Dec 12-14, 2005TBM Planning and Costing Meeting DCLL R&D Evaluations Summary Compiled by Neil Morley for the TBM Planning and Costing Meeting Dec 12-14,

Slides:



Advertisements
Similar presentations
Software Quality Assurance Plan
Advertisements

TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
NEES Project Management Workshop June 16 June 18 1 Segment 2.
The Information School at the University of Washington IMT 582 Readiness Assessment Bob Boiko UW iSchool ischool.washington.edu Metatorial Services Inc.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
ELC 347 DAY 2. Agenda Questions Working with MS Project 2003 Making a PB & J Sandwich.
Chapter 5: Project Scope Management
Project Management Session 7
4. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Explain the elements of project management and the responsibilities of a.
Chapter 5: Project Scope Management
LSU 07/24/2004Defining Project Tasks1 Defining the Project Tasks Project Management Unit, Lecture 4.
1-2 Training of Process FacilitatorsTraining of Coordinators 3-1.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
HP Project & Portfolio Management Resource Management July 11, 2007 CIMpleBS.com/HP-PPM/Training-Resource Management.pps By Dan Gallagher See NOTES page.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
CHAPTER 4 The strategic Planning function รศ. ดร. เสรี วงษ์มณฑา.
Full Process: From Application to Finalization
1 Framework Programme 7 Guide for Applicants
1 Chapter 5 Formulating Solutions: - Project and People Skills.
Enterprise Product Implementation Process. Components of a Successful Implementation  A detailed Scope Document for customer review and signoff  Creation.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives The Mission Report Purpose and objectives What is not needed? Evolution of the.
DCLL R&D Task Area Reports Compiled by Neil Morley for the TBM Conference Call Oct 6, 2005.
NEDM Construction Project Cost & Schedule Philosophy Vince Cianciolo, ORNL Physics Division Internal Cost & Schedule Review 02/11/2005.
Chapter 5: Project Scope Management Information Technology Project Management.
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
TBM Costing Lessons from Recent ITER Activities Scott Willms Los Alamos National Laboratory Presented at INL August 10, 2005.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
National Commission for Academic Accreditation & Assessment Developmental Reviews at King Saud University and King Faisal University.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems The Integrated Master Plan (IMP) and the Integrated Master Schedule.
© 2014 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected by Copyright and written permission should be obtained.
IS Analysis and Design. SDLC Systems Development Life Cycle Break problems into management review stages Control cost and time Works best with well understood.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives The Mission Report Purpose and objectives What is not needed? Evolution of the.
Scheduling and risk Icelandic International Development Agency (ICEIDA) Iceland United Nations University Fisheries Training Programme (UNU-FTP) Iceland.
PMI-Planning Process Group Lecture 08 Ms Saba Sahar.
 Definition of a quality Audit  Types of audit  Qualifications of quality auditors  The audit process.
DCLL TBM R&D Summary Compiled by Neil Morley for the TBM Conference Call Oct 27, 2005.
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
Why Standardize Metadata?. Why Have a Standard? Think for a moment how hard it would be to… … bake a cake without standard units of measurement. … put.
1 -TBWG next meeting 8 - Presentation of Parties, in particular on action 17 and action 19 (TBWG-15), including: Progress of work Impact on TBMs of frame.
Project Time Management
Project Setup and Execution For PMPlan Enterprise Presented by AlNik Solutions Copyright ©
Various Strategies for DCLL in the US Technology Program Poor ITER utilization (Lowest Cost Scenario) - Support EU HCLL effort, no independent DCLL TBM.
US ITER TBM DCLL ITER-TBM Plan and Cost Summary PbLi Flow Channels He-cooled First Wall PbLi He SiC FCI 2 mm gap US DCLL TBM – Cutaway Views 484 mm US.
Creating a Task List. Task Tasks are the most basic building blocks of any project Task represent the work to be done to accomplish the goals of the project.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
SCOPE DEFINITION,VERIFICATION AND CONTROL Ashima Wadhwa.
1 Project Management C13PM Session 2 Project Initiation & Definition Russell Taylor Business Department Staff Workroom
Microsoft Project 2010 ® Tutorial 1: Planning a Project.
UCLA - March 8, 2006 US TBM Cost Estimate Status March 8, 2006 Tom Mann.
 Project Time Management includes the processes required to accomplish timely completion of the project  Part of Triple Constraints  Managers often.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
1 Discussion with Drs. Kwon and Cho UCLA-NFRC Collaboration Mohamed Abdou March 27, 2006.
Highlights of US ITER TBM Technical Plan and Cost Estimates (and Impact of International Collaboration) Mohamed Abdou and the U.S. Team TBWG-17 Presented.
Creating a Work Breakdown Structure with Microsoft Project.
Chapter 16 Overview: Writing Proposals
Managing the Information Systems Project
Some General Guidelines for the US TBM Costing
Introductory Remarks and Meeting Goals
ARM Summary Report Template
Administrative Instructions – Short Version (Option 2)
IRRS REFRESHER TRAINING Lecture 4
Project Management Process Groups
How to Prepare a Quality Modification Request
US TBM Cost Activity Tom Mann December 12 – 14, 2005.
Compiled by Neil Morley for the TBM Conference Call Nov. 17, 2005
Definition of Project “An organized endeavor aimed at accomplishing a specific non-routine or low-volume task.” Definition of Project Management “The.
Presentation transcript:

Dec 12-14, 2005TBM Planning and Costing Meeting DCLL R&D Evaluations Summary Compiled by Neil Morley for the TBM Planning and Costing Meeting Dec 12-14, 2005

TBM Planning and Costing Meeting Main DCLL R&D areas R&DMorley47 Subtasks Tritium ControlMerrill/Willms3 subtasks Thermofluid MHDSmolentsev7 subtasks SiC/SiC Fab Process & PropertiesKatoh6 subtasks SiC/PbLi/FS CompatibilityPint4 subtasks FS Box Fabrication & Material IssuesRowcliffe/Kurtz/Dagher10 subtasks Helium Systems Subcomponent TestsWong2 subtasks PbLi Hydrogen ProductionMerrill1 subtask Be Joining to FSZinkle,Ulrickson4 subtasks Virtual TBMAbdou3 subtasks Advanced DiagnosticsMorley4 subtasks Integrated mockup testsTanaka/Fogarty3 subtasks

Dec 12-14, 2005TBM Planning and Costing Meeting Evaluating R&D Tasks  Summarize the main purpose of this subtask. What critical need does this R&D address? Is it more oriented towards (1) Establishing basic TBM feasibility for fusion (2) Understanding/predicting TBM performance required for design, or (3) Adding to safety and qualification database.  Summarize the risks to the machine or mission if this R&D is not performed.  Do you have suggestions for modification of this R&D Subtask to make it more useful or cost effective? For instance, you know of specific facilities, past work, capabilities that already exist that could be tapped for this work? Etc.  Categorize this subtask based on the following system: –E = Essential for the qualification and successful execution of the TBM experiment, and no other party is doing it –I = Important for the qualification and successful execution of the TBM experiment, or Essential but is definitely being done by another party –D = Desirable but the risk is acceptable if not performed  Categorize this subtask schedule over the next 10 year period based on the following system –B = Beginning 3-4 years. Needed immediately for preliminary design choices –M = Middle 3-4 years. Needed in the middle of the next 10 years after initial R&D is performed (for instance for qualification or integrated effects tests). –E = Ending 3-4 years. Needed before performance of first experiments or is specific for subsequent modules

Dec 12-14, 2005TBM Planning and Costing Meeting 10 year R&D Cost Estimate Summary (burdened, 2005 dollars, no contingency) R&D~$47.3M Tritium Permeation($2.8M)+$1m Thermofluid MHD$10M SiC/SiC Fab Process & Properties$2.25M SiC/PbLi/FS Compatibility$.75M FS Box Fabrication & Material Issues$15M Helium Systems Subcomponent Tests$.84M PbLi Hydrogen Production$2.4M Be Joining to FS (TBM PFC)$4.7M Virtual TBM$4.3M Advanced Diagnostics$2.7M Integrated mockup tests$4.34M

Dec 12-14, 2005TBM Planning and Costing Meeting DCLL 1 st Test Module Fabrication Schedule Summary *Prototype may or may not be full scale

Dec 12-14, 2005TBM Planning and Costing Meeting Main DCLL TBM R&D areas R&DMorley47 Subtasks Tritium ControlMerrill/Willms3 subtasks Thermofluid MHDSmolentsev7 subtasks SiC/SiC Fab Process & PropertiesKatoh6 subtasks SiC/PbLi/FS CompatibilityPint4 subtasks FS Box Fabrication & Material IssuesRowcliffe/Kurtz/Dagher10 subtasks Helium Systems Subcomponent TestsWong2 subtasks PbLi Hydrogen ProductionMerrill1 subtask Be Joining to FSZinkle,Ulrickson4 subtasks Virtual TBMAbdou3 subtasks Advanced DiagnosticsMorley4 subtasks Integrated mockup testsTanaka/Fogarty3 subtasks Yellow indicates some disagreement

Dec 12-14, 2005TBM Planning and Costing Meeting Resolving remaining conflicts  Let me speak to coordinator and people offering dissenting opinions and make a judgment for the first draft of the report  People can make a case offering a different opinion and we will note it in the report as well  Other suggestions? Committee, etc…

Dec 12-14, 2005TBM Planning and Costing Meeting What needs to be provided/written by task coordinators by Dec 23  Review the WBS structure (Attachment 1) and provide any suggested changes before proceeding with the following actions. Create lower level WBS elements to the point where costs will be collected (subtask level either 6 or 7).  Prepare a brief description of the work scope content for each WBS element for which you are responsible utilizing the format provided in Attachment 2. These descriptions should clearly reflect what is included or excluded from the associated estimate and the basis for the scope and requirements.

Dec 12-14, 2005TBM Planning and Costing Meeting What needs to be written (cont.)  Fill in the detailed cost sheet (Attachment 3), one for each WBS subtask level 6 and 7. For the current pre CD-0 cost activity, it is not necessary to have every element on the form completed, but where the detail is available, please provide it. Contingency is not included in the base cost.  Complete Attachment 4 by summarizing the detailed cost sheets completed in action 3.  Using Tables 2 and 3, fill in the assessment of the technical, cost, and schedule risks and the weighting factors on the bottom section of the detailed cost sheets generated in step 4 (Attachment 3) (one for each WBS level 6 and 7).

Dec 12-14, 2005TBM Planning and Costing Meeting What needs to be written (cont.)  Using the format in Attachment 4, provide a schedule network (list of activities and durations) for all of your Level 6 and 7 WBS elements, with at least 3 activities listed for each WBS element. When designating predecessors or successor activities, please be sure to consider activities that must be done by other participants and the Planning Milestones (see attachment 5). List key assumptions.  Review the milestones provided in Attachment 5; suggest others to show start or finish of significant project tasks. Provide the expected completion dates.  For each WBS level 5 (or below) list and describe the major risks utilizing Attachment 6 and the guidelines in Tables 4 – 6.