Optical Telescope Assembly R&D Phase WBS 2.2 M. Lampton Space Sciences Laboratory University of California Berkeley 09 July 2002 Draft OTA10, 5 June 2002.

Slides:



Advertisements
Similar presentations
Astronomy Notes to Accompany the Text
Advertisements

This document is not export controlled. Use or disclosure of this information is subject to the restrictions on the Title Page of this document 2.4m Space.
CMSC 2006 Orlando Active Alignment System for the LSST William J. Gressler LSST Project National Optical Astronomy Observatory (NOAO) Scott Sandwith New.
Chapter 5 Telescopes. 5.1 Optical Telescopes The Hubble Space Telescope 5.2 Telescope Size The Hubble Space Telescope 5.3 Images and Detectors Diffraction.
1 Astronomical Observational Techniques and Instrumentation RIT Course Number Professor Don Figer Telescopes.
PACS IIDR 01/02 Mar 2001 Baffle and Straylight1 D. Kampf KAYSER-THREDE.
GoBears Telescope Ideas M. Lampton UCB Space Sciences Lab 15 March 2007.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Science Calibration & Instrument Status TIPS 20 Nov 2003 Last COS TIPS Aug 2003.
M2 Assembly and Feed Optics Ron Price August 25, 2003.
September 24, 2005 Magellan F/15 Chopping Secondary 1 Magellan F/15 Chopping Secondary Magellan SAC Meeting Laird Close (Principle Investigator) Victor.
Optics for Photo-Visual Alt-Az Telescopes Dallas Workshop Dave Rowe October 27, 2007.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y Earth Atmosphere.
Telescopes (Chapter 6). Based on Chapter 6 This material will be useful for understanding Chapters 7 and 10 on “Our planetary system” and “Jovian planet.
1 Telescope Optical Performance Breakout Session M.Lampton UCBerkeley Space Sciences Lab 10 July 2002.
Space Frame Structures for SNAP Bruce C. Bigelow University of Michigan Department of Physics 11/04/04.
Dennis C. Evans p1 SuperNova/Acceleration Probe 16 November 2001 Optical Analysis & Stray Light Evaluation Optical Analysis and Stray Light Evaluation.
8 September Observational Astronomy TELESCOPES, Active and adaptive optics Kitchin pp
SNAP OTA Baseline TMA62 M.Lampton Jan 2002 UC Berkeley Space Sciences Lab.
The Field Camera Unit Project definition, organization, planning S. Scuderi INAF – Catania.
Engineering: NAHUAL Ireland Acquisition Camera, Focal Plane Mechanisms and Layout Tully Peacocke, National University of Ireland Maynooth Carlos del Burgo,
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
Determinate Space Frame Telescope Structures for SNAP Bruce C. Bigelow University of Michigan Department of Physics 7/28/04.
Optical Configuration Advanced Virgo Review Andreas Freise for the OSD subsystem.
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
Magellan F/5 System Status A.Szentgyorgyi/SAO/25 Sept 2004.
Telescope Optical Performance M.Lampton UCBerkeley Space Sciences Lab 10 July 2002 draft 6, 7 June 2002.
Near Infrared Spectro-polarimeter (NIRSP) Conceptual Design Don Mickey Jeff Kuhn Haosheng Lin.
SNAP Integration Model V. S14 The SNAP Integration Model Mechanical [ SC4 Breakout ] Robin Lafever LBNL Engineering.
© 2008 Pearson Education, Inc., publishing as Pearson Addison-Wesley This work is protected by U.S. copyright laws and is provided solely for the use of.
Optical principles of diffraction focussing, Preparing the way to space borne Fresnel imagers NiceSeptember 23-25, Laurent Koechlin Laboratoire.
FIRST/Planck 12 December 2000PT The FIRST Mission Implementation Status and Schedule T. Passvogel The Promise of FIRST.
Telescope Integration and Tests Tuesday Afternoon.
SNAP Telescope M.Lampton f, C.Akerlof b, G.Aldering a, R.Amanullah c, P.Astier d, E.Barrelet d, C.Bebek a, L.Bergstrom c, J.Bercovitz a, G.Bernstein e,
NIRSpec Operations Concept Michael Regan(STScI), Jeff Valenti (STScI) Wolfram Freduling(ECF), Harald Kuntschner(ECF), Robert Fosbury (ECF)
PACS SVR 22/23 June 2006 PACS FPU Subunits1 FM FPU Subunits A. Poglitsch.
NORDFORSK Summer School, La Palma, June-July 2006 NOT: Telescope and Instrumentation Michal I. Andersen & Heidi Korhonen Astrophysikalisches Institut Potsdam.
K-D-PR Fabrication and testing of KGMT FSM prototype Oct Ho-Soon Yang, Hak-Yong Kihm, Il-Kwon Moon, Jae-Bong Song, Yun-Woo Lee Korea.
1 Mission Discussion & Project Reviews 祝飛鴻 10/14/93.
20 OCT 2003SOLAR ORBITER MEETING1 Optical Design Activities at RAL Kevin Middleton Optical Systems Group Space Science & Technology Dep’t. Rutherford Appleton.
MAXIM Periscope ISAL Study Highlights ISAL Study beginning 14 April 2003.
Henry Heetderks Space Sciences Laboratory, UCB
Delta II 7925H - 10L Baseline workup Launch Vehicle TheirsOurs Delta II 7925H Launch Vehicle 10L Composite Fairing 10L Stretch Composite Payload Fairing.
FELT 1 Study of the capability and configuration of a fixed mirror Extremely Large Telescope (FELT) Low cost path to large telescope Primary concern is.
Improved Annular-Field Three-Mirror Anastigmat? M.Lampton UCB SSL Previous AFTMAs have pri-sec separation 2.4m Can pri-sec separation be reduced? –Support.
SNAP Calibration Program Steps to Spectrophotometric Calibration The SNAP (Supernova / Acceleration Probe) mission’s primary science.
AURA New Initiatives Office. GSMT SWG Meeting L. Stepp, July 30, 2002 NSF Science Working Group Support Available from AURA NIO Available Personnel Current.
Chapter 5 Telescopes Chapter 5 opener. This composite photograph shows two of the premier optical telescopes available to astronomers today. At the top,
Design and Development of the FSM (Fast steering Secondary Mirror)
1 System Architecture Mark Herring (Stephen Merkowitz Presenting)
1 Initial Study Task Mark Herring / Jordan Camp. 2 May 13, 2003 Topics Purpose of Initial Study Task Schedule and Format Task Description.
Extended Detector Cutoff Considerations WFIRST Project Office May
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
Lightweight mirror technology using a thin facesheet with active rigid support J. H. Burge, J. R. P. Angel, B. Cuerden, H. Martin, S. Miller University.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Wes Ousley June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Thermal.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y APS Formation Sensor.
The Field Camera Unit Results from technical meeting S. Scuderi INAF – Catania.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t S y n t h e s i s & A.
X-ray Interferometer Mirror Module ISAL Study Pre-work Overview.
Content Lessons from writing proposals and work on PTDR How can this meeting help to remedy problems SCT AOB.
Composite Mirror Applications, Inc
Point Source Transmission Simulations on the COROT baffle
Intra-pixel Sensitivity Testing Preliminary Design Review
Henry Heetderks Space Sciences Laboratory, UCB
FRED Coherence FRED: A software tool for modern engineering.
Astronomical Observational Techniques and Instrumentation
Optics Alan Title, HMI-LMSAL Lead,
Instrument Overview Larry Springer HMI Program Manager
CHEOPS - CHaracterizing ExOPlanet Satellite
Presentation transcript:

Optical Telescope Assembly R&D Phase WBS 2.2 M. Lampton Space Sciences Laboratory University of California Berkeley 09 July 2002 Draft OTA10, 5 June 2002

Telescope: Overview l Schedule and WBS Overview l Science Driven Requirements l Baseline Characteristics l Telescope Status l R&D Issues l R&D Goals l R&D Schedule l R&D Manpower l R&D Costs l R&D Management l Summary

Overall Schedule draft May

Telescope: WBS Overview TELESCOPE SYSTEMS ENGINEERING Develop telescope requirements Telescope design and evaluate trades Telescope analyses Optical performance Stray light Telescope I&T planning TELESCOPE SUBSYSTEMS Optical subsystems; GSE Mirrors Baffles Mechanical: structure & GSE Precision metering structure Mechanisms: focussers, alignment Mirror actuators Shutter Thermal control Electrical TELESCOPE INTEGRATION AND TEST TELESCOPE SOFTWARE (alignment; focussing) TELESCOPE SUPPORTING ACTIVITIES

Telescope: Science Driven Requirements Light Gathering Power —must measure SNe 4 magnitudes fainter than 26 magnitude peak —require SNR of 50:1 at peak brightness —presence of zodiacal light foreground radiation —time-on-target limited by revisit rate & number of fields —spectroscopy demands comparable time-on-target —requires geometric diameter ~ 2 meters Angular resolution —signal to noise ratio is driver —diffraction limit is an obvious bound —Airy disk at one micron wavelength is 0.12 arcseconds FWHM —other blur contributions must be kept well below this limit. Field of View —determined by required supernova discovery rate —volume of space is proportional to field of view —one degree field of view will deliver the requisite discovery rate Wavelength Coverage —0.35 to 1.7 microns requires all-reflector optical train

Telescope Status: Baseline Configuration Prolate ellipsoid concave primary mirror Hyperbolic convex secondary mirror Flat folding mirror with central hole Prolate ellipsoid concave tertiary mirror Flat focal plane Delivers < 0.06 arcsecond FWHM geometrical blur over annular field 1.37 sqdeg Adapts to focal lengths 15 meters through 30 meters; baseline=21.66m Provides side-mounted detector location for best detector cooling

Baseline OTA Characteristics Aperture: 2 meters Annular Field of View: ~1 sq deg Wavelength Range: 0.35 to 1.7 microns Strehl: >90% at 1.0 microns WFE: <50 nm RMS Focal surface: flat EFL: meters, f/11 Stray light: << Zodiacal foreground

Telescope Status: History Wide-field high-resolution telescopes are NOT new —Schmidt cameras (1930 to present) —Wynne cameras (e.g. FAUST) —Field-widened cassegrains, Gascoigne (1977-); SDSS —Paul three-mirror telescopes (1935) and Baker-Paul —Cook three-mirror anastigmats “TMAs” (1979) —Williams TMA variants (1979) —Korsch family of TMAs (1980) —Angel-Woolf-Epps three-mirror design (1982) —McGraw three-mirror system (1982) —Willstrop “Mersenne Schmidt” family (1984) —Kodak “IKONOS” Earth Resources telescope = TMA —LANL/Sandia/DoE Multispectral Thermal Imager = TMA

Telescope Status: Downselection : TMA Suitability Assessments —off-axis designs attractive but unpackagable; rejected —four, five, and six-mirror variants explored; rejected —annular field TMA concept rediscovered & developed —TMA43 (f/10): satisfactory performance but lacked margins for adjustment —TMA55 (f/10): improved performance, shorter pri-sec, margins OK —TMA59 (f/15): same but with longer focal length —TMA62 (f/11): transverse rear axis with filter wheel —TMA63 (f/11): transverse rear axis, no filter wheel

Payload Layout 1 Telescope is a three-mirror anastigmat 2.0 meter aperture 1.37 square degree field Lightweight primary mirror Low-expansion materials Optics kept near 290K Transverse rear axis Side Gigacam location passive detector cooling combines Si & HgCdTe detectors Spectrometers share Gigacam focal plane Minimum moving parts in payload shutter for detector readouts

Payload Layout 2

Telescope: Image Quality Issues Image quality drives science SNR, exposure times,.... Many factors contribute to science image quality —diffraction: size of aperture, secondary baffle, struts,... —aberrations: theoretical imaging performance over field —manufacturing errors in mirrors —misalignments & misfocussing of optical elements —dirt, contamination, or nonuniformity in mirror coating —guiding errors —spacecraft jitter —detector issues Work has begun on a comprehensive budget —ongoing simulation team efforts —Bernstein’s “Advanced Exposure Time Calculator” PASP —telescope studies feed into the simulations

Telescope Status: Ray Trace TMA62/TMA63 configuration Airy-disk zero at one micron wavelength 26 microns diam=0.244arcsec

Telescope Status: Pupil Obscuration Trades

Telescope Status: Stray Light Trades Guiding principle: keep total stray light FAR BELOW natural Zodi R.O.M. assessment gives... —Natural Zodi (G.Aldering) = 1 photon/pixel/sec/micron —Starlight+Zodi scattered off primary mirror = —Starlight+Zodi scattered off support spider < —Sunlight scattered off forward outer baffle edge = 2E-5 —Earthlight scattered off forward outer baffle inner surface = 0.02 —Total stray = 0.02 photon/pixel/sec/micron Long outer baffle is clearly preferred —limit is launch fairing and S/C size ASAP software in place ASAP training 2001; further training in 2003 Preliminary telescope ASAP models being built ASAP illumination environment models being built Our intension is to track hardware & ops changes as they occur, allowing a “system engineering management” of stray light.

Telescope Technology Roadmap Existing technologies are suitable for SNAP Optical Telescope Assembly New materials, processes, test & evaluation methods are unnecessary Mirror materials —Corning ULE glass: extensive NRO flight history; lightweight —Schott Zerodur glass/ceramic composite: lower cost, widely used in ground based astronomical telescopes; huge industrial base —Astrium/Boostec SiC-100: newcomer; unproven in space optics; higher CTE; adoped for Herschel/FIRST in infrared Metering structure materials —M55J carbon fiber + cyanate ester resin; epoxy adhesive bonds —full report in Pankow presentation Mirror finishing technology —conventional grind/polish/figure using abrasives —ion-beam figuring available from two vendors Mirror surface metrology —same as other space telescopes, e.g. cassegrains —standard interferometer setups will do the job for SNAP —no unusual accuracy drivers have been encountered

Telescope Status: Mirror Materials Trade Corning ULE ultra-low expansion glass —face sheets bonded to honeycomb core —achieves 85-90% lightweight; anticipate 250kg primary —extensive manufacturing & test history —meets our performance requirements —attractive for its high natural resonance frequencies, low sag —eases mass margin for entire mission Schott Zerodur glass/ceramic material —solid blank, weight relieved by milling backside —achieves 70-80% lightweight; anticipate 350kg primary —extensive manufacturing & test history —meets our performance requirements Study contract is in place

Telescope Trade Studies Summary Trade Studies worked during Pre-R&D Phase —Optical configuration: >>TMA —Warm optics vs cold optics: >>warm —FIDO integrated sensor array vs separated: >>integrated Trade Studies continuing through R&D Phase —Mirror materials: ULE vs Zerodur vs others —Exact aperture: cost & schedule vs aperture —Strehl ratio: cost vs performance —Focal length: is 21.66m the right value? —Pupil obscuration issues secondary mirror baffle strut configuration —Mirror thickness, rib design, stiffness, mass.... —Protoflight vs Prototype + Flight metering structures —Detailed test & acceptance sequence gravity unloading scheme full aperture vs partial aperture during thermal-vacuum testing?

Telescope: Overall Risk Assessment Mirror fab/test risks —Far less demanding than HST: we are NIR not NUV —yet -- need comprehensive test plan. Mechanical structural risks —comprehensive test plan: static, dynamic, etc Thermal and mechanical disturbance issues —“Easy” thermal environment: HEO has few eclipses Schedule risks: OTA is a long lead item! Error budget: fixturing, optical test equipment, etc —Do we need a full-aperture reference test flat? Contamination control: materials & test plan Stray light control: management & test plan

Telescope: Main R&D Issues Critical path: telescope is a long lead item. —how big is our slack? Need to begin development of the OTA requirements document for potential bidders —Need to refine performance specifications —Need to understand & communicate tolerances —Need to prepare draft Interface Control Documents optical thermal mechanical electrical —Need to assess risks and take steps to minimize them —Need to perform trade studies (outlined above)

Telescope: R&D Phase Deliverables Telescope Requirements Specification Document —include manufacturing tolerance; alignment specifications Subcontractors’ Final Reports Metering Structure Concept Trades Telescope Mirror Materials Trade Study OTA Thermal Model and Results Summary Focussing/Alignment Tolerance Analysis Focussing/Alignment Mechanism Trade Study Front Aperture Door: Trade Study Integration Flow and Test Plan Preliminary Stray Light Analysis Shutter Mechanism Reliability & Failure Modes Study Telescope acquisition plan: schedule/milestones, cost.

Telescope Acquisition Plan Potential Vendors Identified —Ball Aerospace Systems Division (Boulder) —Boeing-SVS (Albuquerque/Boulder) —Brashear LP (Pittsburgh) —Composite Optics Inc (San Diego) —Corning Glass Works (Corning NY) —Eastman Kodak (Rochester) —Goodrich (Danbury) —Lockheed-Martin Missiles & Space Co (Sunnyvale) —SAGEM/REOSC (Paris) These vendors have been briefed on SNAP mission Each has responded to our Request for Information Identify a route (materials, fabrication, test, integration, test) —Milestones with appropriate incentives —Visibility into contractor(s) activities

Telescope: R&D Schedule Zero-order Design Report1 Aug 2003 Draft Requirements Review1 Aug 2003 Long Lead Procurement Budget Request1 Oct 2003 Systems Engineering Management Plan1 Feb 2004 Performance Assurance Implementation Draft1 Feb 2004 Risk Management Plan1 Feb 2004 OTA Study RFP1 Feb 2004 OTA Study Contract in place1 Apr 2004 Preliminary Project Execution Plan1 May 2004 Preliminary Hazards Analysis1 May 2004 Systems Requirements Review1 May 2004 Conceptual Design Report1 Aug 2004

Telescope: R&D Phase Manpower U.C.B. SSL Personnel -- TelescopeFY03FY04FTE M.Lampton, SSL Team Lead D.Pankow, SSLMech/Therm Lead M.Sholl, SSLOptics Lead R.Pratt, SSLMech Design H.Heetderks, SSLSystems(SE)(SE) In addition -- we make use of varying amounts of support from LBNL engineering personnel.

Telescope: R&D Phase Contracts Contracts -- TelescopeFY03FY04FTE Krim Consulting Boeing-SVS Corning Breault Research Organization-0-0.1

Telescope: R&D Phase Management Management objective: biddable Requirements Document that reflects all science requirements and trades Experienced team has been assembled Have begun dialogs with prospective vendors Have begun examining potential fab/test flows No need for high-risk “advanced” materials or processes Emphasize proven manufacturing & test techniques We plan on selection of contractor(s) with sufficient experience to bring successful delivery cost & schedule This contractor mix defines the overall acquisition plan

Telescope: CDR Preparations Plan Fully complete and document all trade studies Supplement these with industry commentary Use system-engineering “budgets” to identify optimum allocation of tolerances & resources Identify materials and fabrication alternatives taking into account schedule risk and overall cost Detail the acquisition plan and milestones Prepare acceptance test plan, including flight qual tests: —Structural stability, thermal, stiffness, normal modes, creep —Alignment and focussing plan —Thermal vacuum and optical stability —Stray light —Gravity unloading plan —Full-aperture and limited-aperture test opportunities —Facilities needed, facilities available

Telescope: Summary Pre-R&D —converted science drivers into telescope requirements —reviewed existing optical telescope concepts —developed annular-field TMA configuration —preliminary materials assessment —begun to explore vendor capabilities —started a budget for image quality R&D Phase —engineering trade studies and “budgets” —manufacturing process risk assessments —test plans and associated cost/risk trades facilities; equipment —prepare the acquisition plan —performance specifications & tolerance analysis —create draft ICDs —develop preliminary cost & schedule ranges