An outline of the GTS & the Improved MTN project for FWIS By Hiroyuki Ichijo Japan Meteorological Agency ISS/ITT-FWIS 2003 (Kuala Lumpur, 20-24 October.

Slides:



Advertisements
Similar presentations
WMO Information System (WIS)
Advertisements

1 UNIT I (Contd..) High-Speed LANs. 2 Introduction Fast Ethernet and Gigabit Ethernet Fast Ethernet and Gigabit Ethernet Fibre Channel Fibre Channel High-speed.
RMDCN Technical Solution
Background on the RMDCN
Status of Implementation at RTH Tokyo By Hiroyuki Ichijo Contents Contents 1. GTS facilities 2. GTS circuits 3. Use of the Internet 4. Collection of SHIP.
Slide 1 ET-CTS - GISC Network Bandwidth RequirementsSlide 1 GISC network bandwidth requirements A proposed method for an educated guess… Hiroyuki Ichijo.
STATUS AND UPGRADATION PLAN OF RTH NEW DELHI AND TELECOMMUNICATION NETWORK OF IMD N.K.Pangasa Director RTH New Delhi.
RMDCN-TT report Matteo Dell’Acqua Meteo-France
(Future) WMO Information System FWIS -> WIS
1 Operational Meteorology for Natural Disaster Prevention and Mitigation Alexander Gusev Acting President of the WMO Commission for Basic Systems.
Lecture Note No.3 TRAINING SEMINAR ON INFORMATION AND COMMUNICATION TECHNOLOGY ON THE GTS ( Current Operational procedures of data exchange on the GTS.
RTH AND NMC FUNCTIONS FOR GTS INFORMATION EXCHANGE T.K.RAY RTH,NEW DELHI,INDIA E Training Seminar on information and communication.
© 2006 Cisco Systems, Inc. All rights reserved. MPLS v MPLS VPN Technology Introducing MPLS VPN Architecture.
IMTN and managed data network services Technical Conference on the WIS (Seoul, 6-8 November 2006) Hiroyuki ICHIJO (Japan Meteorological Agency.
© 2005 AT&T, All Rights Reserved. 11 July 2005 AT&T Enhanced VPN Services Performance Reporting and Web Tools Presenter : Sam Levine x111.
Progress Report from ET-CTS (Expert Team on WIS-GTS Communication Techniques and Structure) Doc. 4.3 (1) Presentation version ICG-WIS-6 (Seoul, February.
November 2006 TECO-WIS, Seoul 1 Definition of the Internet Network of networks –millions of smaller domestic, academic, business, and government networks.
1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,
Current Status of Implementation of MTN at RTH Beijing Li Xiang National Meteorological Information Center, CMA.
Case Study of IMTN Network B with A ET-IMTN 2001 ( Geneva, June 20 to 23, 2001) By Hiroyuki Ichijo Office of International Communications,JMA.
1 World Meteorological Organization WMO Information System WORLD METEOROLOGICAL ORGANIZATION Weather – Climate - Water J.-M. Rainer, Chief ISS Division.
Managing & Moving Weather, Water and Climate Information in the 21 st Century WMO Information System (WIS) 4 th WCRP Observations and Assimilation Panel.
TDC 461: Wide Area Network Services DePaul University 22 May, 2001.
Lecture slides prepared for “Business Data Communications”, 7/e, by William Stallings and Tom Case, Chapter 8 “TCP/IP”.
Lecture Note No.5 TRAINING SEMINAR ON INFORMATION AND COMMUNICATION TECHNOLOGY FOR THE GTS (((( Improved RMTN/RMDCN for RAII The IMTN (Improved MTN) The.
WMO Information System WORLD METEOROLOGICAL ORGANIZATION Weather – Climate - Water Dieter C. Schiessl Director, WWW Department WMO Tel:
Overview of the Improved MTN project Geoff Molloy Communications and Computing Branch Bureau of Meteorology Australia.
Report on the Improved RMTN project Contents 1. Background 2. Status of progress of the improved RMTN 2.1 Implementation of circuits 2.2 Migration to TCP/IP.
CMA’s new GTS system Submitted by YANG Genlu, China
CMA’s Network and HPC environment Tian Hao NMC, CMA Aug. 27, 2003 Busan.
Future WMO Information System (FWIS) Hiroyuki Ichijo (Japan Meteorological Agency) WMO/WSIS Session on Reducing Natural Disaster Risk through Technical.
1 World Meteorological Organization AR report to ADC May 2008 Presented by David Thomas (WMO) WORLD METEOROLOGICAL ORGANIZATION Weather – Climate.
1 World Meteorological Organization AR report to ADC September 2008 Presented by Don Middleton (NCAR), on behalf of WIS and Dave Thomas, Jean-Michel.
The WMO Information System (WIS)
Outlines Received due 13 March %. Homework n Review for Midterm (1 March 2000) n Research Paper n Readings [9] “MPLS: Special Delivery” [10] “Diversifying.
Gianni,José Luis. COUNTRYCITYCIRCUIT TYPESPEEDTRANSFER PROTOCOL EXCHAN GE DATA REMARKS USA Washington (WMC) Leased Line 64K TCP/IP SOCKETS A/N,GRIB T4.
Status of the Global Telecommunication System connected with RTH Tokyo Japan Meteorological Agency Presented by Masahiro Kazumori Eighth Meeting on Asia-Pacific.
Joint ICM GTS-WIS MTN & ET-OI Sep Joint ICM on the GTS-WIS MTN and ET-OI meeting Kelvin Wong CBS ET – OI Co-chair RTH Focal Point WMC Melbourne.
Features of the new TCP/IP link between HK and Beijing (Guangzhou) Features of the new TCP/IP link between HK and Beijing (Guangzhou) Justin Waiman MA.
Status on RTH Tokyo (Item 2.1) By Hiroyuki Ichijo By Hiroyuki Ichijo Expert Meeting on the Exchange of Early Warning and Related Information Including.
STATUS OF IMPLEMENTATION AT RTH BEIJING SHI Peiliang, China
Status of the Global Telecommunication System connected with RTH Tokyo Sixth Meeting on Asia-Pacific Satellite Data Exchange and Utilization (APSDEU-6)
MD RMDCN within RA VI – status and perspectives CBS/ET-IMTN, June 2001 RMDCN within RA VI - status and perspectives - Matteo Dell’Acqua ECMWF.
STATUS OF RTH MOSCOW (Submitted by Expert (Russian Federation)) ________________________________________________________________ Summary and Purpose of.
WIS data-communications functions and services, and implementation Progress report on Expert Team on WIS-GTS Communication Techniques and Structure (ET-CTS)
Training Seminar on ICT for GTS (Bangkok, September 2002) - Slide 1 Organisation principles of the GTS.
1 Development of GTS and Data Exchange in China National Meteorological Information Center, CMA.
Lecture Note No. 1 TRAINING SEMINAR ON INFORMATION AND COMMUNICATION TECHNOLOGY ON THE GTS T.K.RAY RTH NEW DELHI, INDIA E mail :
Status of RTH Tokyo Japan Meteorological Agency Presented by Tatsuya Noyori Expert Team on WIS-GTS Communication Techniques and Structure (TOULOUSE, France,
Status of RTH Tokyo Japan Meteorological Agency Presented by Kenji Tsunoda Joint implementation-coordination meeting on the GTS-WIS MTN and meeting of.
Status of Implementation TCP/IP at RTH Beijing NMIC, CMA.
RTH Moscow 1 STATUS OF RTH MOSCOW (Submitted by Expert Russian Federation) ________________________________________________________________ Summary and.
Theme Leader WMO-WIS / Director PMD
Status of GISC Tokyo GISC Tokyo / JMA.
GISC Tehran Status Feb, 2016 TT-GISC 2016-Doc18.
Automation of NMCs for GTS operation
WIS Implementation Status in RA II
Regional Meteorological Telecommunication Network for Region II (Asia)
Outcome of the ET-CTS Meeting (Toulouse, May 2008)
WIS data-communication structure Outcome of study by ET-CTS (Expert Team on WIS-GTS Communication Techniques and Structure) Please consider our Earth.
Review of the current status of implementation of TCP/IP procedures and applications at GISC Beijing ET-CTS, Dakar, 5-8 April 2016.
Regional Training Seminar on GTS Techniques and Procedures
Peak speed through Internet
Status Report of GISC Tokyo
WIS overview Submitted by: Secretariat (Doc 02b)
Status of Implementation at RTH Tokyo
Outcome of the ET-CTS Meeting (Toulouse, May 2008)
MeteoFranceMPLS via Toulouse
Status of RA II WIS Implementation Plan
GISC New Delhi Status Dr. S. L. Singh
Presentation transcript:

An outline of the GTS & the Improved MTN project for FWIS By Hiroyuki Ichijo Japan Meteorological Agency ISS/ITT-FWIS 2003 (Kuala Lumpur, October 2003)

1. Structure of the GTS (Global Telecommunication System) MTN = Core of the GTS managed by MTN centres in cooperation with WMO RMTN managed by each Regional Association National level network managed by each Member RTHs (Regional Telecommunication Hubs) NMTNs National Meteorological Telecommunication Networks NMTN RMTNs Regional Meteorological Telecommunication Networks RMTN in RA I RMTN in RA II RMTN in RA III RMTN in RA IV RMTN in RA V RMTN in RA VI MTN Main Telecommunication Network NMCs (National Meteorological Centres) Centre classification MTN Centres (RTHs on the MTN) NMC RTH

2. MTN configuration MTN (Main Telecommunication Network) consists of 18 MTN Centres and 24 connections. Region VI Region II Region IV Region I Region V Region III

3. Regional aspect : Region II case Current Status of RMTN in RA II (As of 10 September 2003) Regional plan: 78 circuits Implemented: 67 circuits Implementation rate : 86 % Vientiane Ulaanbaatar Baghdad Doha Kuwait Bahrain Dhaka Yangon Kathmandu Kabul Karachi Colombo Male Hanoi Phnom Penh PyongYang Ashgabad Macao 64K 14.4K Dushanbe Almaty NI Seoul NI K (V.34) 64K K V K 9.6K 4.8K 64K 128K 7.2K 9.6K 50 64K K 64K K Melbourne Offenbach Cairo Algiers Moscow Kuala Lumpur Tashkent Novosibirsk Khabarovsk Bangkok Frame Relay CIR Frame Relay CIR Melbourne Washington Frame Relay CIR NI K (V.34) Bishkek 64K 2.4K Singapore 9.6K K (V.34) Tehran Sanaa 200 Hong Kong Moscow NI Frame Relay CIR 64K Frame Relay CIR Tokyo Beijing Frame Relay CIR 200 New Delhi IMTN-MDCN CIR IMTN-MDCN CIR Manila IMTN-MDCN Frame Relay CIR K (V.34) via Moscow Internet K (V.34) Jeddah Internet Muscat Emirates NI Id V.34 64K Internet Washington Internet ISDN NI RTH in Region II NMC in Region II Centre in other region MTN circuit Regional circuit Interregional circuit Additional circuit Non-IP link IP link NI No implementation

19 Upgrade Plans of RMTN in RA II within 2 years Vientiane Ulaanbaatar Baghdad Doha Kuwait Bahrain Dhaka Yangon Kathmandu Kabul Karachi Colombo Male Hanoi Phnom Penh PyongYang Ashgabad Macao 64K Dushanbe Almaty NI Seoul NI 64K V.34 64K 9.6K 64K 128K 64K 50 64K K K K Melbourne Offenbach Cairo Algiers Moscow Kuala Lumpur Tashkent Novosibirsk Khabarovsk Bangkok Frame Relay CIR Frame Relay CIR Melbourne Washington Frame Relay CIR NI K (V.34) Plans of RMTN in RA II for Bishkek 64K Singapore 9.6K RTH in Region II NMC in Region II Centre in other region MTN circuit Regional circuit Interregional circuit Additional circuit Non-IP link IP link NI No implementation Tehran Sanaa Hong Kong Moscow NI Frame Relay CIR IMTN-MDCN CIR Tokyo Beijing Frame Relay CIR 200 New Delhi IMTN-MDCN CIR Manila IMTN-MDCN CIR (V.34) via Moscow IMTN-MDCN CIR IMTN-MDCN CIR 64K Frame Relay CIR 64K (V.34) Internet Jeddah Muscat Emirates Internet V K 64K V.34 Internet 64K V.34 Internet 64K Internet Washington Internet ISDN IMTN-MDCN

Progress of improvement in circuit speed in RA II The number of circuits Low speed circuits are still more than half. It is a problem.

Achievement rate: about 35% ( as of August 2003) Estimation rate: about 55% by the end of 2005 Progress in migration to TCP/IP in RA II number of circuits

4. Strategies to improve the GTS Strengthen the overall GTS capabilities with cost-effectiveness and technical trends Migration to TCP/IP Use of cost-effective networks Strategies Leased circuits Legacy protocols Traditional GTS Improved GTS Internet like applications Saving implementation costs and human resources allowing latitude in selecting a network service Expanding bandwidth Flexible connectivity Saving recurrent cost

Layer separation concepts Message Switching Message Switching Server/client File transfer Application level Transport level Frame Relay IP-VPN Transmission protocol level Use of cost-effective networks Migration to TCP/IP Adding applications Legacy protocol TCP/IP

Office A Office B Network cloud Office C Network user Network supplier Establish a new connection between B and C Yes sir! We do everything in network management! Logical connectivity of managed data-communication network Expand the capacity between A and B

Example of the Improved GTS : East Asian triangles Beijing Tokyo Hong Kong Seoul 64kbps 9600bps 200bps Asynchronous X.25 Beijing Tokyo Hong Kong Seoul Frame Relay Network Frame Relay Network Upgrade items: 1) Migration to TCP/IP 2) Use of Frame Relay Network

Benefit of the Hong Kong-Tokyo upgrade Hong Kong Tokyo Before the upgrade After the upgradeBefore the upgradeAfter the upgrade HK$ 12,743HK$ 7,470212,560 yen165,020 yen Monthly running costs Cost saving ofHK$ 5,273 (about US$ 677) a month Cost saving of 47,540yen(about US$ 450 ) a month Transmission speed 200 bps 16 kbps (CIR) nearly 64 kbps (at a burst) 200 bps 16 kbps (CIR) nearly 64 kbps (at a burst) Holding transmission queues SometimesRarelyAlwaysRarely Transmission delay 50 sec. (average) 72 min. (maximum) 1 sec. (average) 20 sec. (maximum) 880 sec. (average) 130 min. (maximum) 6 sec. (average) 69 sec. (maximum) Performance Receiving condition Good but occasionally receiving garbled messages by bit- error Excellent Mostly good but sometimes receiving garbled messages by bit- error Excellent

5. Status on the Improved MTN (IMTN) The IMTN project is making satisfactory progress. The planned configuration will be achieved in 2004 except for a few MTN centres in Regions I and III. Bracknell Sofia Cloud II Melbourne Buenos Aires Tokyo Beijing New Delhi Nairobi Cairo Toulouse Dakar Algiers Moscow Washington Brasilia Offenbach Jeddah Prague Frame Relay Frame Relay by BT Ignite by BT Ignite Frame Relay Frame Relay by Equant by Equant Cloud I Cloud I

Specific characteristics of IMTN clouds Cloud I Frame Relay Melbourne Tokyo 1.5Mbps Washington 256kbps Bracknell 256kbps Access circuit 1.5Mbps 32kbps 16kbps CIR= 768kbps 32kbps 64kbps 32kbps PVC a)Flexibility of establishing logical connections (PVC) on an access circuit b)Asymmetric bandwidths (CIR: Committed Information Rate) c)Better performance than CIR with minimum delay (Turnaround time by SLA)

Unbalanced traffic with Asymmetric CIRs 384kbps line (Half of CIR)

Traffic status on the GTS (Example of daily volume received at RTH Tokyo) Data From Washington (CIR=768kbps) From Melbourne (CIR=32kbps) From other GTS circuits WWW data and products in message type AN43Mbytes3Mbytes4Mbytes Binary84Mbytes6Mbytes2Mbytes T4 fax2Mbytes1Mbytes Large satellite dataFile1063Mbytes15Mbytes--- Total1192Mbytes25Mbytes7Mbytes Utilisation rate on the CIR basis [on practical basis] 14.4% [11%] 7.2% [3%]

6. Prospect of IMTN evolution for FWIS Transition environment for pilot tests and parallel operations Option 1) coexistence of test connections with GTS operational connections on a PVC Easy way but sharing CIR bandwidth of a PVC

Option 2) Separation of PVCs for GTS operational and test Minimum impact to GTS operation but additional PVC cost

Possible evolution into IP-VPN One of VPN services is IP-VPN which is different in backbone management from Internet VPN. Providers PEs and Core Routers based on MPLS have Label Tables and switch IP packets forward according to the Tables. CE : Customer Edge RouterVPN : Virtual Private Network PE : Provider Edge RouterMPLS : Multi Protocol Label Switching Closed IP network by a provider CE PE CE PE CE IP IP Label Core Router PE IP VPN group VPN group IP-VPN with MPLS

IPsec VPN products add/remove the ESP for encryption and encapsulation and the AH for authentication to/from an IP packet. ESP : Encapsulation Secure Payload AH : Authentication Header Internet IPsec Product ESP AH IP VPN group IPsec Product IP ESP AH IP IP IPsec Product Internet VPN with IPsec

7. Administrative aspect of the improved MTN Traditional method : bilateral contract/billing Frame Relay Network X Frame Relay Network Y NNI

Collaborative method : one-stop concept & multi-end billing

Tentative conclusions The IMTN can become a core transport network linking GISCs together. In 2006, if a GISC will have connections of 1 – 1.5Mbps with other GISCs, expected recurrent monthly cost for the GISC could be US$ 5000 x ((a number of GISCs) - 1). The IMTN can provide the environment for a test-bed and parallel operations In transition periods. The IMTN seems to be available for connections among GISCs, DCPCs and NCs as long as the administrative hurdles could be cleared.