Update on APV25-SRS Electronics Kondo Gnanvo. Outline Various SRS Electronics Status of the APV25-SRS UVa Test of the SRU with multiple.

Slides:



Advertisements
Similar presentations
SRS Readout electronics
Advertisements

Kondo GNANVO Florida Institute of Technology, Melbourne FL.
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE meeting at LBNL 10.Feb.2005 DAQ system for KEK test beam Hardware Software Processes Architecture SciFi.
GEM Detectors for AnDY Nilanga Liyanage University of Virginia 1 Outline GEM chamber concept Large area GEM chamber projects Proposed GEM configuration.
Update on SBS Back Tracker UVa K. Gnanvo, N. Liyanage, V Nelyubin, K. Saenboonruang, Seth Saher Cross Talk issues with APV25 Electronics Uniformity.
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE Tracker KEK Mar. 30, 2005.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Detector DAQ Test bench in Geneva o Preparing for Test Beam o FE electronics tests o Detector.
Miniweek WG5 June 2015 Hans Muller CERN/RD51
Nilanga Liyanage University of Virginia UVa GEM Team Dr. Kondo Gnanvo, Dr. Vladimir Nelyubin, Kiadtisak Saenboonruang, Chao Gu, Xinzhan Bai, Jie Liu, Seth.
New Features of APV-SRS-LabVIEW Data Acquisition Program Eraldo Oliveri on behalf of Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer] NYC,
July test beam DAQ status Marcin Byszewski Konstantinos Ntekas.
SRS-DTC Links WG5 RD51 Miniweek Alfonso Tarazona Martínez, CERN PH-AID-DT.
GEM Electronic System Status New releases of electronic boards: ◦ MPD v 4.0 ◦ Backplane 5 slot short (for UVa design) ◦ APV Front-End with Panasonic connector.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
Huazhong Normal University (CCNU) Dong Wang.  Introduction to the Scalable Readout System  MRPC Readout Specification  Application of the SRS to CMB-MRPC.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2013 – Feb – 20 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
Experience with medium-size SRS for muon tomography Michael Staib Florida Institute of Technology.
1 20/02/12 SRS News SRU Revision, New Hybrids, DTC, Firmware, … Sorin Martoiu, CERN PH/DT SRS News, Sorin Martoiu, CERN 2012, 9th RD51 Collaboratin Meeting.
SRS electronics 2012 overview
SRS Readout System for VMM2 Sorin Martoiu, IFIN-HH (RO)
Updates on GEMs characterization with APV electronics K. Gnanvo, N. Liyanage, K. Saenboonruang.
SALTRO TPC readout system Presented by Ulf Mjörnmark Lund University 1.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
SRS Readout architectures Hans Muller, CERN PH
Strip No Detection and Imaging of High-Z Materials with a Muon Tomography Station using GEM Detectors K. Gnanvo 1, W. Bittner 1, B. Benson 1, F. Costa.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
Statement of Interest in CMS MPGD High-  Muon Upgrade Florida Tech CMS Muon Group Marcus Hohlmann Florida Institute of Technology, Melbourne, FL, USA.
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
GEM Trackers for Super BigBite Spectrometer (SBS) in Hall JLab The Super Big Bite Spectrometer (SBS) is one of the major new equipment in hall A in.
News on GEM Readout with the SRS, DATE & AMORE
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
APV25 Electronics for GEMs at UVa and for the 12 GeV Upgrade Program in HallA at JLab RD51 Electronic School, February 3-5, 2014 Kondo Gnanvo University.
GEM Detector R&D at Florida Tech – “Get to know each other” –
SRS Activities at IFIN-HH: VMM2 Hybrid, FECv6 Firmware, High- Density Optical ATCA-SRS Mezzanine Sorin Martoiu, Michele Renda, Paul Vartolomei (IFIN-HH.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
Calibration of the gain and measurement of the noise for the apv25 electronics K. Gnanvo, N. Liyanage, C.Gu, K. Saenboonruang From INFN Italy: E. Cisbani,
Florida Institute of Technology, Melbourne, FL
Report on WP13 Sub Task and “Tools to facilitate detector development” 1.Interfacing FE-chips specific to gas detectors to the Scalable Read-out.
Large-Area GEM Detector Development at CMS, RD51, and Fl. Tech – A brief overview – Marcus Hohlmann Florida Institute of Technology, Melbourne, FL PHENIX.
SRS Trigger Processor Option Status and Plans Sorin Martoiu (IFIN-HH)
Data transfer performance of SRS (J-PARC E16 Experiment) YUHEI MORINO RIKEN Nishina Center 1.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
SRS readout for Fermilab Test Beam Facility (FTBF) (R&D for all GEMs Tracking and PID detectors for EIC) Outline  GEM detectors R&D for EIC Tracking.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
MMDAQ Content – Overview – Case study – adding support for VMM1 chips – Drawings (data flow, concurrency, error reporting, scalability, monitoring) 13.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Abstract Muon tomography for homeland security aims at detecting well- shielded nuclear contraband in cargo and imaging it in 3D. The technique exploits.
Uva GEM R&D Update –Part I Kondo Gnanvo, Nilanga Liyanage, Vladimir Nelyubin, Kiadtisak Saenboonruang, Taylor Scholz and Adarsh Ramakrishnan In Collaboration.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Integration with ATLAS DAQ Marcin Byszewski 23/11/2011 RD51 Mini week Marcin Byszewski, CERN1.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
Scalable Readout System Data Acquisition using LabVIEW Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
SRTSC A LabVIEW based Test and Hardware Configuration System for SRS Volkan Gezer Eskisehir Osmangazi University & CERN.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
Digital Acquisition: State of the Art and future prospects
“Medium Term”: VFAT2 + SRS readout system
DAQ and TTC Integration For MicroTCA in CMS
Electronics for GEM R&D at the University of Virginia
PRAD DAQ System Overview
RD51-WG X June test beam experience: useful information for October
Large Area Endplate Prototype for the LC TPC
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
mmDAQ (Muon Atlas MicroMegas Activity – ATLAS R&D)
Large CMS GEM with APV & SRS electronics
DAQ for SBS GEM SBS collaboration meeting August 6th 2019
Presentation transcript:

Update on APV25-SRS Electronics Kondo Gnanvo

Outline Various SRS Electronics Status of the APV25-SRS UVa Test of the SRU with multiple FECs at CERN

Small size Scalable Readout System (SRS) Most popular version of the SRS In use now in many detector R&D lab Very stable and and easy to operate Have been used in our lab at UVa for 2 years now for the test and the characterization all our SBS GEM prototype Available DAQ: DATE (ALICE CERN) mmDaq (ATLAS MAMMA CERN) rcDaq (PHENIX BNL) LabView (RD51 CERN 9/11/2013SBS weekly Meeting3

Medium size SRS (up to 16k Channels) Run with a network switch for the data transfer to the DAQ PC Stable with up to 4 FECs on the switch but limited acquisition rate FEC trigger and clock synchronization via CTF card Medium size SRS in used for 3 years at Florida Tech 9/11/2013SBS weekly Meeting4

Toward Large SRS with SRU module 40 x DTC links 4 x LVDS trigger TTCrx optical 4 x NIM in 4 x NIM out 4 x SFP+ 2 GB DDR Virtex 6 The Scalable Readout Unit (SRU) is needed to use the SRS for large size amount of channels (> 16 K Ch) Event builder: collect events from up to 40 FECs and send to the DAQ PC via a 10 Gb optical link SRU distribute the trigger and clock signals via DTCC links to the FEC and APV25 hybrids Successful test of the SRU + FECs in 08/2013 (see next slides) 9/11/2013SBS weekly Meeting5

Commercial SRS: ATCA-SRS by EicSys (Germany) Certified crate standard: ADC/FEC combo replaced by ATCA blades Higher channel integration => reduce cost/channel for large systems Replace DTCC cables by ATCA backplane First implementation uses the standard SRU  but later version with ATCA-SRU 9/11/2013SBS weekly Meeting6

Status of the APV25-SRS UVa We have been running the small size SRS for about two years now Use for characterization of all SBS prototypes built at UVa Very good performance and stable system CERN ALICE DATE & AMORE use for the daq Small size SRS (2 K channels) 9/11/2013SBS weekly Meeting7

Status of the APV25-SRS UVa 80 APVs hybrids  tested OK 5 FEC cards V.6 (major upgrade of the current V.3) still prototype level 6 ADC cards  3 already delivered and tested OK, we are still waiting for remaining 3 1 Full Power Euro crate  power up to 8 FECs One SRU module to read out up to 40 FECs  tested OK at CERN August 2013 (next slides) New: 90 o angle HDMI cable for APV25 hybrids Newly acquired medium size SRS system (10K channels) 9/11/2013SBS weekly Meeting8

Quote and Estimated cost for 73K channels AP25-SRS Status of the APV25-SRS UVa 14-slots ATCA-SRS $128,372  $1.74 / ch (quote from EicSys) 576 APVs $86,400  $1.18 / ch (current cost) 2 (to 4) SRU $8,000 to $16000  $ 0.11 (to $0.22) / ch (current cost) 2 PCs + 10 Gb $6000  $0.08 / ch (Estimate) 288 HDM (A-D) cables $3200  $0.04 / ch (current cost) 288 HDMI (A-A) cables 5m (if needed $7200  $0.1 /ch (current cost) 288 HDM $2100  $0.025 /ch (current cost) 288 SAMTEC flat cable for master/slave $2800  $0.03 /ch (current cost) 4304 SAMTEC Grounding $7000  $0.09 / ch (current cost) TOTAL: $273 k  $3.7 / ch 9/11/2013SBS weekly Meeting9

Test of the SRU with Multiple FECs First time SRU was been tested with more than one FEC card Test performed at CERN August, 15 th – 30 th 2013 Many groups interested and involved in the test: UVa (Kondo Gnanvo) RD51 Electronics WG5 (Hans Muller & Alfonso Tarazona) RD51 GDD lab at CERN (Eraldo Oliveri) ATLAS MAMMA Group (Andre Zibel, Michele Bianco) SRS Material used for the test: UVa: SRU + FP Euro crate + 1 FEC card + 4 ADCs cards + 40 apv25 hybrids Florida Tech: 2 FEC/ADC combos MAMMA Group at CERN: 2 FEC/ADC combos + Micromegas Tracker Telescope RD51 GDD: 2 FEC/ADC combos + x-ray box and DATE PC 9/11/2013SBS weekly Meeting10

Test of the SRU with Multiple FECs Firmware version that was tested SRU Firmware: SRU as a switch with the FEC send FEC IP Final version: SRU build the event of all the FEC and send one fragment to the DAQ PC Data transmission to the PC via 1 Gb Ethernet copper cable Final version: transmission through 10 Gb optical link External trigger to the SRU which distribute to the FEC/APVs through FEC firmware version without zero suppression ATLAS MAMMA group also tested the zero suppression version 9/11/2013SBS weekly Meeting11

SRU on X-ray box in GDD CERN DATE Run Control Display SRS-SRU tested in RD51-GDD X-ray box 8 FECs card connected to the SRU 70 APV25 Hybrids, 4 APV25 connected to a small 10 x 10 GEM chamber Trigger from the bottom GEM foil Preliminary evaluation of the high rate capability of the system 9/11/2013SBS weekly Meeting12

SRU on X-ray box in GDD CERN Some preliminary plots from the small GEM 9/11/2013SBS weekly Meeting13

Preparation for the Test beam at Fermilab October 2013 The system we tested has been shipped to UVa expect it to be delivered today … Setup the SRS-SRU with 4 FECs and 64 apvs here in the lab – Take data with our 2 SBS GEMs + SoLID GEM prototypes This setup at in the lab will be a rehearsal for the FNAL test beam we are going Expect to stress the APV25-SRS-SRU during that test beam Next step: Another travel to CERN in January 2014 Status of the SBS GEM production New round of test of the SRS Electronics. The plan is to test with the developpers: 10 Gb link data transmission to the DAQ PC New FEC V.6 and Zero suppression firmware implementation in FEC FPGA The prototype of the commercial ATCA-SRS crate 9/11/2013SBS weekly Meeting14