Copyright © 2012 SCKCEN Didier De Bruyn (SCKCEN), with contributions from Rafaël Fernandez (SCKCEN), Luigi Mansani (Ansaldo), Antony Woaye-Hune (AREVA),

Slides:



Advertisements
Similar presentations
MYRRHA An innovative and unique irradiation research facility
Advertisements

A case history of CFD support to Accelerator Driven System plant
Copyright © 2012 SCKCEN WP1: Reference design objectives and specifications Didier De Bruyn (SCKCEN), Presented by Alessandro Alemberti (ANS) 1 7th LEADER.
Didier De Bruyn & Rafaël Fernandez (SCKCEN), Luigi Mansani (Ansaldo), Antony Woaye-Hune (AREVA), Massimo Sarotto (ENEA) & Evaldas Bubelis (KIT) ICAPP’12.
MYRRHA within the EURATOM roadmap MYRRHA Accelerator 1st International design review, SCK-CEN (Brussels, BE), 12-13/11/2012 Roger GARBIL Acting Head of.
HZDR FLUKA activities in support of the MYRRHA Project Short summary with a focus on activation problems Anna Ferrari, Stefan Müller, Jörg Konheiser.
EURISOL Transition period MYRRHA and
Copyright © 2012 SCKCEN The MYRRHA Project Lucia Popescu SCKCEN
Seminar on ESS29 November Seminar on neutron research centre in the Øresund region (European Spallation Source) 29 November 2002.
Copyright © 2013 SCKCEN MAX School - Frankfurt am Main – 1 st -2 nd October 2013 MYRRHA Multipurpose hYbrid Research Reactor for High-tech Applications.
MYRRHA ADS, What’s that ? and what for ?
Nuclear Fuels Storage & Transportation Planning Project Office of Fuel Cycle Technologies Nuclear Energy A History of Standardized, Multipurpose Canister.
1Jean-Luc Biarrotte, SPL/ESS meeting, Lünd, June 30, Accelerator design for MYRRHA J-L. Biarrotte, CNRS-IN2P3 / IPN Orsay.
AREVA NP EUROTRANS WP1.5 Technical Meeting Task – ETD Safety approach Safety approach for EFIT: Deliverable 1.21 Lyon, October Sophie.
Framatome ANP IP-EUROTRANS Meeting WP 1.5 Progress in safety approach development TEE, March Sophie EHSTER.
AREVA NP EUROTRANS WP1.5 Technical Meeting Task – ETD Safety approach Safety approach for XT-ADS: Deliverable 1.20 Lyon, October Sophie.
The main function of the divertor is minimizing the helium and impurity content in the plasma as well as exhausting part of the plasma thermal power. The.
Copyright © 2014 SCKCEN EuCARD-2/MAX Accelerators for Accelerator Driven Systems Workshop – CERN, Switzerland – March 20 th –21 st 2014 MYRRHA Multipurpose.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Nuclear and Energy Technologies.
Yacine Kadi Thorium Energy Conference 2013 Globe of Innovation, CERN, Switzerland October 31, 2013.
1 MCNP simulation of salt channel in LR-0 reactor 12th session of the AER Working Group F - "Spent Fuel Transmutations" and 3rd meeting of INPRO Project.
Copyright © 2012 SCKCEN 3 rd LEADER International workshop Pisa & Bologna, 4-7 September 2012 Didier De Bruyn (SCKCEN) 1 Different ADS concepts in the.
Task 3.3 Fuel Transfer System Conceptual design Joel Janssens SCKCEN LEADER WP3 Technical Meeting, Karlsruhe, 20/11/2012 Copyright © 2011 SCKCEN.
EUROPEAN LEAD FAST REACTOR The LEADER project aims to define an European Lead Fast Reactor configuration for an industrial-sized (600 MWe, the ELFR) reactor,
Advanced Test Reactor.
1 TCADS, Technology & Components of Accelerator Driven Systems, March 15-17, 2010, Karlsruhe (DE) Copyright © 2009 SCKCEN MYRRHA: ADS Programme in Belgium.
Nuclear Energy Options and Project-X Shekhar Mishra Fermilab Yousry Gohar ANL June 7 th 2010.
MA and LLFP Transmutation Performance Assessment in the MYRRHA eXperimental ADS P&T: 8th IEM, Las Vegas, Nevada, USA November 9-11, 2004 E. Malambu, W.
Lead Technology Task 6.2 Materials for mechanical pump for HLM reactors M. Tarantino, I. Di Piazza, P. Gaggini Work Package Meeting Karlsruhe, November.
LEADER Project Overview
Copyright © 2014 SCKCEN MYRRHA Multipurpose hYbrid Research Reactor for High-tech Applications A flexible and fast spectrum irradiation facility Eucard2-MAX.
D29 - Roadmap for LFR development Davide Mattioli ENEA UTFISSM-PRONOC LEADER (Lead-cooled European Advanced DEmonstration Reactor) WP 1 - Task 1.1 Amsterdam.
Work Package 2 Giacomo Grasso ENEA UTFISSM-PRONOC LEADER Work Package 2 meeting Madrid, May 8, 2012 Current status and organization of the work.
IAEA International Atomic Energy Agency IAEA Activities in the Area of Partitioning and Transmutation Alexander Stanculescu Nuclear Energy Department Nuclear.
4/2003 Rev 2 I.4.8 – slide 1 of 60 Session I.4.8 Part I Review of Fundamentals Module 4Sources of Radiation Session 8Research Reactors IAEA Post Graduate.
Simulations of Accelerator Driven Systems (ADS) Aleksander Polanski Joint Institute for Nuclear Research, Dubna, Russia. The Andrzej Soltan Institute for.
LEADER WP3 Conceptual Design Status KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, Luigi Mansani
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 16th TOFE Madison, Sept , EUROPEAN TECHNOLOGICAL EFFORT IN PREPARATION OF ITER CONSTRUCTION ROBERTO.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
ALFRED System Configuration Luigi Mansani
The Proposed Materials Test Station at LANSCE Eric Pitcher Los Alamos National Laboratory Presented at the Workshop on High-Power Targetry for Future.
CAS, BilbaoMueller, Ugena, Velez, Zerlauth May 31 st v0 SCC – Industrial ADS.
ALFRED and ELFR design overview Technical Workshop to Review Safety and Design Aspects of European LFR Demonstrator (ALFRED), European LFR Industrial Plant.
Copyright © 2013 SCKCEN Pb-Bi target for Optimization toward higher yields SCKCEN Mentor : Dr. Lucia-Ana Popescu University Promoter : Prof.
Copyright © 2013 SCKCEN Legacy sites in Belgium K. Mannaerts, S. Pepijn FANC - AFCN D. Jacques, H. Vandenhove Institute Environment, Health and Safety.
ALFRED Control Rod and Safety Rod
Copyright © 2013 SCKCEN MYRRHA Multipurpose hYbrid Research Reactor for High-tech Applications Contributing to the 3 rd Pillar of the European Strategy.
Copyright © 2014 SCKCEN Production of medical radioisotopes at MYRRHA Lucia Popescu SCKCEN
WP1: Reference design objectives and specifications Didier De Bruyn SCKCEN Fourth PCC meeting FP7 LEADER Bologna, 27 October.
LEADER WP3 Conceptual Design Status KIT Campus North, Karlsruhe, Luigi Mansani
Copyright © 2015 SCKCEN ADS accelerator developments presently on-going for MYRRHA and possibly for the Chinese-ADS Dirk Vandeplassche 1 Eucard-2 — APAE.
Task 2.1: Review of ELSY and Conceptual design & neutronic characterization of the ELFR Industrial Plant Kamil Tuček on behalf of Task 2.1 contributors.
Technical Meeting on SP1 DESIGN of IP EUROTRANS FZK December 16, 2003 Presentation of SP1 DESIGN Structure and Contents Up-dates H. Aït Abderrahim.
“Design and safety analysis of Alfred” G. Forasassi President of CIRTEN CIRTEN Interuniversity Consortium for Technological Nuclear Research 3 rd LEADER.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Neutron Physics and Reactor.
1 Overview of the MYRRHA accelerator & presentation of the MAX project Jean-Luc BIARROTTE CNRS-IN2P3 / IPN Orsay, France EURATOM FP7 MAX project coordinator.
Copyright © 2013 SCKCEN MYRRHA Design overview Didier De Bruyn (SCKCEN) LEADER technical workshop Petten, February 2013.
Sources of Radiation Research Reactors
A Low Power ADS Demonstrator Hywel Owen School of Physics and Astronomy University of Manchester.
LOW PRESSURE REACTORS. Muhammad Umair Bukhari
November 19th 2010, Bologna LEADER 1 1st LEADER PCC MEETING WP4 PLANT OPERATION, INSTRUMENTATION, CONTROL AND PROTECTION SYSTEM DESIGN.
MYRRHA Prof. Dr. Hamid Aït Abderrahim SCK•CEN
Copyright © 2013 SCKCEN Nuclear-physics applications of MYRRHA Lucia Popescu SCKCEN
Absent, yet Present? Tracing “Responsible Innovation” in Radiation Protection Research Michiel van Oudheusden Ricomet Conference – Vienna – June.
Analyses to Support Waste Disposition of SNS Inner Reflector Plug
Summary of session 5: Innovative Ideas and New R&D
Challenges and Perspectives of Accelerator Driven Systems (ADS)
LOW-POWER RESEARCH REACTOR FOR EDUCATION AND TRAINING
Session Name: Lessons Learned from Mega Projects
TRANSPORTATION CASK AND CONCRETE MODULE DESIGN FOR MANAGING NUCLEAR SPENT FUEL PRODUCED IN BUSHEHR NUCLEAR POWER PLANT A.M. TAHERIAN Iran Radioactive Waste.
Presentation transcript:

Copyright © 2012 SCKCEN Didier De Bruyn (SCKCEN), with contributions from Rafaël Fernandez (SCKCEN), Luigi Mansani (Ansaldo), Antony Woaye-Hune (AREVA), Massimo Sarotto (ENEA) & Evaldas Bubelis (KIT) for the primary systems and Jeroen Engelen (SCKCEN), Alberto Ortega & Manuel Perezagua Aguado (Empresarios Agrupados) for the building design 3 rd LEADER International workshop Pisa & Bologna, 4-7 September MYRRHA configuration & design

Copyright © 2012 SCKCEN Contents Purpose of the MYRRHA project at SCKCEN Place of FP7 CDT project in this frame Conclusions related to primary system Illustrations of primary system design today Conclusions related to building design & plant layout Illustrations of building design today Way ahead to construction 2

Copyright © 2012 SCKCEN Reactor Subcritical / critical mode 65 to 100 MW th Accelerator (600 MeV - 4 mA proton) Fast Neutron Source Spallation Source Lead-Bismuth coolant Multipurpose Flexible Irradiation Facility MYRRHA is an Accelerator Driven System 3 Innovative & Unique

Copyright © 2012 SCKCEN Continuity: SCKCEN has a long tradition of «first of a kind» 4 Inventor of innovative nuclear fuel (MOX fuel) 1st pressurized water reactor (PWR) outside of US (BR3) World first underground laboratory for R&D on HL waste disposal (HADES) World premiere project for transmutation of nuclear waste Highest performing material testing reactor in Europe (BR2) World first lead based ADS (GUINEVERE)

Copyright © 2012 SCKCEN ALLEGRO Experimental reactor (GFR) ASTRID Prototype (SFR) SFR Supporting infrastructures, research facilities MYRRHA ETPP European demonstration reactor (LFR) Reference technology Alternative technology LFR GFR The place of MYRRHA in ESNII European Sustainable Nuclear Industrial Initiative MYRRHA Fast spectrum irradiation facility 5

Copyright © 2012 SCKCEN MYRRHA is an international project 6

Copyright © 2012 SCKCEN Contents Purpose of the MYRRHA project at SCKCEN Place of FP7 CDT project in this frame Conclusions related to primary system Illustrations of primary system design today Conclusions related to building design & plant layout Illustrations of building design today Way ahead to construction 7

Copyright © 2012 SCKCEN The CDT project aimed at going further: Starting from the outcome of different FP projects (PDS-XADS, EUROTRANS) and national initiatives (MYRRHA), Obtain a more advanced design of a flexible irradiation facility, FASTEF, able to work in both sub-critical and critical mode, Setting also up a centralised multi-disciplinary team, based at Mol for its core group, Concentrating on primary and core systems and on reactor building design & plant layout, The project started in April 2009 for a duration of 36 months. 8

Copyright © 2012 SCKCEN Contents Purpose of the MYRRHA project at SCKCEN Place of FP7 CDT project in this frame Conclusions related to primary system Illustrations of primary system design today Conclusions related to building design & plant layout Illustrations of building design today Way ahead to construction 9

Copyright © 2012 SCKCEN FASTEF is a performing, rubust facility Maximum core power amounts 100 MWth; High fast flux intensity obtained by maximizing power density; Many positions available in the core to host experiments; All components in reactor vessel designed to be removable; Diaphragm separates hot and cold coolant; Safety analyses demonstrate robustness against transients. 10

Copyright © 2012 SCKCEN Contents Purpose of the MYRRHA project at SCKCEN Place of FP7 CDT project in this frame Conclusions related to primary system Illustrations of primary design today Conclusions related to building design & plant layout Illustrations of building design today Way ahead to construction 11

Copyright © 2012 SCKCEN Reactor Vessel Reactor Cover Core Support Structure Core Barrel Core Support Plate Jacket Core Reflector Assemblies Dummy Assemblies Fuel Assemblies Spallation Target Assembly and Beam Line Above Core Structure Core Plug Multifunctional Channels Core Restraint System Control Rods, Safety Rods, Mo-99 production units Primary Heat Exchangers Primary Pumps Si-doping Facility Diaphragm IVFS IVFHS IVFHM Reactor layout 12

Copyright © 2012 SCKCEN Reactor Vessel 13 Main dimensions Height: about m Inner diameter: 8 m Wall thickness: 80 mm Material AISI 316L Weight About 320 ton

Copyright © 2012 SCKCEN Reactor Cover 14 Main dimensions Height: 2 m Outer diameter: 9.3 m Material AISI 316L Concrete Weight About 340 ton

Copyright © 2012 SCKCEN Reactor Cover 15

Copyright © 2012 SCKCEN Diaphragm 16 Main dimensions Double plate design Baffle In-vessel fuel storage Height: about 9.8 m Inner diameter: 7.7 m Wall thickness: 50 mm Lower plate thickness: 80 mm Upper plate thickness: 50 mm Material AISI 316L Weight About 190 ton

Copyright © 2012 SCKCEN Core and Fuel Assemblies positions & 37 multifunctional plugs

Copyright © 2012 SCKCEN Contents Purpose of the MYRRHA project at SCKCEN Place of FP7 CDT project in this frame Conclusions related to primary system Illustrations of primary system design today Conclusions related to building design & plant layout Illustrations of building design today Way ahead to construction 18

Copyright © 2012 SCKCEN Building design & plant layout have been optimized: The plant comprises a front-end accelerator building, a LINAC tunnel, a RF gallery, a reactor building (total length about 450 m) and several auxiliaries; room should be kept for future extensions; Within the reactor building, several workflows have been considered (entry of experiments, fuel & components; evacuation of experiments & commercial productions, spent fuel & waste); Short-term activities (production of medical radioisotopes & silicon ingots) should not interfere with long-term operations (irradiations); So the whole facility should be versatile and flexible, therefore complex. 19

Copyright © 2012 SCKCEN Contents Purpose of the MYRRHA project at SCKCEN Place of FP7 CDT project in this frame Conclusions related to primary system Illustrations of primary system design today Conclusions related to building design & plant layout Illustrations of building design today Way ahead to construction 20

Copyright © 2012 SCKCEN Today’s concept of plant layout REACTOR BUILDING FRONT-END ACCELERATOR LINAC + RF GALLERY 21

Copyright © 2012 SCKCEN General layout REACTOR BUILDING LINAC VITO SCK-CEN I S O L RF 22

Copyright © 2012 SCKCEN Vertical section in the Reactor building SECTION BB 23

Copyright © 2012 SCKCEN Horizontal section in the Reactor building LEVEL 00 24

Copyright © 2012 SCKCEN Horizontal section in the Reactor building LEVEL 91 25

Copyright © 2012 SCKCEN Vertical section in the Reactor building SECTION AA 26

Copyright © 2012 SCKCEN Contents Purpose of the MYRRHA project at SCKCEN Place of FP7 CDT project in this frame Conclusions related to primary system Illustrations of primary system design today Conclusions related to building design & plant layout Illustrations of building design today Way ahead to construction 27

Copyright © 2012 SCKCEN The project schedule 2010 – 2014: Front End Engineering Design; file for the Belgian Government 2015: Tendering & Procurement 2016 – 2018: Civil Engineering & construction of components 2019: On site assembly 2020 – 2022: Commissioning at progressive power 2023: Progressive start-up 2024 – 20??: Full exploitation 28

Copyright © 2012 SCKCEN Copyright © SCK  CEN PLEASE NOTE! This presentation contains preliminary data for dedicated use ONLY and may not be cited without the explicit permission of the author. If this has been obtained, please reference it as a “personal communication. Copyright SCKCEN”. SCKCEN Studiecentrum voor Kernenergie Centre d'Etude de l'Energie Nucléaire Belgian Nuclear Research Centre Stichting van Openbaar Nut Fondation d'Utilité Publique Foundation of Public Utility Registered Office: Avenue Herrmann-Debrouxlaan 40 – BE-1160 BRUSSELS Operational Office: Boeretang 200 – BE-2400 MOL