HCAL1 Status 2003 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance 2003 General design High Voltage system LED monitoring 2. Tests in muon halo beam.

Slides:



Advertisements
Similar presentations
Data analysis BTF 23 e 24 mag 05 T1 T2 500MeV electrons Repetition Rate 50 Hz Pulse Duration 1-10 ns Current/pulse 1 to 8 particles σ XY ~2mm Max Electronic.
Advertisements

Measuring Cosmic Ray Flux with a trigger and CAMAC readout - Page 1 Connect the Fluke 415 HV supply output to the input of the voltage distribution box.
Electromagnetic shower in the AHCAL selection criteria data / MonteCarlo comparison of: handling linearity shower shapes CALICE collaboration meeting may.
Y. Karadzhov MICE MICO First EMR Plots 1.EMR detector has been successfully incorporated in the MICE DAQ system. 2.First 3 days of data taking in MICE.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
The PSD upgrade performance Front-End-Electronics MAPD HV system Temperature stabilization MAPD gain monitoring system Slow control Readout –present and.
N. Anfimov (JINR) on behalf of the ECAL0 team.  Introduction  Installation and commissioning  Calibration  Data taking  Preliminary result  Plans.
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
Tests with JT0623 & JT0947 at Indiana University Nagoya PMT database test results for JT0623 at 3220V: This tube has somewhat higher than usual gain. 5×10.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
PSD upgrade: Ar-present and Xe-future 1.- Status of the PSD upgrade 2.- PSD performance after upgrade 3.- Problems during the Ar-run 4.- Future scenarios.
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
1 N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Operation and performance of the NESTOR test detector.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
Analysis of Endstation A setup Josef Uher. Quartz bar Start counter.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
1. DESY tests 2. Electronics developments 3. Optical developments 4. Outlook Casablanca J. Cvach, CALICE Coll. meeting.
“End station A setup” data analysis Josef Uher. Outline Introduction to setup and analysis Quartz bar start counter MA and MCP PMT in the prototype.
ANL, MAR-2014Ivo Polák, FZU, Prague1 Activity on Compass 2 detector with Calibration at Prague Ivo Polák, on behalf of Prague’s group Compass.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.
Calibration of the CMS Electromagnetic Calorimeter with first LHC data
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
KEN, JERI FU JEN CATHOLIC UNIVERSITY 2008/DEC./11 1 Testing Status of P.P. & APD.
Status of photon sensor study at Niigata University -- SiPM and MPPC -- Photon sensor mini workshop 05/9/16 University Niigata University.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Production PMT Testing and Work on Site with Prototype Tank University of California, Los Angles Department of Physics and Astronomy
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
Test of Electromagnetic Calorimeter modules for HADES, Mainz Sep.2009 A.Krása, F. Křížek, J. Pietraszko, Y. Sobolev, J. Stanislav, A. Reshetin, P. Tlustý.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
1 Overview of the HCAL LED monitoring PRR note CALO meeting Anatoli Konoplyannikov ABSTRACT In this note the design and integration of the LED.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
2007 detectors study at CERN 1.SiPM time resolution 2.MAPD S60 3.Blue sensitive MAPD 4.New 16ch board 5.New HV.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
A.Olchevski, JINR (Dubna) Test Beam studiesof COMPASS ECAL0 Test Beam studies of COMPASS ECAL0 module prototype with MAPD readout ECAL0 Team, JINR, DUBNA.
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
Calibration issues for the CALICE 1m3 AHCAL ALCPG11 - Linear Collider Workshop of the Americas Eugene, Oregon, USA 2011/3/22 Jaroslav Zalesak Institute.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Development of a pad interpolation algorithm using charge-sharing.
CALICE, CERN June 29, 2004J. Zálešák, APDs for tileHCAL1 APDs for tileHCAL MiniCal studies with APDs in e-test beam J. Zálešák, Prague with different preamplifiers.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
ILC-CAL Test status of HPK photon sensors Kobe-U Y.Tamura / K.Kawagoe Confidential: do not distribute outside.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
Authors: Dmitrii Pereima, ITEP; Dmitry Golubkov, ITEP; Iouri Gouz, IHEP; Victor Egorychev, ITEP. Visualization of HCAL 137 Cs calibration data 1 CALO +
1 Methods of PSD energy calibration. 2 Dependence of energy resolution on many factors Constant term is essential only for energy measurement of single.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
COMPASS calorimeters S. Platchkov IRFU, CEA-Saclay GDR, 8-9 avril 2008
PreShower Characterisations
EZDC spectra reconstruction and calibration
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Oleg Gavrishchuk, JINR, Dubna
CMS ECAL Calibration and Test Beam Results
Instrumentation for Colliding Beam Physics 2017
BESIII EMC electronics
Calorimeter calibrations with Flight Software.
Presentation transcript:

HCAL1 Status 2003 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance 2003 General design High Voltage system LED monitoring 2. Tests in muon halo beam (June 2003) 3. On-line reference plots 4. On-line LED monitoring plots 5. End of Run muon test (September 2003) 6. Stability control 7. Conclusions

Lisbon, September 1-3, 2003 O.Gavrishchuk, COMPASS Collaboration Meeting 2 HCAL1 general view in frame Matrix setup of 28v20 cells 480 cells 150x150mm**2 Total size: 4200x3000mm**2 Window size: 1200x600mm**2 (8x4 cells) Total Weight: 83 tonn Moving range: +/-2.5m HCAL1 Status 2003

Lisbon, September 1-3, 2003 O.Gavrishchuk, COMPASS Collaboration Meeting 3 High Voltage layout H/V interface is controlled by pccofe m flat cable (50 pairs) transfer the commands from H/V interface to receiver in the CAMAC crate Receiver distribute the commands to 7 Data and 1-Chip-select boards Power suppliers: +100V DC, load current 140mA per 480 PM +6V DC, load current 8A (6A for 480 PM) -6V DC, load current 3A HCAL1 Status 2003

Lisbon, September 1-3, 2003 O.Gavrishchuk, COMPASS Collaboration Meeting 4 LED monitoring layout Blue LED (470nm) high (ultra bright) luminosity used for 480 HCAL1 Photo- multipliers PM-84 Light intensity controlled by avalanche PIN diode Led generator pulsed out of Spill with frequency selected before start of Run HCAL1 Status 2003

Lisbon, September 1-3, 2003 O.Gavrishchuk, COMPASS Collaboration Meeting 5 Muon tests HCAL1 was tested in muon halo beam with VO1 trigger in. Calorimeter was moved left and right on 1.5m to obtain statistics in edges. Total statistic is equal about 3millons events (500 spills) HCAL1 cells were adjusted: muon peak should be in 58 ADC channel 3.Total muon HCAL1 spectra is feted to Mean=57.6 ADC ch. 4.Statistics X-Y distribution is shown on bi-plot. HCAL1 Status 2003

Lisbon, September 1-3, 2003 O.Gavrishchuk, COMPASS Collaboration Meeting 6 HCAL1 Status 2003 Muon HCAL1 cells spectra, column 19, row from 0 to

Lisbon, September 1-3, 2003 O.Gavrishchuk, COMPASS Collaboration Meeting 7 ON-Line Reference Plots: 1.Hits distribution. 2.Amplitude vs channels. 3.Amplitude distribution. 4.Noise distribution 5.All events hits histogram 6.Frequency vs HCAL1 560 channels (matrix 28x20) 7.Total HCAL1 amplitude 8.Hits for events with amplitude cut of 20 ADC channels. HCAL1 Status 2003

Lisbon, September 1-3, 2003 O.Gavrishchuk, COMPASS Collaboration Meeting 8 LED reference plots. 1.Sum HCAL1 Led amplitude histogram 2.Pin Diode amplitude histogram 3.LED amplitude vs HCAL1 560 channels (matrix 28x20) 4.X-Y amplitude be- plot HCAL1 Status 2003 Ampl. VS N_chann Sum_LED Pin Diode_amp

Lisbon, September 1-3, 2003 O.Gavrishchuk, COMPASS Collaboration Meeting 9 Muon tests Total muon ADC spectra in ADC channels (Mean=53.6) 2.Total muon spectra in Energy scale. Mean=1.68GeV 3.Individual ADC spectra for cell: X=18, Y=8 4. Statistics distribution, X-Y plot HCAL1 Status 2003

Lisbon, September 1-3, 2003 O.Gavrishchuk, COMPASS Collaboration Meeting 10 HCAL1 Status 2003 Muon HCAL1 cells spectra, column 19, row from 0 to

Lisbon, September 1-3, 2003 O.Gavrishchuk, COMPASS Collaboration Meeting 11 Muon HCAL1 cells spectra, column 19, row from 0 to 19. Measurement of HCAL1 Status 2003

Lisbon, September 1-3, 2003 O.Gavrishchuk, COMPASS Collaboration Meeting 12 LED amplitude behavior in data taking periods P1A_P1H 1.Pin diode amplitude 2.HCAL1 corrected on PIN 3.HCAL1 LED with-out PIN corrections LED monitoring system indicate: 1.HCAL1 amplitude decrease on 8% from P1A to P1H data taking periods. 2.HCAL1 amplitude is practically stable HCAL1 Status 2003

Lisbon, September 1-3, 2003 O.Gavrishchuk, COMPASS Collaboration Meeting 13 Start of Run 2003: Mean A=57.6 End of Run 2003 Mean A=53.6 CONCLUSIONS: 1.HCAL1 signals are rather stable from June 02 to September 21 2.It is difference about 7% in total HCAL1 amplitude from Start and End of Run 3.It is in agreement with LED monitoring behavior. 4.HCAL1 energy calibration can be corrected according to LED monitoring references. HCAL1 Status 2003