The Standards Development Process IEEE Gary Hoffman April 13, 2015.

Slides:



Advertisements
Similar presentations
Overview of the IEEE Process. Overview of Process l Project Approval l Develop Draft Standards l Ballot Draft l IEEE-SA Standards Board Approval l Publish.
Advertisements

Overview of the IEEE Process IEEE P1620 Working Group Meeting 18 September 2002.
Balloting/Handling Negative Votes. General Overview of Different Levels of Balloting Subcommittee New Standards Major Revisions Provisional Standards.
IEEE P1850 IEEE-SA Sponsor Ballot Primer 5 April 2005 Presented by Andy Ickowicz & Noelle Humenick IEEE Standards Activities.
Overview of the IEEE-SA Process Maintenance of IEEE standards Soo H. Kim, Program Manager, Technical Program Development NPEC Subcommittee SC-3 Jan 24,
Overview of the IEEE-SA Process
Submission doc.: IEEE IEEE q - Conditional Approval to Start Sponsor Ballot Slide 1Bob Heile, Wi-SUN Alliance June 2015.
Submitting Your IEEE Standards Project for Approval Consideration RevCom Presentation PE/IC Meeting 9 November 2009 Prepared by Moira Patterson.
IEEE-SA myBallot TM myBallot ™ IEEE Standards Association New Electronic Balloting System Sponsor Tools.
Session # Maintenance Task Group Closing Plenary Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE maint-11/0015r1.
Doc.: IEEE /0765r0 Submission July 2005 Jesse Walker (Intel Corporation) Slide 1 Motion Move To form an IEEE Study Group to receive WLAN.
IEEE-SA Public Review IEEE/PES PE/SPDC Committee San Diego, CA May 2015.
Doc.: IEEE /1084r00 Submission September 2015 Adrian Stephens, Intel CorporationSlide WG Chair comments to TGah Date: Authors:
Doc.: IEEE b TG4b September 2005 Robert Poor - NBT GRoupSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
IEEE Std revision P802.3REV includes merge of: –IEEE Std (minus Link Aggregation) –Approved amendments 802.3an, 802.3aq, 802.3as.
Overview of the IEEE Process. Overview of Process l Project Approval l Develop Draft Standards l Ballot Draft l IEEE-SA Standards Board Approval l Publish.
Session # Maintenance Task Group Closing Plenary Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE maint-09/0009.
Title: LE TG Closing Report for Session #64 Document Number: h-09/0029 Date Submitted: Nov. 19, 2009 Source: Chair of LE TG: Mariana GoldhamerVoice:+972.
Doc.: IEEE /0828r0 Submission May 2007 Harry Worstell, AT&TSlide 1 Procedural Clarification Notice: This document has been prepared to assist.
1 IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: , Session #20, Montreal Closing Plenary Date Submitted: May, 2007 Presented.
Doc.: IEEE /xxxxr0 Submission July 2007 Terry Cole, AMDSlide Common Editorial Comment Resolution Process Date: Authors:
Doc.: IEEE Submission November 2007 Robert F. Heile, ZigBee AllianceSlide EC actions/agenda items for Friday, November 16, 2007.
1 IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: , Session #26, Jacksonville Closing Plenary Date Submitted: Jan, 2008 Presented.
The IEEE-SA Standards Process Dr. Bilel Jamoussi IEEE Standards Education Committee.
Doc.: IEEE /1218r0 SubmissionBruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company Address Phone.
Doc.: IEEE /0163r0 Submission Jan 2013 Hiroshi Mano (ATRD Root Lab)Slide 1 IEEE TGai Closing Report Date: Authors: NameCompanyAddressPhone .
P SystemC Analog/Mixed-Signal (AMS) extensions Working Group July 6, 2015 | Martin Barnasconi | P Chair.
Doc.: IEEE /0382r0 Submission IEEE TGai Closing Report Date: Authors: NameCompanyAddressPhone Hiroshi MANOAlliedtelesis R&D.
IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: LB #1e Comment Summary Date Submitted: July, 2007 Presented at.
IEEE PCIC Standards Working Group Officers’ Workshop IEEE-SA Public Review Overview for Sponsor Chairs, Working Group Chairs and Ballot Designees Pat Roder.
Proposed P802.16s Amendment Extension Request to RevCom
Relevant Rules on Recirculation
Sponsor Ballot Process
Proposed P802.16s Amendment Extension Request to RevCom
IEEE 1914 NGFI IEEE RoE TF Opening Report
myProject Redesign: Status & Preview
IEEE-SA: MyProject Training
The Standards Development Process
P802.11n report to EC on request for approval to proceed to RevCom
P802.11n report to EC on request for approval to proceed to RevCom
IEEE Standards NesCom Overview 2010
July Motions EC Meeting July 29, 2016 Manchester Grand Hyatt San Diego, CA, USA Bob Heile, Wi-SUN Alliance.
P802.11z conditional approval report to ExCom
P802.11z conditional approval report to ExCom
Procedural review of initial WG ballot on P802.1CF
IEC Maintenance Committee Report
Introduction to Sponsor Balloting using the myBallot™ system
Executive Committee Meeting
Training Presentation Karen Evangelista RevCom Administrator
July Motions EC Meeting July 29, 2016 Manchester Grand Hyatt San Diego, CA, USA Bob Heile, Wi-SUN Alliance.
802.16m Opening (Final) Report
IEEE P1666 SystemC Standardization Working Group Status and Plans
Closing IEEE 802 EC Friday 15th March 2019
Sponsor Ballot Comment Resolution
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [A Brief Overview of Draft Approval.
Closing IEEE 802 EC Friday 15th March 2019
Closing IEEE 802 EC Friday 15th March 2019
P Draft to Sponsor Ballot
IEEE MEDIA INDEPENDENT HANDOVER
July Motions EC Meeting July 29, 2016 Manchester Grand Hyatt San Diego, CA, USA Bob Heile, Wi-SUN Alliance.
Overview of WG Letter Ballot Process
IEEE MEDIA INDEPENDENT HANDOVER DCN:
TGn Editor Report Sept 2008 Date: Authors:
IEEE P Motions at the July Plenary EC Meeting
IEEE MEDIA INDEPENDENT HANDOVER
P802.11aq Waiver Request Introduction
P b to RevCom: Conditional Approval Request
IEEE P Wireless Personal Area Network
IEEE P Motions at the July Plenary EC Meeting
Title: LE TG Agenda for Session #63
Presentation transcript:

The Standards Development Process IEEE Gary Hoffman April 13, 2015

Fun Facts  What IEEE Technical Society has the most IEEE Standards? A. Computer Society B. Power & Energy Society C. Communications Society  Of all IEEE Standards how many are from the Transformers Committee? A. 60% B. 50% C. 40%  Who is responsible for the rules of IEEE standards development? A. PES B. IEEE-SA C. Both PES and IEEE-SA  What standards processes do we offer? A. Entity B. Individual C. Both 2 60% √ or 24% of all IEEE Standards √ √

Beginning the process  Submit a PAR application  Get approval from the Transformer Committee Standards Coordinator allows entry to the Agenda for the next NesCom meeting  45 days prior to the meeting the questions from NesCom members begins  If all questions from NesCom members are satisfactorily answered, NesCom recommends approval to IEEE-SA Standards Board otherwise there is a recommendation to defer or disapprove. The PAR is on the consent agenda unless there is an objection from a Board member.  If SASB members approve, the Working Group is authorized to conduct business for the “life” of the PAR 3

The cornerstones of the IEEE standards development process  Openness  Fairness  Consensus  Balance: No interest group can represent a majority in the Individual process 4

Steps towards completing the Draft  Develop the Standard, Guide, or Recommended Practice  Straw ballots are always a good idea to achieve consensus  Two thirds of the attending members approve the WG to go to ballot  Form the ballot group, Open for 30 days or until Balance is achieved  Submit draft to IEEE-SA Editorial for Mandatory Editorial Coordination (MEC) Review  Once ballot group is formed and MEC review completed the ballot can open for a minimum of 30 days  Balloting may be extended if the response rate does not achieve 75% of the ballot group members 5

The initial ballot  Once ballot group is formed and MEC review completed the ballot can open for a minimum of 30 days  Balloting may be extended if the response rate does not achieve 75% of the ballot group members  If 75% approval is not achieved, the ballot fails and all comments require resolution and the draft is open for another round of balloting  Public review starts June 2015 and is open for 60 days  Once the Sponsor ballot closes, the WG Officers decide how comments are handled: –Ballot resolution group –Bring the comments to the WG  Key: All rejected or revised Approved or Disapprove comments require a rational for rejection or revision with focus on Disapprove comments 6

The recirculation ballot  Recirculation ballots open for a minimum of 10 days  Only changed sections of the draft are open for comment. Comments made on non-changed portions may be ruled out of scope  The ballot group has an opportunity to weigh in on changed portions  Recirculations continue until all Must Be Satisfied comments are resolved or there are no substantive changes made to the draft. 7

Steps to publication  Project is submitted to the next RevCom agenda  45 days prior to the meeting RevCom reviews and makes comments  If the rules are followed, RevCom may recommend approval to SASB for addition to the consent agenda  If no one removes the Project from the consent agenda the Project is approved by SASB for publication 8

Do’s and don'ts as a participant  If you have a material interest, get involved  Volunteer, it is the best way to learn  Make yourself available to participate in meetings  Do not add confidentiality statements or assert copyrights in s regarding WG matters  Observe the IEEE copyrights 9

Become an IEEE-SA Member 10