Report from GG5, Dec. 20, 2005 Report from ILC GG 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara.

Slides:



Advertisements
Similar presentations
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Advertisements

August 30, 2005 T. Shidara Snowmass - GG5 Summary1 Global Group 5 Summary Tetsuo Shidara Co-conveners: Bob Kephart, Wilhelm Bialowons.
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
Degree and Graduation Seminar Scope Management
Projmgmt-1/17 DePaul University Project Management I - Work Breakdown Structure Instructor: David A. Lash.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
How to integrate the parts of your project to achieve success.
IT Project Management Cheng Li, Ph.D. August 2003.
Report from ILC GlobalGroup 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara · GDE December 8, 2005.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
1 Draft NYISO 2003 Budget Report BS&P Report to Management Committee October 16, 2002.
1 Process Water and Air Treatment 01 June 2007 Emil Huedem, Maurice Ball, Lee Hammond Fermilab.
Federal Agency Update - A Public Real Estate Symposium Las Vegas, Nevada January 26, 2010 Procedures Guide for Right of Way Cost Estimation and Cost Management.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
Global Design Effort U.S. ILC Cost Translation R. Stanek, et al. Vic Kuchler 1/26/07.
EXAMPLE – Quality Control Plan For Consultants
Peter H. Garbincius November 20, 2008 Cost Management LCWS08 - UIC 1 ILC Cost Management J. Carwardine, T. Himel, F. Lehner,T. Shidara, L. Hagge, P. Garbincius,
CLIC Cost & Schedule WG: mandate, organization, activities 2009 Ph. Lebrun CERN, Geneva, Switzerland TILC’09 Tsukuba, Japan.
CLIC-ILC Cost & Schedule Agenda – 8feb08 John Carwardine = secretary & rapporteur this file: & Schedule Sub-Group.
Sendai, March 3, 2008 TILC08 · GDE Meeting Global Design Effort 1 TILC08 · GDE Meeting on International Linear Collider · Tohoku University Sendai · Japan.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
Work Breakdown Structure (WBS) Development
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
Applied Software Project Management
Status Update Outline  General remarks - reminder  Progress since last Annual Meeting – June 2010  Next steps - timeline EUROnu Costing Ilias Efthymiopoulos.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
VLCW July Global Design Effort1 Installation Global System Review F. Asiri W. Bialowons, T. Shidara Acknowledgment: C. Hauviller, R. Sugahara C.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
Develop Project Charter
1 ILC Internal Cost Review Major Points from External Reviewers T. Elioff, J. Marx, V. Soergel, M. Yoshioka, and A. Yamamoto, (C. Wyss, absent) To be presented.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Feasibility Study.
Systems Development Life Cycle
Chapter 14 Pricing and Estimating. Pricing and Estimating Many managers regard pricing as an art ! Many managers regard pricing as an art ! Information.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
CLIC/ILC Collaboration: 17/05/ 08Cost/Schedule Working Group1 CLIC-ILC Collaboration - #2 Cost and Schedule working group John Carwardine, Katy Foraz,
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
What is project management?
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Conventional Facilities and Siting GG Global Design Effort BILCW 07 - Beijing1 Conventional Facilities and Siting Global Group Summary Report.
Update on cost-related issues Philippe Lebrun Joint CLIC-ILC meeting on costs CERN, 12 June 2009.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
ILC EDMS Selection Committee Progress Report Tom Markiewicz SLAC 29 November 2005.
GAO’s Cost and Schedule Assessment Guides U.S. Government Accountability Office Applied Research and Methods Cost Engineering Sciences Jason T Lee, Assistant.
Systems Analysis Lecture 5 Requirements Investigation and Analysis 1 BTEC HNC Systems Support Castle College 2007/8.
ACD Down-Select Criteria and Time Scales for HLRF ML-KOM FNAL September 27 、 2007 S. Fukuda, KEK & Ray Larsen, SLAC For the ILC HLRF Collaboration.
1 March 19, Test Plans William Cohen NCSU CSC 591W March 19, 2008.
Value Estimate for the ILC Superconducting Modules and High Level RF
7.3 Determine Budget The process of aggregating the estimated costs of individual activities or work packages in order to establish an authorised cost.
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
Americas KlyCluster Cost Analysis Overview
EDR HLRF Work Packages Draft Summary
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
Controlling Project Cost and Schedule
Project Management Considerations
Executive Project Kickoff
Presentation transcript:

Report from GG5, Dec. 20, 2005 Report from ILC GG 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara · GDE December 20,

Report from GG5, Dec. 20, 2005 Summary of GG5 Cost & Engineering Establishing ILC standards Cost & schedule methodology Industrial issues Update since Snowmass First ideas of cost and schedule methodology Suggestion for project and engineering tools Summary Outline 2

Report from GG5, Dec. 20, 2005 The GDE Cost Engineers are trying to find a practical and pragmatic way, which will be accepted by the three regions, to speed up the process to obtain the cost estimate within the next year We are presenting a first idea which will be further developed up to beginning of next year Has to be confirmed by the GDE Design and Cost Board and the Executive Committee Introduction 3

Report from GG5, Dec. 20, 2005 Establishing ILC internal Standards is important Near-term actions –Choose an EDMS system –Choose cost and schedule software –Establish an engineering standards group –Choose common engineering tools (e.g. CAD system) –Define the cost & schedule methodology for ILC –Develop parametric models to guide the design Study other large international projects and LEARN ! * Presented by Robert Kephart on August 19, 2005 at Snowmass Summary of GG5* 4

Report from GG5, Dec. 20, 2005 EDMS Systems 5 A committee of an Electronic Data Management System for ILC was initiated and we are waiting for recommendations. A glossary of ILC terms & definitions will be created using this EDMS and this could expand with time to become the WBS dictionary. Selection of Project Management tools might be charged to this EDMS selection team.

Report from GG5, Dec. 20, 2005 Need to agree on a standard method for the “Basis of estimate” for the ILC project. –Use this method to identify the “core cost” of the project –Core cost = best guess of the cost of all materials, labor, and resources the Project will need to be built on an agreed upon schedule (50/50 that cost will be this number) –An all inclusive estimate. “Public” with nothing hidden or assumed –Industrial costs included, but encrypted in a way that the numbers will not be useful for “rigging” subsequent bids –No “hidden” contingency or risk management funds Regions can then “interpret” these numbers in the way the regional funding agencies are used to seeing –Example: increase task prices or add contingency to manage risk –Adjust labor costs as appropriate for the region, etc. Cost & schedule methodology 6

Report from GG5, Dec. 20, 2005 Agreeing on how to estimate the “core” costs is not enough –To estimate the cost & schedule, we must also have a “model” for how the project will proceed –Example: Regional funding agencies might force production of klystrons in 3 regions (3 orders of 200 klystrons will cost more than 1 order of –Get regional funding agencies to endorse this model early in the game (adjust as required) Cost & schedule methodology 7

Report from GG5, Dec. 20, 2005 General Methodology Create Technical Requirements Document Develop Technical Conceptual Design Create the WBS Establish C/S Coordinator for each Work Package Establish rules for C/S & define assumptions Set up tools and format for data input Develop the RLS and Mgm’t Docs Estimate Cost & Schedule and create the BOE Review No Yes Fund Starts C/S = Cost & Schedule WBS = Work Breakdown Structure BOE = Basis of Estimate RLS = Resource Loaded Schedule Interpret this Core Cost in each Region

Report from GG5, Dec. 20, 2005 Reliable cost estimate for the Reference Design Report (RDR) by the end of 2006 One common estimate of the ‘value’ and labor with (not too) different cost for the four sample sites Definition of the ‘value’ (adopting the ITER model) –Cost estimate on the basis of a (virtual) world wide call for tender as competition (world market price if exist) –Best price for best quality –Two vendors for same package for risk minimization –Parametric cost estimate for scaling (i.e. cost improvement) –Different parametric cost estimate for design to cost for ‘small’ changes (for large changes redo of the project) First ideas of cost and schedule methodology 9

Report from GG5, Dec. 20, 2005 ‘Definition of the ‘value’ (continued) –No tax is included –No escalation (fixed date i.e. January 2, 2006) –No contingency but with risk analysis –One currency (fixed exchange rates) –External labor is included in the value –Internal (institute) labor will be estimated in man years –Site dependent cost due to real reasons is taken into account (i.e. different geology and landscape, availability of electrical power and cooling water, different cycling rate of electrical power etc.) –Site depending cost due to formal reasons are not taken into account (International treaty above national laws) –No intellectual property rights First ideas of cost and schedule methodology 10

Report from GG5, Dec. 20, 2005 Cost estimate below level 1 won’t be public One common design (including the footprint) –Unavoidable differences due to physical reasons –Common set of rules, codes and laws which fits to the regional sets if the cost impact is negligible –Use of ILC standards if necessary or –Adoption after site decision with additional cost –Additional regional options are allowed (i.e. use of existing machines or substantial cost savings) First ideas of cost and schedule methodology 11

Report from GG5, Dec. 20, 2005 Standard project tools –We start with SLAC WBS tool, MS Excel for (parametric) cost estimate and MS Project for schedule –For crosscheck, structure sheets and schedule would be published without cost numbers –Adiabatic transfer to professional tools (Cobra with Primavera are promising), but have to be further investigated Standard engineering tools –One high-end 3D-CAD for the design including the civil engineering and common models excepting the foot print –Start with different tools (DESY makes a very first layout for an ILC twin tunnel design with IDEAS) –Adiabatic transfer to common tools Standard project and engineering tools 12

Report from GG5, Dec. 20, 2005 WorkBreakdownStructure WBS 13

Report from GG5, Dec. 20, 2005 First ideas of cost and schedule methodology WBS will developed on the basis of the TDR and US cold option study Parametric models will be developed Strawman baseline will be used for first round Next steps –More detailed design, requirements, parts list etc. –Definition of work packages –Industrial studies for cost drivers Summary 14