.
Information Technology Division Executive Office for Administration and Finance IT Service Excellence Committee Jan. 19, 2012.
Target Accomplishments: Phase 3
Avinash Thota & Bhanu Reddy.  Introduction  Doing the project  Configuration of files  Demonstration  Applications  Future work  References.
Information Technology Division Executive Office for Administration and Finance IT Service Excellence Committee (ITSEC) Dec. 9, 2010.
High Availability in DB2 Nishant Sinha
Target State High-level IT Governance Model
HIT Policy Committee NHIN Workgroup HIE Trust Framework: HIE Trust Framework: Essential Components for Trust April 21, 2010 David Lansky, Chair Farzad.
ELECTRONICS RECORDS RETENTION AND LITIGATION Presented by Cyntia N. Zerkowski Director, Information Technology Macomb County Michigan Digital Government.
PHDSC Privacy, Security, and Data Sharing Committee Letter to Governors.
Commonwealth of Massachusetts Statewide Strategic IT Consolidation (ITC) Initiative Phase 3d Work Plan IT Consolidation Working Group Discussion Document.
Windows Small Business Server 2003 R2 Powering Small Businesses.
Commonwealth IT Consolidation Background and Basic Talking Points Date MM/DD/YYYY.
Working Group Meeting – Agenda for 05/17 1 Program Status / Phase 3c. (10 mins) J. McElhenny 2 IT Consolidation Program (30 mins) “ A Look Back & A Look.
 Computer hardware refers to the physical parts of a computer and related devices. Internal hardware devices include motherboards, hard drives,
The Career and Technical Education (CTE) Completer Follow-up 2016 Follow-Up of the 2015 CTE Graduates March 3, 2016.
Network - definition A network is defined as a collection of computers and peripheral devices (such as printers) connected together. A local area network.
INTRODUCTION TO DESKTOP SUPPORT
Chapter 7: Using Windows Servers
ICT II Unit 6 Networking.
Mission Continuity Program
Audit Plan Michelangelo Collura, Folake Stella Alabede, Felice Walden, Matthew Zimmerman.
1 2 Please stand by! The webinar will begin shortly.
Unit 11- Computer Networks
The Service Portal What is the Self-Service Web Portal?
ISDS Service Support Performance – May 2019
Student Information Services (SIS)
Presentation transcript:

 ITSEC Agreed upon initial set of Commonwealth-wide KPI’s* for Incident Management  Reporting is based upon ITSEC endorsed Incident Priority model as Approved by ISB & CIO CabinetPriority model  Monthly submission of KPIs and aggregation – Started 2/4 - voluntary (and confidential) participation KPIs  Importance: ITSEC wishes to have an end-to-end model of service support and this reporting is key to establishing that model  Goal: Measure of how successfully the policy adoption is occurring and what trends we are seeing  Next step : Understand where outages are occurring and where common opportunities exist  Begin by developing Commonwealth –wide IM Categorization framework ( Target: March)IM Categorization framework  Discuss prospects for collectively sharing service outages by category (Target: March)  Begin sharing this information (TBD) Commonwealth Service Excellence Program: Service Level Reporting 1

Commonwealth Incident Prioritization: Defines Priority with which Incident will be managed URGENCY/ IMPACT High There is a service outage with broad impact to the Commonwealth, across one or more services that are not functioning, or whole agencies are impacted, or an agency specific critical severity (outage) has occurred causing complete service outage(as opposed to for example, a performance degradation). (see Critical Applic. List for the critical applications which qualify as high impact service outages) Medium There is impact to a portion of an agency or office, with one or more services to the Commonwealth, either not functioning or seriously degraded so the effect is that the agency’s mission is impacted. Also may apply if one or more very high profile parties are impacted (I.e. Secretary or equivalent). Low Impact is to an individual or workgroup or the service impacted is not of a mission critical nature. High Immediate action is required to restore service(s) or prevent failure of a service. No work around Exists. Priority 1Priority 2 Priority 3 Medium A service outage has occurred and there is a work around but service is degraded or work around is not sufficently timely, is too costly or too much effort. Or service has not failed but has the potential to do so. Priority 2 Priority 3Priority 4 Low A service outage has occurred and a work around exists and/or the remedation or/and procurement is in process. Priority 3Priority 4Priority 4/5

URGENCY/ IMPACT High A service outage with broad impact to the Commonwealth, across one or more services that are not functioning, or whole sites or agencies are impacted, or an agency specific critical severity (outage) has occurred causing complete service outage (as opposed to for example, a performance degradation). (see attached Critical Applic. List). May effect public safety, transportation, health, financial servicing, or ability to deliver other public services. Medium There is impact to a portion of an agency or office, with one or more services to the Commonwealth, either not functioning or seriously degraded so the effect is that the agency’s mission is impacted. Also may apply if one or more very high profile parties are impacted (I.e. Secretary or direct report). Low Impact is to an individual or a small workgroup or the service impacted is not of a mission critical nature. High Immediate action is required to restore service (s) or prevent failure of a service. No work around exists. FastLane user accounts inaccessible; Unable to Log into Citrix; Network to Lowell office out. EOE: ESE Mail (Exchange) down effecting all 550 Secondary Ed. end users Complete loss of mission critical EHS applic. (ex. Beacon 3, Meditech, Family-net) Critical gateway loss (AD, VG, Mass.Gov) Complete Massmail outage at an EHS site -Complete loss of Commonwealth mission critical service (HRCMS, MMARS, etc.) EPS: RMV or DCJIS Mainframe down DEP network down effecting 400 users; e- Permitting system down; EEA’s network down causing ELA (Environ. Law Enfor.) outage and public safety impact LWD network ISP circuit failure all services impacted ANF: Agency network down MassDOTRegistrar’s PC down; AutoCAD Licensing server down, Oracle Fin. Down EOE: ELAR -Educator Licensing applic. down preventing all admins & teachers from obtaining licensing records & certifications Severe degradation of service from critical gateway (AD, VG, Mass.Gov) Complete loss of MassMail at an EHS agency EEA’s Waste site Cleanup data unavailable to Lic. Site professionals due to server outage Bad network switch - Springfield LWD call center down ANF: Governors Network down or Agency critical applic. out/degraded EEA – DAR Blackberry service outage MassDot Employee’s hard drive down EEA: Loss of data connectivity to part of an agency site EPS: VOIP Service 1 MPTC site Medium A service outage occurred & there is a work around but service degraded or work around not sufficiently timely, too costly or too much effort. Or service has not failed but potentially may do so. Critical voice service components are not functional (ex. Voice Mail) MassMail service for the Commonwealth is degrading ANF: node down effecting some users EOE: Nutrition Applic. Performance is degraded – health educators have difficulty obtaining necessary info. IVR redundancy failover required causing degradation for Lawrence Call Center EEA -AGR Web DataBase outage EPS:CJIS offline Search applic. responding slowly Single EEA user BB out MassDOT: A user’s MS-Word applic. Not opening ANF: EE keyboard broken Low A service outage has occurred and a work around exists and/or the remediation and/or needed procurement is in process. EEA’s HelpDesk HelpStar application unavailable but workaround via phones avail for short-term ANF: Phone system outage but redundant node processing calls EE PC down- temp. replacement not true image ANF: switch port out but other is avail. EHS: Service loss w/ limited # users and impact for which temp. restoration available via simple change (i.e. moving users to non-working to working port) Local MASS.DOT printer outage – EE ability to do primary job no impacted ESE Corrupted outlook file on siwillngle user –w/a is: use OWA Printing for a group of users at An EHS site down, but alternative printing in the site available. Commonwealth Incident Prioritization: ITSEC member examples P1 P2 P3 P2 P3P4P4/P5 P4 3