PXL Rack Layout Draft Leo Greiner January 2, 2013 DateCommentsPersonVersionApproved 01/02/2013Initial versionLG1.0LG 01/09/2013 add additional PS in WAH.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

HOW TO ADD A USER ACCOUNT ON A MAC BOOK AIR. Step 1-Logging In Log in, the Preset username and password is the first initial of your first name and then.
M.J. LeVine1STAR HFT meeting, Mar 10, 2010 STAR SSD upgrade M. LeVine, R. Scheetz BNL Ch. Renard, S. Bouvier Subatech H. Matis, J. Thomas LBNL.
L. Greiner1HFT Hardware 09/23/2010 STAR Vertex-6 based PXL RDO board Design concept and items for discussion.
Power distribution box XD1 top DTTF_Crate XD2 middle DTTF_Crate XD3 bottom DTTF_Crate Connection to DTTF_Crate through cable USE H07 ZZ-F 3G1,5 RACK S1D01.
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
L1 Meeting 11/4/2004 – Mario Camuyrano BLS-to-ADF Transition System 230 ns 100 mV/div 200 ns/div Existing and proposed calorimeter trigger rack layouts.
> >
DAQ&CM Infrastructure Paul Drumm. Issue Space is running out! Power supplies, RF system –Big kit, legislation dictates space requirements (not a clear.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
L. Greiner 1PXL BNL Safety Review– September 26, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal.
September 26, 2013 xTCA work group Evaluation results from AC/DC converters for xTCA Collaboration (CERN PH-ESE-BE) Vincent Bobillier, Matteo Di Cosmo,
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
L. Greiner 1HFT PXL BNL FTF– September 27, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
ANALOG STUDIO SETUP Basic Overview of Recording Studio I/O.
Disk testing - status. Disk Test Setup we use similar setup as the one used for sector tests, only simplified (no C6F14 cooling system, no source test,
MICE Controls Progress 15 th March 2007 * Controls Infrastructure * Controls network * Target * Superconducting Solenoid * Magnet Power Supplies * Hydrogen.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
FEE LVPS 1. INTRODUCTION This section describes the Low Voltage Power Supplies (LVPS) for the TPC FEEs and RDOs. Plans currently call for all of the old.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs – Me Comp1 11K hrs, Comp2 11K, Comp3 20K, Comp4 18K Service cold.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
Testing results of PXL RDO board JTAG daisy chain
D0 Workshop Bagby, Foglesong John Foglesong Run 2B SMT Low Voltage Power The present location of the SMT DC power supply units creates a problem.
Energy Dense Power Systems, LLC The Leader in Energy Dense Smart Power Applications POWER LIGHTS SECURITY 1154 Ontario Court, Suite 101 Owings, MD
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
HFT DOE Review July 17-18, 2012 The Silicon Strip Detector WBS 1.4 Jim Thomas Lawrence Berkeley National Laboratory SSD.
The User Friendly Community 2007 A community that is dedicated to making all of our rooms and procedures User Friendly As of
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
L. Greiner 1St. Odile CMOS Workshop – September 6-9, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun,
Costas Foudas, The Tracker Interface to TCS, The CMS Silicon Tracker FED Crates What goes in the FED Crates ? What do we do about the VME controller.
Energy Dense Power Systems, LLC The Leader in Energy Dense Smart Power Applications POWER LIGHTS SECURITY 1154 Ontario Court, Suite 101 Owings, MD
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
Vault Reconfiguration IT DMM January 23 rd 2002 Tony Cass —
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
New digital readout of HFRAMDON neutron counters Proposal Version 2.
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
EXIT IP600 Overview Avaya IP600 Internet Protocol Communication Server.
CMS Detector Control Room Barrel Endcap YB-2 YB-1 YB0 YB+1 YB+2 Far tower Near tower Rack X4V22 Rack X3V22 Rack X2V22 Easy crate Link box Na tym rysunku.
FTK crates, power supplies and cooling issues 13/03/20131FTK-IAPP workshop - A. Lanza  Racks, crates and PS: requirements  Wiener crates  Rittal crates.
FTK infrastructures and DCS 02/12/20101FTK Initial Design Review - A. Lanza  Crates  Single rack layout  Cabling  Rack placement  DSS  DCS.
MICE RF System Power Supplies, Control and Monitoring Status report
Rack Design Proposal as of 01/03/2013
FTK infrastructure in USA15 Status and plans for 2015 A
Tunnel Magnetic system power supply №1 HVM+Heat Power supply HVT SM
AM system Status & Racks/crates issues
Update on ‘Real estate’ for Level-0
Construction and Commissioning of Electronic Test Benches
EMU Slice Test Run Plan a working document.
COVER Full production should arrive today
“Compact, Multimedia Technology”
Focus Coil Quench Detector
Racks Coordination 09 September 2011 E. Negodin
Magnet Safety System for NA61/Shine
SCT/Pixel Draft Rack Layout rcj
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
ATLAS USA15 - Rack 52U with 9U crates, remote PS
Track Finder Crate, Backplane and Parts
TileCal ROD Commissioning Counting Room Installation
Process Flow For Electronic Component Prep
Front End Driver (FED) Crates and Racks +Tracker PSU racks
Program to find equivalence classes
Periodical meeting about the 'control system ‘
YE+3 Changes YE+3 X4A51 S4F04 Additions for TS ME+4/2/x chambers
Prepared for CSC by Fred Borcherding FNAL
PCMB Address Assignments per Station/Rack/Crate
Presentation transcript:

PXL Rack Layout Draft Leo Greiner January 2, 2013 DateCommentsPersonVersionApproved 01/02/2013Initial versionLG1.0LG 01/09/2013 add additional PS in WAH rack LG1.1LG Change Log

9U VME Shelf/misc PXL PS Control PC Standard 9U VME crate 12U Air flow space 5U PXL Clean Room Rack #1 3U 1U 5U Air flow space (can be top of open rack) 5U 1U Power cable routing 3-5U Power cable routing 3-5U Air flow space 2U

Shelf/misc RDO PC PXL Clean Room Rack #2 3U 5U Air flow space 5U RDO PC5U 1U Possible cable slack storage

Shelf/misc PXL PS 9U VME crate 12 (?) U PXL East Rack in WAH 3U 1U Power cable routing 3U Power cable routing 3U 9U VME Air flow space (can be bottom of open rack) 5U PXL PS1U Power cable routing 3U

PXL power supplies are: TDK-Lambda Corporation GEN8-180-LANGenesys(TM) DC Power Supply: 1500W, 8V, 180A, 1U, FULL RACK, input VAC, 47-63Hz, US, Embedded MD Slave Interface Options: LAN Interface - LXI Compliant Full specifications and manuals can be found at: lambda.com/hp/product_html/genesys1u.htm