Doc.: IEEE 802.11-07/0270r2 Submission March 2007 Matthew Gast, Dave StephensonSlide 1 Emergency Call Setup Procedure Notice: This document has been prepared.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0032r1 Submission January 2007 Donghee Shim et al, LG Electronics, Inc.Slide 1 Comments resolutions: Emergency call support in 11u.
Advertisements

Doc.: IEEE /0508r0 Submission May 2007 Matthew Gast, Trapeze NetworksSlide 1 EAP Method Requirements for Emergency Services Notice: This document.
Doc.: IEEE /0256r0 Submission February 2007 A. Centonza, D. StephensonSlide 1 Limitations on the Use of EBR Notice: This document has been prepared.
Doc.: IEEE /0270r0 Submission March 2007 Matthew Gast, Dave StephensonSlide 1 Emergency Call Setup Procedure Notice: This document has been prepared.
Doc.: IEEE /2032r0 Submission July 2007 Stephen McCann, Nokia Siemens NetworksSlide 1 IEEE 802 ES Ad Hoc Notice: This document has been prepared.
Doc.: IEEE /0930r0 Submission July 2006 Nancy Cam-Winget, Cisco Slide 1 Editor Updates since Jacksonville Notice: This document has been prepared.
Doc.: IEEE /1867r1 Submission November r Security TeamSlide 1 TGr Security Requirements Notice: This document has been prepared to.
Doc.: IEEE /1138r0 Submission November 2005 Cheng Hong, PanasonicSlide 1 Authorization Information in interworking Notice: This document has been.
Doc.: IEEE /2237r0 Submission July 2007 Emily Qi, Intel CorporationSlide 1 TGv Redline D1.0 Insert and Deletion Notice: This document has been.
Doc.: IEEE /0593r2 Submission May 2007 Stephen McCann, NSN Roke ManorSlide 1 TGu Agenda Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /0448r0 Submission March, 2007 Srinivas SreemanthulaSlide 1 Joiint TGU : Emergency Identifiers Notice: This document has been.
Doc.: IEEE /1212r0 Submission TGT and MEF Liaison Notice: This document has been prepared to assist IEEE It is offered as a basis for.
Doc.: IEEE /86r2 Submission March, 2010 Gabor BajkoSlide 1 Location Proxy Notice: This document has been prepared to assist IEEE It is.
Doc.: IEEE /0028r0 Submission January 2005 Eleanor Hepworth, Siemens Roke ManorSlide 1 Definitions and Terminology Notice: This document has been.
Doc.: IEEE /0197r0 Submission March 2005 Nancy Cam-Winget et alSlide 1 TAP & JIT Merge Process Notice: This document has been prepared to assist.
Doc.: IEEE /0136r0 Submission January 2007 Dave Stephenson, Cisco Systems, Inc.Slide 1 Input to Information Model Date: Notice:
Doc.: IEEE /1006r0 Submission September 2005 Andrew McDonald, Siemens Roke ManorSlide 1 Initial Network Selection Concept Notice: This document.
Doc.: IEEE /0215r1 Submission January 2006 Jesse Walker, Intel CorporationSlide 1 TGw Closing Report Notice: This document has been prepared to.
Doc.: IEEE /2112r1 Submission Peter Loc, MarvellSlide 1 TGn LB97 Frame Format Ad Hoc San Francisco, July 2007 Notice: This document.
Doc.: IEEE /0652r1 Submission May 2007 Emily Qi, Intel CorporationSlide 1 TGv Redline D0.12 Insert and Deletion Notice: This document has been.
[ Interim Meetings 2006] Date: Authors: July 2005
London TGu Motions Authors: January 2007 Date: Month Year
LB73 Noise and Location Categories
LB73 Noise and Location Categories
ES Access Date: Authors: May, 2008 November 2005
Emergency Call Setup Procedure
Waveform Generator Source Code
TGu Closing Report Date: Authors: November 2005
TGp Closing Report Date: Authors: July 2007 Month Year
Attendance and Documentation for the March 2007 Plenary
3GPP Extended Date: Authors: July 2005 July 2005
3GPP liaison report May 2006 May 2006 Date: Authors:
Motion to accept Draft p 2.0
Protected SSIDs Date: Authors: March 2005 March 2005
3GPP liaison report July 2006
[place presentation subject title text here]
TGu Closing Report Date: Authors: May 2006 May 2006
JTC1 Chair’s Closing Report
On Coexistence Mechanisms
TGu-changes-from-d0-02-to-d0-03
TGp Closing Report Date: Authors: May 2007 Month Year
TGu Pre-Proposal Presentations
TGu Closing Report Date: Authors: July 2006 July 2006
On Coexistence Mechanisms
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGu Closing Report Date: Authors: September 2005
ADS Study Group Mid-week Report
TGu Closing Report Date: Authors: March 2006 March 2006
IEEE P Wireless RANs Date:
TGu-changes-from-d0-01-to-d0-02
LB73 Noise and Location Categories
TGy draft 2.0 with changebars from draft 1.0
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Redline of draft P802.11w D2.2 Date: Authors:
802.11u Bootstrap Procedure with
TGu-changes-from-d0-02-to-d0-03
3GPP2 Liaison Report Date: Authors: May 2006 May 2006
TGu Closing Report Date: Authors: March 2007 March 2007
TGu Closing Report Date: Authors: January 2006 January 2006
EC Motions – July 2005 Plenary
TGu-changes-from-d0-04-to-d0-05
Location Capability Negotiation
EAP Method Requirements for Emergency Services
Transition Nowhere Date: Authors: Sept 2005 Sept 2005
TGu-changes-from-d0-03-to-d0-04
TGu Timeline Date: Authors: January 2005 January 2005
TGu Motions Date: Authors: May 2006 May 2006
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
WNG SC Closing Report Date: Authors: July 2006 July 2006
Presentation transcript:

doc.: IEEE /0270r2 Submission March 2007 Matthew Gast, Dave StephensonSlide 1 Emergency Call Setup Procedure Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at. ieee802.org/guides/bylaws/sb-bylaws.pdf Date: Authors:

doc.: IEEE /0270r2 Submission March 2007 Matthew Gast, Dave StephensonSlide 2 Abstract Frame exchange diagram for Emergency Call Setup process of an u-capable STA. This is an informative presentation summarizing some of the work which has produced other normative text for inclusion within the IEEE u draft. Diagrams developed at February 2007 TGu/ Ad Hoc Meeting (San Jose, California, USA)

doc.: IEEE /0270r2 Submission March 2007 Matthew Gast, Dave StephensonSlide 3 AP (11u-capable) STA (11u-capable) Carrier Network VLAN #5 Note: There does NOT need to be a 1-to-1 mapping between this and SSID #5. Architecture IEEE Information Server AAA DHCP SSID #5

doc.: IEEE /0270r2 Submission March 2007 Matthew Gast, Dave StephensonSlide 4 AP (11u-capable) STA (11u-capable) Configured by Hotspot owner / administrator Beacon (ESN) Association request (SSID : Foo) Association Response (…) EAP Success (include PMK) delay Emergency Call : ESR Case EAPOL/EAP-Response/Identity (e.g. EAPOL/EAP-Request/Identity 4-Way Handshake

doc.: IEEE /0270r2 Submission March 2007 Matthew Gast, Dave StephensonSlide 5 AP (11u-capable) STA (11u-capable) Beacon (SSID: Foo, ESO bit) Association request (SSID : Foo) Association Response (…) Emergency Call : ESO Case

doc.: IEEE /0270r2 Submission March 2007 Matthew Gast, Dave StephensonSlide 6 Event Flow Step 1: Get on network –Crypto (EAPOL required) vs clear –ESO (anonymous) vs ESN (public credentials) Step 2: Get location –Currently liaising with 11v about location provision for Emergency calls. –Which format (geospatial/civic)? See RFC 3619 (privacy protection issues) Step 3: Place call –Authentication again, at app layer –Network design impact: restrict calls to emergency dispatch only –Establish media stream

doc.: IEEE /0270r2 Submission March 2007 Matthew Gast, Dave StephensonSlide 7 Emergency Call with IS

doc.: IEEE /0270r2 Submission March 2007 Matthew Gast, Dave StephensonSlide 8 Questions and notes NAI or ESR (Emergency Service Realm) Well known format, assigned by hotspot administrator or by AAA configuration (AP MIB?) –e.g sos.dot11.org Need ESR text. Update to Annex P? –ESR is used to route authentication request to the right AAA server, but ESR will be replaced with NAI How do we ‘officially’ change this? –msg’s – ESR -> ESN –objects – restricted / colorful? EAP primitive (EAP native) messages can possibly be used –a new EAP method that would be a "null" authentication but enable derivation of a PMK –transmitting the PMK in an EAP message –standardizing a pre-shared PMK for all emergency calls.

doc.: IEEE /0270r2 Submission March 2007 Matthew Gast, Dave StephensonSlide 9 Additional Notes 1 Beacon Management Frames –AP’s BSSID –SSID – Foo –ESSID (or WIID) –Interworking Capability IE (ESO) –GAS Capability IE

doc.: IEEE /0270r2 Submission March 2007 Matthew Gast, Dave StephensonSlide 10 Layer Parameters L2 ACLs: SA, DA, ET, Pri, ULAN ID L3 ACLs: SA, DA, DSCP, SP, DP, IPP

doc.: IEEE /0270r2 Submission March 2007 Matthew Gast, Dave StephensonSlide 11 AP QoS Parameters Use T/FMax Rate AC - VOT~160 kbps VIF BET~100 kbps BKF