Relative Error on Parameter Pessimistic Estimate Optimistic Estimate β function at the LW 3% 1% LW readout error 2% 1% Laser spot waist 10% Laser Pointing.

Slides:



Advertisements
Similar presentations
Liverpool Accelerator Physics Group International Linear Collider (ILC) R&D The Cockcroft Institute The University of Liverpool is the lead organisation.
Advertisements

Fast and Precise Beam Energy Measurement at the International Linear Collider Michele Viti.
ATF2 Interaction Point Beam Size Monitor (Shintake Monitor) Status T. Yamanaka, M. Oroku, Y. Yamaguchi, S. Komamiya ( Univ. of Tokyo ), T. Suehara, Y.
Emittance Measurement Simulations in the ATF Extraction Line Anthony Scarfe The Cockcroft Institute.
ILC BDS Alignment and Tuning Studies Glen White SLAC/QMUL 8 November 2005 Progress report and ongoing plans for BDS alignment and tuning strategy.
12th January 2006Cockcroft, Liverpool/Daresbury1 ATF, ATF2 and a Beam Diagnostics Section for the ILC ATF, ATF2 and a Beam Diagnostics Section for the.
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
27 June 2006Ken Moffeit1 Comparison of 2mrad and 14/20 mrad extraction lines Ken Moffeit ILC BDS 27 June 06.
November 2005M. Woodley1 ILC Beam Delivery System layout with end-of-linac undulator.
Mon 03 July 06Laserwire Mini-Workshop1 Using Laserwires to Measure Emittance at the ILC Leo Jenner, Daresbury Labs.
Optics for Skew Correction and Emittance Measurement Leo Jenner This talk is going to look familiar if you were at the recent LC-ABD meeting in Manchester…
BDSIM simulations/results: Synchrotron Radiation and Muons Motivation and History Tracking results Synchrotron Radiation Tracking of Halo Muons News from.
2 February 2005Ken Moffeit Spin Rotation scheme for two IRs Ken Moffeit SLAC.
M. Woods (SLAC) Beam Diagnostics for test facilities of i)  ii) polarized e+ source January 9 –11, 2002.
1 ATF2 Tuning and its application to ILC and CLIC FFS/IR region ASTeC and MAN : working together on tuning methods for the ATF2 and ILC IR/extraction design.
Ground Motion + Vibration Transfer Function for Final QD0/SD0 Cryomodule System at ILC Glen White, SLAC ALCPG11, Eugene March 21, 2011.
IPBSM status and plan ATF project meeting M.Oroku.
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
Laser-wire Measurement Precision Grahame Blair Beijing- BILCW07, 6 th February 2007 Introduction Overview of errors Ongoing technical work in this area.
Laser Wire: :LBPM G A Blair EUROTeV Scientific Workshop, Uppsala 27 th August 2008 Introduction Emittance extraction Experimental programme Laser R&D Summary.
Energy Spectrometer for the ILC Alexey Lyapin University College London.
ILC BDS Static Beam-Based Alignment and Tuning Glen White SLAC 1.Aims. 2.Error parameters and other assumptions. 3.Overview of alignment and tuning procedure.
Wakefield Calculations for the ATF2 Beamline A. Lyapin, Wakefield Calculations for the ATF2 Beamline 1 S. Boogert, J. Snuverink (JAI/RHUL, UK)
Development of a Positron Production Target for the ILC Positron Source Capture Optics Positron beam pipe/ NC rf cavity Target wheel Vacuum feedthrough.
Status of ILC BDS Design Deepa Angal-Kalinin ASTeC/Cockcroft Institute, Daresbury Laboratory Andrei Seryi SLAC National Accelerator Laboratory ILC-CLIC.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
Laser-wire at ATF2 and PETRA Grahame Blair CERN, 18 th October 2007 Introduction Overview of errors Ongoing technical work in this area Plans for the future.
11th December 2007 LET workshop, SLAC 1 Beam dynamics issues in Beam Delivery System Deepa Angal-Kalinin ASTeC, Daresbury Laboratory.
27 MAY 2008NANOBEAM A laser-wire scanner for the ATF extraction line Alexander Aryshev, Stewart Boogert, Grahame Blair, Gary Boorman a Lawrence.
1 Overview of Polarimetry Outline of Talk Polarized Physics Machine-Detector Interface Issues Upstream Polarimeter Downstream Polarimeter Ken Moffeit,
EXT: Summary of activities, software development, and tuning performance 11th ATF2 Project Meeting, January M. Woodley1/29.
1 H. Hayano for the ATF collaboration Low Emittance Beam Generation in ATF H. Hayano for the ATF collaboration BPM electronics improvement emittance tuning.
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
Laser system for ILC diagnostics Sudhir Dixit: The John Adams Institute (Oxford)
1 Alternative ILC Bunch Compressor 7 th Nov KNU (Kyungpook National Univ.) Eun-San Kim.
1 Experience at CERN with luminosity monitoring and calibration, ISR, SPS proton antiproton collider, LEP, and comments for LHC… Werner Herr and Rüdiger.
PROBLEM 1 Show that the (beam size ^2) varies quadratically with distance in a drift section with no quadrupoles.
Design options for emittance measurement systems for the CLIC RTML R Apsimon.
Location of the LW detector- Simulation of the LW signals Lawrence Deacon RHUL ATF2 meeting August 23 rd 2006 KEK.
BDS Lattice Design : EDR plans GWP03 Meeting 04/12/2007.
Ken Moffeit SLAC LCWA09 1 Polarization Considerations for CLIC Ken Moffeit, SLAC 2009 Linear Collider Workshop of the Americas 29 September to 3 October.
Plans for Laser-wire System Grahame Blair 21 st June 2005 Brief overview of UK LW programme ATF Extraction line LW Plans for this year ATF2.
ATF2: Laser-wire Scheduling Strategy Grahame Blair Current Status Funding application Possible Scheduling Strategy Second ATF2 Project Meeting, KEK, 31.
ATF status M. Ross October 15, 2004 The ATF is the largest test facility built exclusively for linear collider RD –Utility not reduced by the selection.
Emittance measurements with multiple wire-scanners and quadrupole scans in ATF EXT C. Rimbault, Brossard, P. Bambade (LAL) Main goal : - Try to improve.
September 2007SLAC IR WS Very Forward Instrumentation of the ILC Detector Wolfgang Lohmann, DESY Talks by M. Morse, W. Wierba, myself.
29/10/09 Positron Workshop 1 Working Assumptions for Low Energy Operations Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
IWLC10, 18 th -22 nd October10, CERN/CICG 1 Global Design Effort Updates to ILC RDR Beam Delivery System Deepa Angal-Kalinin & James Jones ASTeC, STFC.
1 RTML Emittance Measurement Station Yuri Kubyshin (1), Robert Apsimon (2), Hector García (1,2) (1) Technical University of Catalonia (UPC) (2) CERN CLIC.
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
Status and plan of Beta-matching in Extraction line Kiyoshi Kubo.
2nd ATF2 Project Meeting (May 30, 2006)M. Woodley [SLAC]1 ATF2 Layout/Optics (v3.3) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
ILC BDS Commissioning Glen White, SLAC AWLC 2014, Fermilab May 14 th 2014.
ILC BDS Alignment, Tuning and Feedback Studies
Show that the (beam size ^2) varies quadratically with distance in a drift section with no quadrupoles.
Emittance Dilution and Preservation in the ILC RTML
at Royal Holloway Univ. London
Plans for Laser-wire System Grahame Blair 30th May 2005
Laserwire: high resolution non-invasive beam profiling
Beam Size Monitor Model
ILC BDS Emittance Diagnostics: Design and Requirements
Beam Optics Set-Up at SLAC End Station A
Emittance Diagnostics
M. Tigner, R. Helms, M. Palmer, D. Rubin, D. Sagan Cornell University
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
Emittance Diagnostics
ILC Beam Switchyard: Issues and Plans
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

Relative Error on Parameter Pessimistic Estimate Optimistic Estimate β function at the LW 3% 1% LW readout error 2% 1% Laser spot waist 10% Laser Pointing Jitter 15μm, 10% 0.5μm, 10% Beam Jitter 1.0 σ e, 10% 0.5 σ e, 10% Residual Dispersion 2.5mm, 10% 0.5mm, 20% Beam Energy Spread 1.5x10 -3, 20% 1.5x10 -3, 1% Total Error in Y >100% 23.8% L. Jenner, Liverpool University, Cockcroft Institute, Daresbury Laboratory, Warrington, U.K. D.Angal-Kalinin, CCLRC,ASTeC, Cockcroft Institute, Daresbury Laboratory, Warrington, U.K. G. Blair, I. Agapov, J. Carter, L. Deacon, John Adams Institute at RHUL, London, U.K. M. Ross, A. Seryi, M. Woodley, SLAC, Stanford, California, U.S.A. A STUDY OF EMITTANCE MEASUREMENT AT THE ILC At the ILC, the luminosity will depend on maintaining the emittance (especially in the vertical plane) delivered by the damping rings. An important part of this challenge is to remove any x-y beam couplings that arise from the linac and to measure the emittance. We propose to use laser-wires (LWs ) in the Beam Delivery System (BDS) to measure the beam sizes for both emittance diagnostics and coupling correction. The accuracy of the beam size measurement depends upon several factors such as errors from beam jitter, spurious dispersion functions, coupling of the beams, laser pointing stability and the beta functions at the LW locations. The effects of these errors on the emittance measurement accuracy and its implications for the skew correction procedure are considered. The emittance is measured by the LWs This information is iteratively fed-back to the orthogonal SQs such that the emittance reaches a minimum. The accuracy of this procedure is in part dependent on how well the true emittance can be reconstructed from the laserwire measurements. CONCLUSIONS  This study is still preliminary, however it is clear that the machine-related errors are significant and may dominate those coming from the LW itself; further work is necessary.  The extraction of the LW signal is also under investigation, using full simulation tools.  The energy-diagnostics chicane provides a good location for a detector for the Compton scattered photons, where a very large signal will emerge. The skew correction procedure works by iterating through the SQs and scanning across small range B-field settings, until the measured emittance at the LWs is minimised, see right. If the resolution of the measurement is too poor, the process can diverge. This problem can often be compensated for in part by making more measurements, or by increasing the number of steps in the scan; both are time consuming undertakings. The contributions of measurement errors on the beta functions, spurious dispersion, beam jitter, laser spot size, laser pointing error etc to the total measurement error. Considering the optimistic value of the measurement error is 23.8%, it can be seen that in general the procedure works satisfactorily. Initially the beam is set up such that the ratio of the projected (E2) to intrinsic (E y ) emittance is 3.8. This ratio is arrived at from linac simulations and representative of the expected quantity of x-y coupling in the ILC beam. After two scans of each skew quadrupole, the ratio is about 1.3. The error bars here are large due to the large measurement error. A traditional wire scanner cannot withstand the thermal load of a 250 or 500 GeV beam, as is expected at the ILC. A laserwire can make a non- invasive measurement of a beam by bringing a laser into collision with it and then measuring the forward-scattered Compton photons and electrons, see right. LW Compton events have been simulated using a dedicated full- simulation program (BDSIM), in order to determine the energy losses along the beam-line and to identify possible locations of Compton detectors. For a 250 GeV beam and using the baseline ILC BDS optics, approximately 98% of the Compton scattered photon energy exits at the downstream energy diagnostics chicane, shown left. Optical layout of the proposed skew correction and emittance measurement section at the ILC. LW-Laser Wire, SQ-Skew Quadrupole  x,y The difference in reconstruction for 5% and 20% error in the measurement at the LW. The reconstructed emittance for different values of the measurement error. Up to about 113 TeV of energy per bunch will reach the detector which will require installing shielding. In principle the scattered electrons can also be detected downstream of the LW. The energy loss due to these electrons is shown.