© DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services DeHiGate (CELTIC No: CP02-008) WP1 Status Pekka Parviainen TKK.

Slides:



Advertisements
Similar presentations
Environmental Health Tracking Technical Team Meeting 1 Future Assessment and Needs Assessment Advisory Discussion Craig Wolff IT/GIS Manager March 5, 2003.
Advertisements

© Otaverkko Oy 8/2000 MediaPoli - gigabit piloting environment Tuomo Karhapää Network Manager Otaverkko Oy
Pervasive Wireless Solutions © Copyright IBM Corporation 2004 IBM La Gaude Smart Home / Intelligent Building Jean-Michel Corrieu IBM Europe Technical Manager.
Dr. Stelios C.A. Thomopoulos Dr. Sotiris Kanellopoulos
Promoting Innovative Intermodal Freight Transport PROMIT 5 th Workshop, Bologna, 20/21 November 2007 PROMIT Co-ordination Action Promoting Innovative Intermodal.
Piedmont Regional Voice over IP Pilot Project Law Enforcement Information Management Conference Greensboro, N. C. May 21-24, 2007 Major Dean Hairston,
Key Challenges in the Field of Violence Against Women with Disabilities and Deaf Women Overview Overarching Challenges Barriers to Services Barriers to.
New market instruments for RES-E to meet the 20/20/20 targets Sophie Dourlens-Quaranta, Technofi (Market4RES WP4 leader) Market4RES public kick-off Brussels,
Rob Marchand Genesys Telecommunications
LONG: Laboratories Over Next Generation Networks. LONG Laboratories Over Next Generation Networks Jordi Domingo-Pascual Josep Mangues-Bafalluy Advanced.
Presentation for KoKom Bergen, Norway 10 August 2005 Helsinki University of Technology (HUT) HUT and User Studies Presented by: Delia Berrouard
Overview October, 2006 Volpentest HAMMER Training and Education Center Operated by Fluor Hanford for the U.S. Department of Energy.
BioSec Biometrics & Security IST © 2005 BIOSEC Consortium 1February 2005 BioSec Biometrics & Security Orestes SanchezBioSec Coordinator Telefónica.
User requirements Thomas Finholt, Elizabeth Wierba, and Jeremy Birnholtz CREW, School of Information University of Michigan.
Georgia Interoperability Network Training Project Overview Mark Hodges Georgia Tech Research Institute.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 Plan 1 st period Inova+
Goals Metrics Benefits MilestonesTechnology Challenges A.1 Mobile power – “always on” Identify, implement and test the best ways to use existing technology.
Architecting Secure Mobile P2P Systems James Walkerdine, Peter Phillips, Simon Lock Lancaster University.
st European Security and Safety Summit Brussels EMERGENCY RESPONSE CENTRE OPERATOR TRAINING IN FINLAND Instructor Rauni Komulainen.
Business Data Communications, Stallings 1 Chapter 1: Introduction William Stallings Business Data Communications 6 th Edition.
The Preparatory Phase Proposal a first draft to be discussed.
ITEA Easy Wireless project (EW-VTT) Milla Huusko
Microgeneration and new end-use technologies in ADDRESS, INCA and SEESGEN-ICT Jussi Ikäheimo (VTT) (& Regine Belhomme, Giovanni Valtorta) IEA DSM 17 workshop.
IP-Based Emergency Applications and Services for Next Generation Networks PEACE Presented by Suji Gunaratne PhD.
5th GridLab Review, 8 April 2005, Amsterdam WP12: Access for mobile users What's new in mobile user support Piotr Grabowski, Bartek Lewandowski
Tools and enablers for building applications for EADS TETRA
Jessica Dyer Emerge Mobile Tech Emerging Safety Technology.
CENTER FOR SECURITY STUDIES Dr. Georgios Leventakis Senior Security Expert
Work Package 2 Communication & Dissemination Leader: TUC.
DORII review Remote instrumentation communities and application support NA3 Roberto Pugliese Sincrotrone Trieste SCpA.
Crete, September, RURAL WINGS IP Usability Evaluation Framework (task 7.1) Current Status RURAL WINGS 4. Project Meeting Crete,
Advanced Next gEneration Mobile Open NEtwork Tridentcom th International Conference on Testbeds and Research Infrastructures for the Development.
EHealth Partners Finland Finnish Agency for Technology and Innovation Tekes grants no /06 and 70030/06 Needs analysis at pilots by.
© 2010 Adobe Systems Incorporated. All Rights Reserved. Adobe Confidential. A+ Communication Strategies Emily Timmerman | Adobe Connect Solutions Consultant.
ANDROME – WP3 - Applications definition and development | Enabling Community Communications-Platforms and Applications | WP3 : Applications.
TECHNOLOGY FOR A CHANGING WORLD. Partners in WP Austrian Technologies DSTS Hamburg Fire Brigade Research Institute of the Red Cross University of Defense.
EDUCAUSE 2005 Annual Conference October 19, 2005.
1 Contribution of IST projects to EMTEL on user requirements Krisztina Cziner Helsinki University of Technology EMTEL meeting, Stockholm, 1st of Sept,
Terminal Services Technical Overview Olav Tvedt TVEDT.info Microsoft Speaker Community
Demonstrators and Pan-European Services Laboratory WP5 session.
Research Institute of the Red Cross CAST Kickoff, July 15-17, 2009 WP5: Organisation and Training of Response Staff – Comparative Assessment of Current.
WP0 session Management and External Relations. Código 00/00 2 Index Overview A1: Project co-ordination A2: Dissemination and Exploitation Plans A3: External.
ECOGEM Cooperative Advanced Driver Assistance System for Green Cars Burak ONUR Project Coordinator R&D Support Executive
Virtual Classes Provides an Innovative App for Education that Stimulates Engagement and Sharing Content and Experiences in Office 365 MICROSOFT OFFICE.
Workshop on Public Safety and Security Research 28 February 2008; 14:30 -16:30 EET Marina Congress Center, Katajanokanlaituri 6, Helsinki, Finland Marina.
1 reTHINK Deliverables, How To Read reThink deliverables quick starter.
Module 7: Configuring Terminal Services. Overview Describe how the components of Terminal Services work together Identify new Terminal Services core features.
IST project ePerSpace N° IST integrated project ePerSpace Contract N°: Ádám Kapovits, Eurescom 8/11/2004.
& 12/09/2002 Project MESA Andy Reynolds European Vice-Chair Service Specification Group - Services and Applications
Microsoft ® Lync On-Line ™ SIP Trunking in the Cloud.
Integrated Knowledge System on Climate Change Adaptation Conceptual & Technological Framework OneWorld South Asia December 2008.
EVD PREPAREDNESS UPDATE | FOR INTERNAL USE ONLY 1 |1 | Health Emergency Preparedness 12 January 2016.
International Network of Treatment and Rehabilitation Resource Centres Prevention, Treatment and Rehabilitation Unit Global Challenges Section.
ERASMUS+ EMREX – Field trial on the impact of enabling easy mobility on recognition of external studies Title and date.
NATO UNCLASSIFIED 1 TETRA Applications for Military Communications Radio Branch NATO Command, Control & Consultation Agency Radio Branch NATO Command,
Observations on uses of telecommunication in emergency management Harriet Lonka, Gaia Group Ltd Emergency Telecommunications Workshop.
T Iteration Demo Tempus I1 Iteration
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP2 Overview Instituto Pedro Nunes Co-Living 12/3/ Paulo Freitas - Instituto.
Community for Risk Management & Assessment Kick-off January 20 th Brussels N. van Os Veiligheids Regio Zuid-Holland Zuid (Safety Region South-Holland South)
Steering group -meeting in The 1st meeting of the steering group will be held in the premises of the project coordinator in Tampere. During.
Dr. Stelios Panagiotou, Dr. Stelios C.A. Thomopoulos Integrated Systems Laboratory Institute of Informatics and Telecommunications National Center for.
FITMAN Phase III Webinar Katerina Achinioti 1, Clare Hooper 2 ( 1 Innovalia Association, 2 IT Innovation) 19 November 2013 FITMAN Phase III Webinar 1 19/11/2013.
Integrated Project Management Information System (PMIS) for Partner Capacity Strengthening Dangana Chibuzo (Database Manager) CRS Nigeria Country Program.
1 June 9 th, WARD ICT Mobile Summit W D 4 WP1 - BIRD Business Innovation, Regulation and Dissemination Luis M. Correia, IST-TUL, PT Klaus.
Advancing National Wireless Capability Date: March 22, 2016 Wireless Test Bed & Wireless National User Facility Paul Titus Department Manager, Communications.
ASSTAR Project Overview & User Forum Objectives
e-Invoicing – e-Ordering 20/11/2008
Preparing for the Windows 8.1 MCSA
Microsoft Virtual Academy
Álvaro Arrúe – Applus IDIADA
Presentation transcript:

© DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services DeHiGate (CELTIC No: CP02-008) WP1 Status Pekka Parviainen TKK – Helsinki University of Technology Finland

© DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services Agenda: 01 WP1 Overview 02 WP1 Status 03 WP1 Deliverables this term 04 WP1 Deliverables next term 05 Other…

© DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services Agenda: 01 WP1 Overview 02 WP1 Status 03 WP1 Deliverables this term 04 WP1 Deliverables next term 05 Other…

© DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services WP1 Overview 1 WP1 Goals  Define the lead applications and their operational scenarios  High-speed data applications  Demanding requirements for user interfaces  Gateway requirements and wide area networking  Reliability, security and service quality are key attributes  Create real added value to the public safety field operations  Used for the development of requirements in WP2 and system architectures

© DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services WP1 Overview 2 WP1 Sub packages  T1.1 Interaction with user community and user studies  Contribute to network features and operational scenarios  Contribute with contacts with user communities  User requirements studies: reference scenarios studies, applications, deployment strategy, and feasibility with emergency protocols  Initial review and assessment of key applications  Report on the viability of the key applications and further guidance  Use case description of the selected key applications in practical field operations  Studies on functional applications to make Gateway use easier for Emergency services users

© DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services Expert Discussion Workshop Date:10th of November 2005 Location: City of Helsinki Rescue Department All key users in public safety communications (meeting minutes) Helsinki Rescue Department Finnish Naval Military Poliisiosasto / Police of Helsinki Helsingin ja Uudenmaan sairaanhoitopiiri (HUS) Finnish Red Cross Suomen Erillisverkot Oy

© DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services Demands of Different organisations For small and large scale scenarions IR camera for smoke diving data connections to hospitals connect the mobile command center to fixed IT servers how to have reserved capacity available online geographic images for field units air to ground video remote surveillance of patrolling police officers vital functions

© DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services WP1 Overview 3 WP1 Sub packages  T1.1 Interaction with user community and user studies  Description and a work-plan of trial/simulation set-up and required technologies for the use cases  Description on the result of the trial/simulation, plan for the improved/modified trial  Assessment and evaluation of the results of the simulations and trials  Studies on current technological Platforms of Emergency services  Users Interfaces Requirements

© DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services WP1 Overview 4 WP1 Deliverables:  D1.1 Initial assessment of key applications, user studies report. Scenarios, operational requirements, and applications  D1.2 Report on the viability of the key applications and user guidance

© DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services WP1 Overview 5 WP1 Leader  EADS Finland WP1 Partners  TKK  UNIK  Telefonica I+D

© DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services Agenda: 01 WP1 Overview 02 WP1 Status 03 WP1 Deliverables this term 04 WP1 Deliverables next term 05 Other…

© DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services WP1 Status  Deliverables have been produced in time  User workshop was organized in 2005 with Finnish participants from different public safety fields  Assessment document for Kuopio Field Trial written  Technical document with minor user assessments  Concentration on multicast video

© DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services Agenda: 01 WP1 Overview 02 WP1 Status 03 WP1 Deliverables this term 04 WP1 Deliverables next term 05 Other…

© DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services WP1 Deliverables this term WP1 Deliverables:  D1.1 Initial assessment of key applications, user studies report. Scenarios, operational requirements, and applications

© DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services Agenda: 01 WP1 Overview 02 WP1 Status 03 WP1 Deliverables this term 04 WP1 Deliverables next term 05 Other…

© DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services WP1 Deliverables next term WP1 Deliverables:  D1.2 Report on the viability of the key applications and user guidance  T0 + 30