Support and alignment of PXL box with MSC, operation steps

Slides:



Advertisements
Similar presentations
NORTH POWERED AIR-PURIFYING RESPITATOR (PAPR) INSTRUCTIONS FOR USE Preventive Medicine Industrial Hygiene Service.
Advertisements

UVM CricketSat Assembly Manual. Getting Started Make a hard copy print out of the following page It will help you identify the proper components Place.
Assembly Manual Mike Fortney 04/09/2004 CricketSat Receiver.
BARTOSZEK ENGINEERING 1 The Design of the Booster Collimators Larry Bartoszek BARTOSZEK ENGINEERING 3/10/03.
Optical Manufacturing Solutions 1 Probe Assembly.
A-dec 300 Dual Mount on 500 Installation. Agenda ► General Information ► Recommended tools ► Installation ► Follow through install guide ► Hands-on install.
ZIPP 404 BEARING REPLACMENT GUIDE Tools Needed:
Lucas Air Mass Meter Stripdown sequence and technical information.
STAR Detector Main Support System1 Lateral Tracking of the STAR Detector during Translation. November 23, 2005 Ralph L. Brown STAR Operations Group.
Assembly Instructions Additional documents needed for Assembly: GA Drawings on all Units Header Platform GA Drawings Motor Deck Platform GA Drawing Packing.
THE M-9 9MM SERVICE PISTOL
Copyright 2008 Kenneth M. Chipps Ph.D. How to Terminate a Corning Unicam Connector Last Update
MICE Collaboration meeting at RAL 26 th Oct ~ 29 th Oct, 2004 Wrap up on Radiation Shielding Module Design Stephanie Yang 26 th October, 2004.
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
Inside-, Depth-, and Height-Measuring Instruments
Spiral Stairs Assembly Instruction By Laser Dollhouse Designs
Launching the Laser into an Optical Fibre n To launch a laser into an optical fibre, proceed as follows.
14 Ventilation Skill Drills. 2 Objectives (1 of 2) Break glass with a hand tool. Break a window with a ladder. Break windows on upper floors using the.
CHOCOLATE MOLD If there is anything missing from this PowerPoint beyond what is acknowledged, please tell Grant Dunbar. Thanks!!!
EPOCH 1000 Series Procedure Phase Array Straight Beam Calibration
PXL insertion 1.PXL Insertion Steps after PXL installation system is aligned 2.PXL removal steps 3.Some design details 2/3/20131 Table of contents:
CE 260 SURVEYING CHAPTER 5.
Service Seminar Memory Craft Table of Contents MC10001 Top Cover Removal…………………………………………………………………..…………1 Belt Cover Removal……………………………………………………………..……………2-4.
Assembly Manual Mike Fortney 04/02/2006 CricketSat Receiver.
MICE Alignment and Support Structure Tony Jones and Yury Ivanyushenkov Engineering Department RAL.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
General idea of a couple of check rod system and adjustments
HFT PXL Mechanical July 2010 Howard Wieman LBNL 1.
Lab 3 - Centering. Centering; or the smart way to align centered optical elements and systems This lab will make use of concepts used in the previous.
Jigs and Fixtures.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
Quick tutorial Quick tutorial on using labAO and telWFS Work in progress.. JDM 2015June11.
SETTING OUT Horizontal Angles. Ensure instrument is set to measure angles in the appropriate direction. ( refer to operators manual) Unclamp both vertical.
Removing and Replacing the Battery Cover 1. Ensure the phone is turned off. 2. Press the Battery cover locker; lift the battery cover up and away from.
Candela Display Systems 3x2 Interactive Video Wall System.
MARS 2 Design Review-Optomechanical Review 07 Nov 2002 GLW1 MARS 2 Mechanical Design Review.
Brewer Ozone Spectrophotometer Pointing and Levelling C.T. McElroy York University Canada.
Precision Layout Unit 21.
EPOCH 1000 Series Procedure Phased Array Angle Beam Calibration
Clearing Procedures. DISASSEMBLY Major Groups Barrel Group Turn the cover latch and raise the cover group Grasp the retracting slide handle with the.
Field compasses The Brunton compass.
Ventilation Skill Drills.
MC3D V1.1 - Match-Cast 3D Geometry Control Software
Gandhinagar Institute of Technology
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
How to Change Raptor Knife Blades. Step 1: Use a Phillips screwdriver to remove the 5 screws. It is not necessary to remove the lanyard/webbing to change.
Procedure for drawing a free-body diagram - 2-D force systems Imagine the body to be isolated or cut “free” from its constraints and connections, draw.
1) News on the long scale length calibration 2) Results of the two surveys performed on plane 7 Set 1: morning of 12/11/2004 Set 2: morning of 19/11/2004.
VTX Half LAYER 4 LAYER 3 LAYER 1 LAYER 2 EACH LAYER’S BARRELL MOUNT NEEDS TO BE REFERENCED TO KINEMATIC MOUNTS AND IT’S MOUNTED LADDERS.
Topic : Theodolite Traversing
Camera Motion System Requirement Design Details FEA.
In Compass survey chain or tape is used for linear measurements and compass is used for fixing direction. In compass freely suspended.
# 23 SINGLE IMPLANT CASE Osteotomy Progression in Open Guide Sleeve
Shaft Replacement Standard Operating Procedure
What is TETRIX? If you can dream up a robot design, you can build it with the TETRIX Robotics Design System.
STEP 1: ASSEMBLE ANGLE PLATES
Lab 3 - Centering.
Citizens Serving Communities
Annex 4 - Moving Frame and Whiffletree assembly
Easy centering and setting system
Guide Right™ Immediate Placement & Immediate Load
Maxillary Single Implant Case Angular & Linear Correction in 2 Planes
Plan for the installation of the TAMU screen
IR Detector - Test cryostat : Machining
Step-by-step assembly instructions
THEODOLITE TRAVERSING BY S N Nanaware
Meeting In A Box Set Up Guide
Step-by-step assembly instructions
AquaGlo Water Detector Kit For Detecting Water in Jet Fuel
Presentation transcript:

Support and alignment of PXL box with MSC, operation steps During this operation the PXL box rests on two 6 inch aluminum box beams. These beams are supported independent of walking platform Each half of the PXL detector is supported on two round slide rails both in the PXL storage box and in the MSC. In this procedure the box most be accurately moved into position to align the slide rails of the box with the rails in the MSC Up dated, includes measurement tool for checking alignment of two rail systems and instructions 4/23/2017 mechanics/Cave/HFT_wide_angle_hall_top v2.SLDASM

Outline Insertion box support Insertion steps Alignment tool Requirements Design Operation 4/23/2017

This model is incomplete, replace View of East Pole Tip With West Box Support This model is incomplete, replace 4/23/2017

Install the west box beam (assembly weighs 83 lbs) mechanics/west pole tip/WEST_POLETIP_ASM-1_2008.SLDASM remove the BBC Install the west box beam (assembly weighs 83 lbs) The end supports stay permanently bolted to the end cap. Note, there is a support lip for the box beam to ease installation when the beam is bolted into place. 4/23/2017 mechanics/cave/HFT_wide_angle_hall_top v2.SLDASM display: view for BxS

Slide the box into roughly the correct position The box must be maneuvered as shown to clear various obstructions. The box has a base of polyethylene to allow it to slide more easily over the channel beams. Guides on the channel help in this positioning (see next slide) 4/23/2017

The x motion is limited by a stop that contacts the polyethylene base of the PXL box as the box is slid in z toward the interaction region note this part now a box beam The button also provides a limit on the final z motion and the box can then be slid in x to the end of the guide groove for the final rough positioning. 4/23/2017

Fine adjustment system Z adjustment West rail Full 6 degrees of adjustment Adjustment range > ± ½ inch Ys Z Yn Xw Y adjustments X adjustments West rail East rail East rail Xe Y X Z Yn Ys Xw Xe y z x STAR coor. + rotations Jack Screw identifications East North West South Ye 4/23/2017

Fine positioning of the box to align the 20 mm round PXL rails Adjust the x and z position screw assemblies on the west channel beam so that the coupling pin can be inserted Use the two y adjustment screws on either end of jack assembly to raise the box to start the alignment of the PXL rails. This raises the box above the guide buttons so that there is full freedom for the fine adjustment 4/23/2017

Fine positioning of the box to align the 20 mm round PXL rails On the east rail seat the linear bearing pad into the channel. This will require adjusting the x screw and holding the pad in the right orientation and raising the y screw Once properly engaged use the y screw to raise the box off the guide buttons The x and y adjustments can now be used to fine tune the box position 4/23/2017

Alignment Requirements Collinearity The rails in the box must be collinear with the rails in the MSC to allow the carriage to transfer from one set of rails to the other with out binding.   Slider bearing  L  Carriage support rails 4/23/2017

Alignment Requirements End to end alignment The rails must but close enough end to end to allow the slider to pass over the intersection In our case with  = 100 m we have a 200 m tolerance assuming that the separation of the two rails are the same in the two systems. This alignment gets forced by using tapered butt joints The initial alignment has to be good to ~ 3 mm to engage the tapers. Bending the rails by 3 mm will not violate the collinearity condition. Carriage support rails Slider bearing 2 4/23/2017

Alignment measurement system Laser Auto Collimator East (LACE) Laser Auto Collimator West (LACW) Y X Z Yn Ys Xw Xe y z x STAR coor. + rotations Jack Screw identifications East North West South STAR coordinates The above alignment monitor is used to determine the alignment of the two rail systems with respect to each other as the box support screws are adjusted. The system allows sequential independent setting of the 5 degrees freedom, i.e. the two angles of collinearity (x, y), x position, y position and z the angle about the z axis. This is accomplished with an auto collimation laser system plus two video cameras viewing survey targets. These parts are identified in the following slide. The two elements slide on the rails with spring loaded v blocks. The right element, LACW is located on the MSC support rails and the left element, LACE is located on the rails in the PXL transfer/storage box. The v blocks are tapered such that when the rails are aligned roughly by eye the right element can be slid across from the box rails to the MSC rails. 4/23/2017 Laser auto collimation figures from align_figure_instrument.SLDASM

Alignment measurement system, identification of parts cross hair rotation adjuster camera targets video cameras cross hair diode laser laser auto collimator mirror mirror angle adjuster laser pointing angle adjuster The above figure shows the two elements (LACW and LACE) mounted on a single set of rails. This the configuration for aligning the system prior to use. 4/23/2017

Alignment Instructions Outline of steps Zero the laser auto collimator Establish camera target match Adjust box into rough alignment by eye Adjust box into collinear alignment (x, y) with laser auto collimator Adjust box into x,y and z alignment using the laser cross hairs Adjust box into x, y and z alignment using cameras/survey targets Recheck collinearity Engage rails Y X Z Yn Ys Xw Xe y z x STAR coor. + rotations Jack Screw identifications East North West South from align_box_support_fig.SLDASM 4/23/2017

1. Zero the laser auto collimator Install the LACE and LACW on a set of calibration rails – could be the rails in the PXL storage box Separate the two elements by 1 to 1.5 meters To install engage v block on lower rail open spring loaded v block and engage on the upper rail and release rotate safety latch into protect location – this still relies on spring load to engage the rail, but it prevents accidental derailment 4/23/2017

1. Zero the laser auto collimator Adjust laser pointing to center on mirror Adjust laser cross hair rotation and secure with set screw Adjust laser focus center laser image on mirror center cross hairs laser vertical and horizontal angle adjust rotate to focus laser cross hairs set screw to secure cross hair rotation laser cross hair rotation 4/23/2017

1. Zero the laser auto collimator Adjust mirror angle to center reflected laser cross hairs back on the out going laser beam image reflected laser cross hairs defocused image of out going laser on a frosted glass with a hole in the center mirror with adjustable mirror mount adjust mirror to center these two images 4/23/2017

2. Establish Camera target match slide LACE and LACW together and back off to not quite touching connect target illuminators (USB powered LEDs in LACE) Bring up the two videocam views of the two survey targets and manual focus with the viewing software Mark screen with cross hairs centered on the target views The measuring system is now calibrated and aligned ready for use. survey targets 4/23/2017

3. Adjust box into rough alignment by eye Using the jack screws bring the rails of the box into alignment with the MSC rails by sighting down the rails. A level can facilitate this process. Keep the rails separated such that the rail ends do not make contact, but are close enough such that the LACW can slide over the gap. 4. Adjust box into collinear alignment (x, y) with laser auto collimator Slide the LACW from the box rails onto the MSC rails. Move the LACE back 1 to 1.5 meters to where it is convenient view the reflected laser cross hairs and the outgoing laser image on the front of the LACE module. using the jack screws, buck in the y alignment by first moving the box such that the laser is more or less centered on the mirror. Adjust the Ys and Yn jacks so that the laser cross hairs are rotated in z to be vertical/horizontal as viewed with respect to the mirror cross hairs. Then adjust Xe and Xw jack screws to center the vertical elements of the laser cross hair images on each other on the face of LACE as was done during the zeroing step. At this point the centering of the laser on the mirror is not important as long as a reflected image is maintained back at the LACE module. Repeat using Y and (Ys = Yn) to achieve x alignment by overlapping the horizontal elements of the laser cross hair images. Ys and Yn are moved together during this operation to maintain the z alignment. Y X Z Yn Ys Xw Xe y z x STAR coor. + rotations Jack Screw identifications East North West South 4/23/2017

5. Adjust box into x,y and z alignment using the laser cross hairs Tweak z alignment by adjusting Yn and Ys in equal and opposite directions to zero the angle between the laser cross and the mirror center cross hairs on LACW. Align x using the Xe and Xw jack screws together to overlay the vertical laser line with the vertical mark Align y using the Y, Ys and Yn together center laser image on mirror center cross hairs It might turn out that aligning in this manner is good enough to get smooth carriage transfer from one set of rails to the other. But, the next step will improve the alignment accuracy of x,y and z Y X Z Yn Ys Xw Xe y z x STAR coor. + rotations Jack Screw identifications East North West South 4/23/2017

6. Adjust box into x,y and z alignment using cameras/survey targets Move LACE to almost touching LACW and turn on LEDs and cameras Use jack screws as in the previous step to align the camera reference marks to the survey targets without disturbing the collinearity. 7. Recheck collinearity Move LACE back 1 to 1.5 m and recheck collinearity with the laser auto collimator 8. Engage rails Using the Z jack screw butt the rails so that the cone and sockets engage. Use care to avoid excessive force on the MSC rails. Y X Z Yn Ys Xw Xe y z x STAR coor. + rotations Jack Screw identifications East North West South Withdraw the LACW and remove and remove the LACE. The PXL can now be inserted. 4/23/2017