Southwest Renewable Energy Transmission Conference May 21, 2010 Jeff Mechenbier Director Transmission & Distribution Planning and Contracts.

Slides:



Advertisements
Similar presentations
FLORIDA PUBLIC SERVICE COMMISSON WORKSHOP ON RENEWABLE PORTFOLIO STANDARDS JULY 26, 2007 BY E. LEON JACOBS, JR. WILLIAMS & JACOBS.
Advertisements

The Big Picture Discussion with the Wyoming Infrastructure Authority and Joint Minerals Committee Steve Ellenbecker Wyoming Infrastructure Authority.
OHIO ENERGY POLICY PROGRESS & REVIEW UCEAO 6 th Annual Conference Securing Ohio’s Energy and Economic Future THE BEST OF TIMES, THE WORST OF TIMES: ADVANCED.
Public Service Company of New Mexico
Transmission Independence and Investment Pricing Policy for Efficient Operation and Expansion of the Transmission Grid FERC Docket Nos. AD and.
FERC Federal Energy Regulatory C ommission May 30, 2002 Inter-RTO charges and RTO Membership decisions.
 Jeremy Turner, Executive Director Phoenix, Arizona May 21, 2010.
1 Wind and Transmission Corridors Western Central Chapter, American Planning Association August 13, 2010 Dave Olsen
Queue Reform at the Midwest ISO NARUC February, 2008.
SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.
THE POWER OF POSSIBILITY Electric Transmission System Development in Alberta Neil J. Brausen, P. Eng., Director System Planning APEGGA Calgary Branch Luncheon.
Western States Energy & Environment Symposium October 27, 2009.
Transmission Barriers to Wind Energy in the West Presented by: Pamela Jacklin Stoel Rives LLP POWER-GEN Renewable Energy & Fuels 2007 Conference Mandalay.
AMERICAN PUBLIC POWER ASSOCIATION NATIONAL MEETING Salt Lake City June 15, 2009 Panel: “WHAT DOES IT TAKE TO GET TRANSMISSION BUILT?” Remarks of James.
The Potential for Increased Cooperation on Offshore Wind among the Northeast States Warren Leon, Executive Director.
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
. Juan de Fuca Cable. Safe Harbor Statement Included in this document is certain information which is “forward looking information” as defined by the.
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Transmission Incentives P. Kumar Agarwal Acting Director, Division of Reliability & Engineering Services Federal Energy Regulatory Commission U.S. DOE,
Wind Energy in Maryland. Onshore Utility Scale MEA continues to work to facilitate development of utility scale wind energy projects in Maryland. The.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
By: Ed Flippen, Partner, McGuireWoods LLP, and Lecturer at the University of Virginia School of Law and Duke University School of Law US Electric Deregulation.
CapX 2020 Transmission Initiative Progress Through An Alliance Approach American Public Power Association E & O Technical Conference Atlanta, Georgia April.
MIDWEST ENERGY OUTLOOK THE ROLE OF COMPETITIVE POWER SUPPLIERS ENERGY MARKETS IN TURMOIL May 17, 2001 Freddi L. Greenberg.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
Oregon Renewable Energy Action Plan April 2005 with Geothermal Energy highlights by Carel DeWinkel Senior Policy Analyst.
Renewables Portfolio Standard: Progress and Perspectives Aaron J. Johnson Director, Renewable Energy Policy & Strategy February 1, 2011.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Obstacles and Opportunities for Renewable Energy Transmission Carl Zichella, Sierra Club Southwest Renewable Energy Transmission Conference, Phoenix, AZ.
“Transmission Siting and The Federal Landscape” Remarks of James J. Hoecker Husch Blackwell Sanders Former Chairman of the FERC Public Participation In.
Pat Wood III, Chairman Federal Energy Regulatory Commission Bringing Power to California Customers Silicon Valley Manufacturing Group May 27, 2004.
ThinkEquity Summer Call Series “CAN WE DEAL WITH THE CHALLENGES TO GETTING TRANSMISSION BUILT?” Remarks of James J. Hoecker Husch Blackwell Sanders LLP.
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
Kansas Renewable Energy Conference September 26th, 2007.
OSC Meeting April 27, Transmission Cost Allocation Overview.
Transmission for a 33% RPS Keith E. Casey Vice President Market and Infrastructure Development California ISO The Independent Energy Producers Association.
Mandatory Electric Reliability Standards and Transmission Expansion Suedeen G. Kelly Commissioner Federal Energy Regulatory Commission The Canadian Institute.
The Right Renewable Energy Contract Mechanism Aaron Rothschild November 14, 2011 Keeping Rates Low By Aligning The Interests Of Investors And Consumers.
Office of Electricity Transmission and Distribution September 2003 Marshall Reed U.S. Department of Energy.
Feed In Tariffs A Policy for Rapidly Expanding Renewable Energy Deployment.
California Energy Commission Renewable Energy Transmission Initiative (RETI) Part I Jeffrey D. Byron California Energy Commission Energy Action Plan (EAP)
Iowa State University Ames, IA July 5, 2011 Wind on the Wires – Wind and Transmission Issues Beth Soholt Wind on the Wires
Integrating More Renewable Energy in the Grid Bert Garvin Vice President, Regulatory Affairs July 21, 2008 NARUC Summer Meeting July 22, 2008.
California Independent System Operator Joint Agency Energy Action Plan Meeting Generation Interconnection Queuing & Streamlining Dennis Peters, Lead Interconnection.
Renewables Integration Development Project North West of the Island of Ireland Louis Fisher, EirGrid.
California Transmission Planning Group Collaborative approach to State-wide Transmission Planning.
Western Renewable Energy Zone Project October 29, 2009 John Savage Oregon Public Utility Commission.
Demand Response in Energy and Capacity Markets David Kathan FERC IRPS Conference May 12, 2006.
Cost Allocation Proposals associated with MISO Transmission Expansion WIEG Board Meeting May 6, 2010 WIEG Board Meeting May 6, 2010 Presented by: Kavita.
Transmission Issues & Renewables Perspectives of a Wind Developer.
Renewable & Alternative Power Senate Energy, Utilities & Communications Committee Stuart R. Hemphill Director, Renewable and Alternative Power Southern.
Bob Anderson West Wind Wires Siting and Policy Wind Power Plants* 119th Annual Convention Anaheim, CA November 16, 2007 NARUC *transmission, too.
OFFSHORE WIND CONNECTION & COSTS Mary Doswell Alternative Energy Solutions December 7 th, 2010.
Designing Energy Solutions without Borders National Association of Regulatory Utility Commissioners National Association of Regulatory Utility Commissioners.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
1 Distributed Renewable Generation Legislation as of 5/02/07  SB 483 by Fraser- Relating to the regulation of electric generation capacity ownership in.
Lauren Azar Senior Advisor to the Secretary U. S. Department of Energy May 31, 2013 – WI Public Utilities Institute 1 Transmission Planning – A National.
Bob Cupit Manager, Energy Facility Permitting Minnesota Public Utilities Commission.
Renewable Energy Transmission Initiative 2.0 Organizational Structure and Work Plan California Energy Commission and California Public Utilities Commission.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
RETI 2.0 Objectives The Clean Energy and Pollution Reduction Act of 2015 (Chapter 547, Statutes of 2015) increases the RPS to at least 50 percent of retail.
Dale Arnold Director, Energy Services Ohio Farm Bureau Federation.
UTC STUDY OF DISTRIBUTED GENERATION AND RECOMMENDATIONS Presentation for the Washington Future Energy Conference October 19, 2011.
Restructuring Roundtable June 12, 2009 Dave Boguslawski Vice President – Transmission Strategy & Operations Northeast Utilities.
Damitha Kumarasinghe Director General
Transmission: the Critical Link
FERC Order 1000 One Transmission Owner’s Perspective
SunZia Project Description
Clair Moeller Mid-Continent ISO
Gordon van Welie, President & Chief Executive Officer
Presentation transcript:

Southwest Renewable Energy Transmission Conference May 21, 2010 Jeff Mechenbier Director Transmission & Distribution Planning and Contracts

Barriers to Development of Interstate Transmission For Renewable Generation  Few PPAs are being inked, projects are very slow to move forward with signed agreements  No Clear Federal Policy on RES, Cost Allocation, Siting  State regulators limit cost recovery to transmission that benefits state jurisdictional utility customers  Inconsistent State RPS policies –West wide REC Trading cumbersome  In-State preferences for renewable energy development  Lead time for transmission is much longer than generation development  Poor economics due to low capacity factor of renewable resources and high incremental cost of new transmission  Existing FERC Pro forma generation interconnection procedures are inefficient  Sequential processing results in suboptimal expansion plan for transmission system  Developer decisions “in process” at each offramp impact projects behind them in the queue. Restudies paralyze the process.  Interconnection does not result in deliverability. The process for interconnection is a different business line from the delivery business. FERC regulations do not allow utilities to combine them.  Non-viable projects clogging queue

How Best to Collaborate?  State and Federal agencies need to establish clearly defined transmission corridors to minimize ROW and permitting hurdles for renewable energy zones.  Collaboration needs to begin at the federal/state level to address conflicting goals of governments. Federal and state policies are not aiming at the same targets.  States need to establish standard renewable products to allow for trading of RECs.  Pricing Policy needs to allow for rational grid expansion to ensure costs are equitably shared.  Transmission is a regional issue - All stakeholders in the region need to cooperate in solution (Continue regional transmission provider sponsored transmission group collaboration).

Transmission Lines Not To Scale Major Conceptual Transmission In and Around New Mexico SunZia (500 kV) HVDC Tres Amigas