Looking east to Park Street Old tennis court area, looking south.

Slides:



Advertisements
Similar presentations
Chapter 6, Book 2A Places in the park.
Advertisements

I Can Draw A Map.
I Can Draw A Map By Jena Carroll.
Duck Pond Landfill 3100 Blk. of National City Blvd. National City, CA AA-0017 Photo by Anthony TorresPage 1 of 4 September 12, 2012 One of two.
DRAYTON ONTARIO MAPLETON RIDGE SENIORS RESIDENCE.
Path Guide to LT-K Prepared by: SIS Helpdesk, ARRO Created in July 2012 Last updated: 1 st August 2012 Student Information System.
STEFFIAN BRADLEY ARCHITECTS – BRIERLEY HILL PLANNING PRESENTATION.
The Center for Sport and Recreation 5/7 Małachowskiego str. Łódź, Poland.
Snowstorm, roads closed 3 days. Serious snowblowing equipment on site when we arrived Thursday morning.
West Chester University “Geothermal HVAC System Comprehensive Campus Plan – Phase I” September 16, 2008.
Welcome to the CY Middle School virtual tour! Click here for pictures of the main floor. Click here for pictures of the second floor.
Wall N Pond C17 (surface) Outlet 2”Cast Pipe **surface measurements only – see additional graphics for bottom and depth of pond. Height of door is 5’10”.
Slide 1 of 3 Important Notice... On Tue Sept 29 th & Wed Sept 30 th streets in South End of the complex will be done. On Tue Sept 29 th & Wed.
Vineland Commercial Site Address: 7626 N. Vineland Ave. (A.P.N ) 7634 N. Vineland Ave. (A.P.N ) 7630 N. Vineland Ave. (A.P.N )
Measure E Town Hall November 24, 2003 Donna Jones Dulin Gilbane Building Co.
Goals Development Goals for Aspen Falls Presented by Donald Norris, City Engineer.
GRANT JOINT UNION HIGH SCHOOL DISTRICT Planning for the future preserving the past M A S T E R P L A N Conceptual Site Illustrative S O F T B A L L & P.
Mill Creek Town Center A Proposed Mixed Use Development Mokena, Illinois.
© MAKO Surgical Corp CONFIDENTIAL - For limited use only. Not for distribution. 1 Direction to MAKO Surgical MAKO Surgical –Address: 2555 Davie Road,
Presents Project Crimson March 1, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Adams-14 School District Facilities Master Plan Kearney Middle School Focused Site Evaluation SITE DRAINAGE OBSERVATIONS General – Site drainage was primarily.
Slide 1 of 3 Important Notice... On Thu Oct 1 st & Fri Oct 2 nd streets in the East Side of the complex will be done. On Thu Oct 1 st & Fri Oct.
Slide 1 of 3 Important Notice... On Tue Oct 6 th & Wed Oct 7 th streets in the West Side of the complex will be done. On Tue Oct 6 th & Wed Oct.
Balboa Park Pool SAN FRANCISCO ARTS COMMISSION CIVIC DESIGN REVIEW – CONCEPTUAL DESIGN April 11, 2014.
LOS ALAMOS COUNTY JUDICIAL / POLICE – JAIL COMPLEX 60% SUBMITTAL August 8, 2008.
CHS Emergency Evacuation Plan Faculty and Staff Overview.
Southeast lisbon. Southeast Location of Lisbon`s Centennial Block library block along East Main Street.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. August 2007 Prepared by:
Design Development Review
Updated 2011 & New 2012 Landscape Projects Grand Haven.
BUSES & EQUIPMENT TRUCKS Head East on Broad St. SPECTATORS South on SH 360 then U-Turn North to West Parking Entrance Traffic Flow into Complex (Not to.
Lake Mary Prep School University Hall 1097 Sand Pond Road Lake Mary, FL.
All About Maps Beth Clause. How Firefighters Use Maps.
North Augusta High School Design Development Presentation.
Site # Bartlett Site 1.8+/- Acres 900 Woodlands Parkway Vernon Hills, Illinois Office; Fax: Cell:
Aquatic Facility Concept Design. “Every Dog has its Day” Park Valley Pool Pool is 28 years old and nearing the 4-9 years of identified life expectancy.
28 January Changzhou - From Here to There Jiangsu Province.
HALL HIGH SCHOOL NEW SCHOOL PROJECT MARCH 28. Main entrance & cafeteria windows Main entrance.
Your assignment Design a new landscape for the front of our school. Measure from front of building to the street Measure from the sidewalk at the front.
Unit 2 ● Week 3 useful Key Words. Unit 2 ● Week 3 variety Key Words.
Projection, Distortion, Map Quadrants & Sandalwood Map Learning Objectives – Student understands map projection & distortion – Student understands map.
Concept. Example 1 Write an Equation Given the Radius LANDSCAPING The plan for a park puts the center of a circular pond of radius 0.6 mile at 2.5 miles.
COMMUNITY BOARD 4 Landmarks Committee Potential Hell’s Kitchen Landmarks December 6, 2008.
GREENWICH PARK.  Greenwich Park is the oldest of the Royal Parks.
Looking east Above ground spa and wood deck to be removed and lines capped Wood fence to be reconnected Wood fence to be removed Patio cover to.
Duck Pond Landfill 3100 Blk. of National City Blvd. National City, CA AA-0017 Photos by Anthony TorresPage 1 of 3 June 26, 2013 The Volkswagen.
Rebuilding the chimney next to the large group shelter.
165 Partners, LLC. ALR Westgate Development-The Landings Russell County August 30, 2011 DP.
Special Mention: Copley International Conference Center Upper Level Southeast: Inaccessible Element.
UW Medicine Lake Union Phase 2
City of Gresham – Hauton B
Relevant Questions… How did we get to this point? Why do we need this?
SERRA CATHOLIC SCHOOL – SOUTH BUS ROUTE
SE 12th Street Roadway Improvements February 8, 2005.
10 TREK TRAILS North Walk-in-Water Creek North Walk-in-Water Creek
2008 Dirty Dog Run Course St Rt 46 North Main Street
Lesson 10-3: Circles.
北 N north 西 W west 東 E east south南 S.
Humanities and Social Sciences Upper Level Northeast: Accessible Entrance
Check Out This Free New App For Your Smart Phone.
Comprehensive Plan Update Work Session #4b – Land Use
North Augusta High School – Phase 2A and 2B
I-25 Widening - Land Donation at SH 402
I Can Draw A Map.
Mapping the school.
Parts of a Map.
Site and Context. Section from East Section E2 Section E1 Sannidhanam Malikapuram Sannidhanam Malikapuram.
Special Mention: Institute of the Americas Building and Addition Lower Level West: Inaccessible Element.
Presentation transcript:

Looking east to Park Street Old tennis court area, looking south

Southeast corner – site prep for pond overflow pipe

Southeast corner – remove old overflow

Southeast corner – site prep for new pond overflow pipe Old overflow removed and staged to be hauled away

Southeast corner – site prep for new pond overflow pipe

Southeast corner – site prep for pond overflow pipe Site prep for new entrance to the park

Demo of old basketball court – a new basketball court will be relocated in the park