In-Kind Contribution Management Update Allen Weeks March 20, Lund.

Slides:



Advertisements
Similar presentations
JOINT LEGISLATIVE AUDIT COMMITTEE HEARING SENATE BUDGET and FISCAL REVIEW COMMITTEE Delivering Energy Savings for California AMERICAN RECOVERY & Karen.
Advertisements

Public Private Partnerships P3s What the Public Sector Considers When Selecting the Right Private Partner Jose A. Galan - Division Director Miami-Dade.
The New EU Framework Programme for Research and Innovation HORIZON 2020 Judit Fejes Executive Agency of Small and Medium Enterprises (EASME)
ESS Accelerator Design Upgrade Project Suzanne Gysin Prject Support Officer ESS Accelerator Division , SLHIPP-1
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
Research and Innovation Research and Innovation Research and Innovation Research and Innovation Research Infrastructures and Horizon 2020 The EU Framework.
Westminster City Council and Westminster Primary Care Trust Voluntary Sector Funding 2009/10 Voluntary Sector Funding Eligibility, Application Form Funding,
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
H. Danared | Sw/Fr Coordination Committee | Page 1 Swedish/French Coordination Committee Håkan Danared Saclay, 13 January 2015.
ESS Update and Meeting Goals
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
European Spallation Source A World-Leading Centre for Materials Research and Life Science with Neutrons HEPTech Workshop 7 May 2013 James H. Yeck CEO ESS.
TIARA WP2 Report and wrap-up Final Annual Meeting R. Aleksan Nov. 27 th, 2013.
1 FP6 into perspective. 2 Understanding the context and exploiting the opportunities FP6 into Perspective The European Union.
Working with EUROPEAID
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
1 1 BRANCH: CORPORATE AFFAIRS 1. CORPORATE MANAGEMENT SERVICES To provide financial and strategic support services that enhance service delivery by the.
Kaname Ikeda, October Status of the ITER Project Status of the ITER Project Kaname Ikeda ITER Nominee Director-General October 2006.
Coordinating EC Research Projects Paul Drath Singleimage Limited 3 Foundry Walk St Ives Cambs PE27 5FW phone fax
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
Session 13 CPIP Formulation Process Project for Capacity Development for Implementing the Organic Law at the Capital and Provincial Level (PILAC 2)
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
Public-Private Education Facilities and Infrastructure Act 2002 (PPEA) Joe Damico.
WIPO Pilot Project - Assisting Member States to Create an Adequate Innovation Infrastructure to Support University – Industry Collaboration.
Technical advisory panel Mission Brief. Requirements Have the principal requirements of the facilities suite of instruments, in terms of equipment types.
EuropeAid How to benefit from EC grants? ‘Calls for Proposals’ Thematic Operations EuropeAid Cooperation Office.
EuropeAid How can an NGO benefit from EC grants? ‘Calls for Proposals’ Thematic Operations EuropeAid Cooperation Office Athens, 25 September 2008.
North East Lincolnshire Council delivering change through partnership ( Physical Regeneration, Property and Technical Services Partnership) Planning in.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Inter-American Development Bank Private Sector Financing and the IDB Presentation by the IDB Private Sector Department February 2004.
Project preparation workshop “Bringing a transnational project to life” Project idea “Challenges and chances from Climate Change for regional and local.
Practical Information and Guidance to Applicants Green Industry Innovation Programme Romania July 2014 Practical Information and Guidance to Applicants.
Atlantic Innovation Fund Round VIII February 5, 2008.
TEN-T Executive Agency and Project Management Anna LIVIERATOU-TOLL TEN-T Executive Agency Senior Programme and Policy Coordinator European Economic and.
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
WP4 : Financial work Elisabeth KOHLER Helle PEDERSEN (CNRS)
H. Danared | Cryomodule Workshop | Page 1 The In-Kind Process at ESS Håkan Danared Lund, 15 October 2014.
GEO Implementation Mechanisms Giovanni Rum, GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
General overview of WU : Cryogenic Distribution for Elliptical Linac Jarosław Fydrych Cryodistribution Project Engineer Preliminary Design Review,
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
H. Danared | TB12, 5 Mar 2015 | Page 1 Håkan Danared Mats Lindroos Lund, 5 March 2015 Status of In-Kind Contributions to Accelerator.
European Spallation Source Science Advisory Committee February 5-6, 2014 Jim Yeck CEO & Director General.
Jacobs Aston Conference 2009 The vital role of local government and PPP capital programmes Chris Wilson Executive Director 4ps 30 th April 2009.
PROCUREMENT RULES FOR EXPERIMENTS AT CERN Dante Gregorio CERN Procurement Service.
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
H. Danared | Collaboration Board | Page 1 Status of In-Kind Contributions Håkan Danared Legnaro, 1 December 2014.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.General Context 3.Building TIARA 4.Conclusion.
Instrument Construction Phase 1 and beyond Rob Connatser Chief Instrument Project Engineer September, 2014.
In-Kind Strategy Integrated Control Systems Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
ESS Accelerator| Construction Phase| | MC | 1 ESS Accelerator management & governance for Product Integration - Construction phase 25 January 2013.
Rob Connatser NSS Instrument Work Packages and XLPM.
H. Danared | Collaboration Board, March 2014 | Page 1 Status of In-Kind Contributions to Accelerator Håkan Danared Kastrup, 14 April 2014.
ACCSYS Design Reviews J. G. Weisend II Deputy Head of Accelerator Projects.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Making Difficult Decisions in a Transparent Way –
What is a grant? A direct financial contribution – donation – from EU budget An action - contributing to EU policy achievement Functioning of a body acting.
Ways to industry participation in CLIC 24th October, 2017
Enterprise Content Management Owners Representative Contract Approval
EU instruments of funding and technical assistance
ESS Cooperation: New Financial supporting frameworks?
ESS Project Status Roland Garoby – Technical Director August 2018.
Cofindustria OVERVIEW OF THE WORLD BANK PROGRAM IN SERBIA
European Spallation Source ERIC Procurement
Preliminary Project Execution Plan
Sustainable Public Procurement
Presentation transcript:

In-Kind Contribution Management Update Allen Weeks March 20, Lund

Contents IKC Potential for construction phase IKC Agreed and Planned vs total Possible value HoA/IKC Agreements planned for Q1 and Q2 2015

Host Countries of Sweden and Denmark 47,5% Construction 15% Operations In-kind Deliverables ~3.5% Cash Investment ~96.5% Non Host Member Countries 52,5% Construction 85% Operations In-kind Deliverables ~ 70% Cash Investment ~ 30% Financing includes cash and deliverables

ESS construction funding status

5 ESS In-Kind Contributions – General principles Potential in-kind contributions are defined by the ESS Programme Plan Values based on ESS Cost Book Each contract to follow a pre-defined structure The delivering party is wholly responsible for the contribution (technical, financial, commercial) In-Kind Review Committee to evaluate all IKC agreement proposals ESS STC/Council to approve all in-kind contracts Based on final evaluation the Member Country gets accredited the value of the In-Kind Contribution

Construction cost: € 1,84 Billion In-kind: € 750 Million Accelerator Instruments TargetControls 65% 59% 65% 75% € 509 M € 350 M € 155 M € 71 M ESS In-kind Goals

Increase Emphasis on In-Kind Commitments by member countries to fund over one-third of ESS as in-kind Partners identified for more than €400M value of WPs (55% of estimated total in-kind value) 51 agreements in place by the end of Q1 & Q – over €100M In-kind agreements on the critical path – essential to close IKC agreements with partners in 2015 to avoid schedule delay 7

The ESS Organization ESS Council Director General James Yeck Admin & Finance Committee In-Kind Review Committee Technical Advisory Committee Scientific Advisory Committee Communications, External Relations & In-kind Environment, Safety, Health & QA Technical Directorate Science Directorate Project Support & Admin. Directorate Conventional Facilities

ESS In-kind contributions – In-Kind process EOI response ESS + Potential party discussion Contract proposal IKRC recommendation + Council approval IKC frame contract + technical annex Detailed Design Phase ESS + Partner Critical Design Review (CDR) Realization and Verification ESS + Partner System Acceptance Review (SAR) IKRC + Council approval Transfer of ownership IKC value crediting to member country

10 ESS In-kind Criteria Eligible partners Public Institutes/ universities Partnership of public & private organizations Partner selection criteria Relevance to project requirements Technical capabilities and capacities Management and human resources Procurement capabilities Quality/Risk management Historical track record and references Availability of funding Acceptance of ESS Schedule and Cost book value

11 IKC Agreement template documents published

12 Project leaders, together with IKCM and ESS management select partners. Potential partners may appeal to IKRC.

IKC – Agreed, Planned and Potential activities in Primavera Accelerator Target NSS ICS WBS L2 Sum of 2014 Sum of 2015 Sum of 2016 Sum of 2017 Sum of 2018 Sum of 2019 Sum of 2020 Sum of 2021 Sum of 2022 Sum of 2023 Sum of 2024 Sum of 2025 Sum of Total 111,66512,87567,38392,47779,90228,9608,0296,7362, , ,27423,09342,12030,6992, , ,93523,91327,35635,02036,68129,02324,03719,87712,0255,9301,418220, ,52210,3049,8704, ,698 Grand Total1,76423,417120,912172,256155,49173,25237,05230,77322,12612,0255,9301,418656,416

IKC Planned value vs Potential (cumulative)

Accelerator IKC 15 ProjectDescriptionBudgetAgreed+PlannedPossible Grand Total Agreement signed or shortlisted to one partner Further value possible to be provided as in-kind 11Accelerator Systems511,225 k220,476 k79,801 k 11.0 Budget Reserve. ACCSYS Project Milestones and Main Phases during Construction6,264 k0 k 11.1 Management & Administration20,684 k0 k 11.2Accelerator Physics14,565 k7,302 k1,622 k 11.3 Normal Conducting Front End31,347 k22,034 k10,194 k 11.4 Spoke Cavitites and Cryomodules (CNRS)16,882 k15,119 k0 k 11.5 Elliptical Cavities and Cryomodules104,046 k98,547 k0 k 11.6Beam Delivery Systems7,726 k0 k 11.7Beam Diagnostics23,232 k1,103 k9,955 k 11.8Radio Frequency Systems116,628 k51,646 k35,715 k 11.10Test Stands14,468 k2,056 k0 k 11.11Cryogenics56,073 k9,990 k8,371 k 11.12Vacuum14,302 k0 k8,175 k 11.13Safety1,643 k0 k Lead Engineers and Availability7,336 k0 k 11.15Electrical Support6,798 k0 k 11.16Cooling Support7,759 k885 k1,217 k 11.17Power Converters51,340 k11,793 k0 k 11.99Installation10,134 k0 k4,551 k

16 The ESS Collaboration Framework Industrial Liaison Officers ESS Project In-kind Partner Industrial Partner Funding Agency ESS Council In-kind Review Committee

17 Summary ESS is already underway and very schedule driven. Industrial Partners should view ESS long-term, as a development opportunity, and with an eye to other research infrastructure. The project is a major European collaboration of the public and private sector. Much of ESS will be built by ‘in-kind’ partners all over Europe so its important to understand how we are organized to identify the right customer in the project.