Working Group #10: 911 Prioritization June 6, 2012 Jeanna Green, Network Development 911, Sprint, Co-Chair Thera Bradshaw, CEO, TKC Consulting, Co-Chair.

Slides:



Advertisements
Similar presentations
The U.S. Department of Transportation and the Next Generation Jenny Hansen, Contractor – NG9-1-1 Project Coordinator USDOT/NHTSA.
Advertisements

Working Group 8 – E9-1-1 Best Practices March 22, 2012 Robin Howard Chair WG 8 – E911 Best Practices.
Establishing Research Priorities for Public Health Emergency Preparedness in Canada: Results of a Scoping Review and Priority- Setting Meeting Yasmin Khan,
Working Group #1: NG9-1-1 September 23, 2011 Laurie Flaherty, Co-Chair Brian Fontes, Co-Chair Patrick Donovan, FCC Liaison.
NANC Report Future of Numbering (FoN) Working Group FoN Tri-Chairs Suzanne Addington, Sprint Kathy Bakke, Wisconsin PSC Mark Lancaster, AT&T September.
Federal Communications Commission Public Safety and Homeland Security Bureau Public Safety Communications Update “View from the FCC” David G. Simpson,
ESW 7 - FCC Jeff Cohen Senior Legal Counsel Public Safety Bureau FCC Interests & Policy Around Geolocation.
Geo-targeted Weather Alerts Coming to Millions of Mobile Devices Michael Gerber and David Green NOAA/National Weather Service Silver Spring, MD Michael.
Working Group # Prioritization March, 2013 Jeanna Green, Network Development 911, Sprint, Co-Chair Thera Bradshaw, CEO, TKC Consulting, Co-Chair.
Working Group 2: Next Generation Alerting December 16, 2011 Co-Chairs: Damon Penn, Asst. Administrator, Nat’l Continuity Programs, DHS-FEMA Scott Tollefsen,
Working Group 2: Next Generation Alerting September 23, 2011 Co-Chairs: Damon Penn, Asst. Administrator, National Continuity Programs, DHS-FEMA Scott Tollefsen,
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Brian K. Daly, Director, Core Standards AT&T ATIS’ ICT Accessibility Activity Document No: GSC16-PLEN-67r1.
Working Group #3 E9-1-1 Location Accuracy December 16, 2011 Craig Frost, Verizon Wireless, Co-Chair Stephen J. Wisely, APCO International, Co-Chair.
Working Group 2: Next Generation Alerting March 6, 2013 Co-Chairs: Damon Penn, Assistant Administrator, National Continuity Programs, DHS-FEMA Scott Tollefsen,
Working Group 2: Next Generation Alerting September 12, 2012 Co-Chairs: Damon Penn, Assistant Administrator, National Continuity Programs, DHS-FEMA Scott.
NENA Development Conference | October 2014 | Orlando, Florida Emergency Notification for People with Disabilities Donna Platt, Accessibility Committee.
Steering Committee CSRIC Working Group 2A Cyber Security Best Practices October 7, 2010.
Federal Communications Commission Communications Security, Reliability and Interoperability Council Working Group 6 – Best Practice Implementation Stacy.
Network Reliability Steering Committee (NRSC) Overview and NRSC CAMA Trunk Throughput Optimization Analysis Stacy Hartman – CenturyLink Robin Howard.
WORKING GROUP 4A BEST PRACTICES FOR RELIABLE AND E9-1-1 FINAL REPORT CRAIG W. DONALDSON, SENIOR VICE PRESIDENT REGULATORY AND GOVERNMENT AFFAIRS,
1 Denis Gusty Alerts and Warnings Program Manager First Responders Group Science and Technology Directorate U.S. Department of Homeland Security June 28,
GOMC Organizational Assessment Progress to Date Joan LeBlanc GOMC Council Coordinator.
1 7th SDO Emergency Services Workshop (ESW7) May 2010 ATIS Emergency Communications Status Update Presented by: Peter Musgrove ATIS WTSC G3GSN Chair
Working Group #10: 911 Prioritization September, 2012 Jeanna Green, Network Development 911, Sprint, Co-Chair Thera Bradshaw, CEO, TKC Consulting, Co-Chair.
Steering Committee Working Group 6 Best Practice Implementation October 7, 2010 Stacy Hartman Steve Malphrus Co-Chairs.
Working Group #9 CAP Implementation June 6, 2012 Co-Chair Chris Homer Co-Chair Ed Czarnecki.
December 6, 2002 M. Roden / D. Dautel FOCUS GROUP 1C Public Safety Report to NRIC VI Council December 6, 2002 Co-Chairs Mike Roden - Cingular Wireless.
Working Group 2: Next Generation Alerting March 22, 2012 Co-Chairs: Damon Penn, Asst. Administrator, Nat’l Continuity Programs, DHS-FEMA Scott Tollefsen,
Working Group 8 – E9-1-1 Best Practices March 6, 2013 Robin Howard Chair WG 8 – E9-1-1 Best Practices.
NANC Report Future of Numbering (FoN) Working Group FoN Tri-Chairs Carolee Hall, Idaho PUC Dawn Lawrence, XO Communications Suzanne Addington, Sprint June.
1 NASTD 34 TH ANNUAL CONFERENCE James Arden Barnett Jr., Rear Admiral (Ret.) Chief, Public Safety and Homeland Security Bureau Federal Communications Commission.
1 ESIF Task Force 34 Overview/Status* February, 2006 Mike Fargano, Co-Chair Christian Militeau, Co-Chair
WG #3 E9-1-1 Location Accuracy September 23, 2011 Craig Frost, Verizon Wireless, Co-Chair Stephen J. Wisely, APCO International, Co-Chair.
ATIS Critical Communications Activities since GSC-18
Fees and Services John Curran President and CEO. Situation Fee Structure Review Panel completed and discharged – Final Fee Structure Review Report released.
Working Group 1: NG9-1-1 December 16, 2011 Laurie Flaherty Brian Fontes WG 1 Co-Chairs.
1 Public Safety and Homeland Security Bureau Report: Presentation to the Commission January 15, 2009.
ATOCA IETF 79, Beijing Martin Thomson; Scott Bradner.
Communications Technology Group (CTG) Status Report to the Commercial Mobile Service Alert Advisory Committee March 12, 2007 Brian K. Daly, CTG Leader.
Welcome to the NENA Development Conference. Thank You to Our Sponsors!
Work Group 4C Steering Committee Technical Options for E9-1-1 LOCATION ACCURACY October 7, 2010.
Working Group 8 – E9-1-1 Best Practices June 6, 2012 Robin Howard Chair WG 8 – E9-1-1 Best Practices.
Fostering worldwide interoperability Emergency Communications TIA DEL DOCUMENT #:GSC14-PLEN-007 TIA Emergency Communications FOR:Presentation GSC-14 SOURCE:TIA.
Working Group 8 – E9-1-1 Best Practices September 23, 2011 Robin Howard Chair WG 8 – E911 Best Practices.
Working Group 4B: Network Timing Single Source Risk Reduction Status Update September 21, 2015 Jennifer A. Manner, Chair.
Working Group 4A: Submarine Cable Resiliency Status Update
Working Group 1: Evolving 911 Services Status Update September 21, 2015 Jeff Cohen, Co-Chair (APCO International) Susan Sherwood, Co-Chair (Verizon)
Network Reliability and Interoperability Council VII NRIC Council Meeting Focus Group 1B Network Architectures for Emergency Communications in 2010 September.
Working Group 1: Evolving 911 Services Status Update December 3, 2015 Jeff Cohen, Co-Chair (APCO International) Susan Sherwood, Co-Chair (Verizon)
Working Group 4B: Network Timing Single Source Risk Reduction Status Update December 3, 2015 Jennifer A. Manner, Chair.
Working Group 3: Emergency Alert Systems Status Update September 21, 2015 Steve Johnson, Co-Chair National Cable & Telecommunications Association Kelly.
Working Group 8 – E9-1-1 Best Practices December 16, 2011 Robin Howard Chair WG 8 – E911 Best Practices.
NANC Report Future of Numbering (FoN) Working Group FoN Tri-Chairs Carolee Hall, Idaho PUC Dawn Lawrence, XO Communications Suzanne Addington, Sprint December.
NANC Report Future of Numbering (FoN) Working Group FoN Tri-Chairs Carolee Hall, Idaho PUC Dawn Lawrence, XO Communications Suzanne Addington, Sprint Sept.
2 Gordon Barber March 14, 2003 Focus Group Committee Chairs F Cable: John Thrower (Cox Communications) F CLECs: Robert Smith (McLeod USA) F Equipment.
Working Group 7: Cybersecurity Workforce Status Update September 21, 2015 Bill Boni, Co-Chair T-Mobile Drew Morin, Co-Chair TeleCommunication Systems FCC.
Working Group #10: 911 Prioritization March, 2012 Jeanna Green, Network Development 911, Sprint, Co-Chair Thera Bradshaw, CEO, TKC Consulting, Co-Chair.
Working Group 2: Emergency Alerting Platforms Status Update September 21, 2015 Farrokh Khatibi, Co-Chair (Qualcomm) Francisco Sánchez, Jr., Co-Chair (Harris.
Emergency Management Training Center Title of Presentation Committee or Workgroup Presenter name.
Working Group 8: Priority Services CSRIC V Meeting March 16, 2016 Thomas Anderson, Co-Chair (Cisco) Bill Reidway, Co-Chair (Neustar)
Working Group 1: Evolving 911 Services Status Update March 16, 2016 Jeff Cohen, Co-Chair (APCO International) Susan Sherwood, Co-Chair (Verizon)
National Emergency Communications Plan Update National Association of Regulatory Utility Commissioners Winter Committee Meeting February 16, 2015 Ron Hewitt.
CGMS-43-NOAA-WP-04 Coordination Group for Meteorological Satellites - CGMS Status report of the CGMS Socioeconomic Benefits Tiger Team (SETT) Presented.
October 4-7, 2004 Los Angeles, CA E9-1-1 In a VoIP World Timothy Lorello SVP, Chief Marketing Officer TeleCommunication Systems (TCS) (410)
May 6, 2015 Dusty Rhoads Office of Emergency Communications Office of Emergency Communications (OEC)
Jeju, 13 – 16 May 2013Standards for Shared ICT ATIS Emergency Communications (EC) Standards Development Dr. Farrokh Khatibi Director of Engineering Qualcomm.
Working Group 1: Evolving 911 Services Status Update June 22, 2016 Jeff Cohen, Co-Chair (APCO International) Susan Sherwood, Co-Chair (Verizon)
NANC Report Future of Numbering (FoN) Working Group FoN Tri-Chairs Carolee Hall, Idaho PUC Dawn Lawrence, XO Communications Suzanne Addington, Sprint June.
NANC Report Future of Numbering (FoN) Working Group
ATIS Emergency Communications (EC) Standards Development
Presentation transcript:

Working Group #10: 911 Prioritization June 6, 2012 Jeanna Green, Network Development 911, Sprint, Co-Chair Thera Bradshaw, CEO, TKC Consulting, Co-Chair

2 Working Group #10: 911 Prioritization  Description:  The working group shall explore ways to ensure the is available when emergencies or disasters cause a surge in mobile network use.  The work will include considerations of how traffic might be prioritized in such situations.  It also includes related operational issues, including ways for PSAPs to address operational issues.  The working group may consider ways to reduce traffic load during emergencies.  such as encouragement of use of 911 text as a lower throughput alternative to 911 voice.

3 Working Group #10: 911 Prioritization  Description Continued:  If the WG pursues arrangements that give 911 calls higher priority than most consumer wireless calls:  the WG may consider how to coordinate 911 priority with other priority calling arrangements, including Wireless Priority Service (WPS), and other arrangements that may provide priority for calls for emergency and first responders.  The WG will address implementations in 4G and earlier generation wireless networks; and will consider both E911 and NG911 implementations

Working Group #10 – Participants  Working Group #10 Members and Organization Charles Cullen, Palo Alto 911 Communication Center Chris Fisher, APCO William Hinkle, Intrado Carl Klein, CenturyLink Joseph Marx, AT&T Ron Mathis, Intrado Peter Musgrove, ATIS Lawrence Rybar, Verizon Jack Shurtz, Cricket Communications Ray Singh, Applied Communication Sciences ( formerly Telcordia Technologies ) Jim Winegarden, CenturyLink 4

Working Group #10 - Objectives  High level bulleted summary of completed activities  Objectives  Technologically feasible:  Today  Determine different types of emergency & disaster calls and should/could they be prioritized  Impacts of LTE, NG911  Existing Priority Services  WPS, GETS, CMAS  Reliability & Resiliency  Various points in call path (capacity/congestion occurs) within the call flow including: CMRS/VoIP Providers, LEC/CLEC, and  PSAP  Consumer education usage 5

Working Group #10 - Current Work Activity  WG has held 6 conference calls  Various members have presented contribution for discussion on the following topics  PSAP Observations  Constraints today  Opportunities for tomorrow  # of PSAPs and % of Call Taker positions categorized by small, medium, larger PSAPs  Network Diagram  Wireline call flows and congestion points  Wireless call flow (including wireline) and congestion points  Priority Services Utilized today  Integrated Public Alert and Warning System (IPAWS)  Commercial Mobile Alert Service (CMAS)  for Non-emergency Governmental use 6

Working Group #10 - Next Steps  Provide a high level bulleted summary of the next steps,  Continue our Bi-weekly conference calls  Continue to work thru open Action Item list  Review Contribution on: GETS, WPS,  Start to draft report 7

Working Group # - Project Timeline  Include a project timeline that highlights pertinent dates (e.g., due dates, meetings, etc.)  Completed Draft Review by WG #10: 01/15/2013  Report to Steering Committee: 02/06/2013  Final report to CSRIC members: 02/20/2013  Vote by full CSRIC: 03/06/2013 8