Winter 2011/2012 shutdown On-call service - FSU Future projects AOB 2011-12-02G. Olesen - PH-DT-DI.

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

André Augustinus 16 June 2003 DCS Workshop Safety.
DCal Meeting
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
General Computer Science for Engineers CISC 106 James Atlas Computer and Information Sciences 10/21/2009.
EE496A Senior Design Project I Dr. Jane Dong Electrical and Computer Engineering.
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
PH/DT MCP & MNO Xavier Pons on behalf of MCP team – 25/03/2013.
PH/DT MCP & MNO NEW MAGNET SAFETY SYSTEM HARDWARE Sylvain Ravat PH-DT Xavier Pons PH-DT.
LHC’s Second Run Hyunseok Lee 1. 2 ■ Discovery of the Higgs particle.
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
Muon Piquet Training. Intro - Disclaimer  This presentation is not intended to be a complete description of the system but a guide, possibly simple,
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
ATLAS-CMS Batteries ATLAS - - 2x MSS battery banks + 2x Quench Heater banks - - MSS systems OK (6 hrs minimum) - - HEC batteries promised for week 25,
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
Vacuum Controls Status MACS week December 2010 PP a-JWA-VacControlStatus.ppt Joachim Wallner 1.
Chapter 1 The Product. 2 Product  What is it?  Who does it?  Why is it important?  How to ensure it be done right?
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Mats Lindroos ISOLDE Technical report INTC 14/2/2007 Mats Lindroos.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
GIF++ Control System (GCS) Gilles MAIRE PH-DT-DI1.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
10 th of April 2003 ATLAS “MSS Specification” Magnet Safety Systems – Magnet Common Project E. Sbrissa, G. Olesen – CERN/EP 5 Tests 5.1 Pre-production.
October 4-5, Status of ARRA funded AIPs Stochastic Cooling Alex Zaltsman October 4, 2010 Stochastic Cooling cost and schedule.
Infrastructure availability and Hardware changes Slides prepared by Niko Neufeld Presented by Rainer Schwemmer for the Online administrators.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
Atlas Gas Systems - CPC6 Upgrade and Re-Commissioning Infrastructure Meeting – 8th January 2014 Steve Pavis PH-DT-DI/Gas.
Pigi Paolucci & Anna Colaleo – RPC project 2012 RPC M&OB scrutiny Anna Colaleo (INFN-Bari) RM Pierluigi Paolucci (INFN-NA) PM 1.
Maintenance Management Project EN Dept. Implementation Project Mario Batz EN-CV Maintenance Management Workshop 25 th November 2011 EDMS EDMS
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
General News DT Buildings New Tasks - Projects Other items G. Olesen - PH-DT-DI.
MCP Status Magnet Control Project - MCP Common systems: MCS – Magnet Control System – S. Ravat MDS – Magnet Diagnostics System – S. Ravat MSS – Magnet.
PH-DT FLUIDIC SYSTEM 1 ST SECTION MEETING 19 NOVEMBER 2015.
25/04/2014R. Guida, A. Wasem PH-DT-DI Gas1 Outline ALICE gas systems meeting Outline Introduction Review usage of ALICE gas M&O 2013 Review achievements.
25/03/2014P. Carrie, R. Guida, S. Pavis PH-DT-DI Gas1 Outline LHCb gas systems meeting Outline Introduction Review usage of LHCb gas M&O 2013 Review achievements.
Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D
PHENIX WEEKLY PLANNING 10/26/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
E.Sbrissa EP/TA3 - IC ATLAS EDR_MAG Magnet Project Fault analysis, QA & Failure rate.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
PIP Update July 29 th Agenda Summary Update – Current Activities – Updates Tom Kubicki (Station 20,21,22 – Gallery and Equipment Work) – Additional.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
WA105, SC Collaboration Meeting, CERN, 07th March 2016 AIMARD B., LAPP BALIK G., LAPP BOURGEOIS N., CERN BRUNETTI L., LAPP CANTINI C., ETHz MURPHY S.,
Time to resolve Design Issues 1. Disclamer Due to the engineering meeting last week I have not had time to coordinate this material with Tim or the L3.
Thursday November 19 th, 15:00 Hrs, room 155-R-047 Agenda An introduction to the Project Office.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Work Package 1: Pixel detector systems for particle.
Section Meeting News and MARS 22/01/ FH1. General Activity and Staff Organigram for the DI Section 22/01/ FH2 TF+GlassAndre Braem Thomas Schneider.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
22/09/2011 ADO-PO section meeting ADO : Atlas Detector Operation PO : Project Office R. Vuillermet.
PERSONAL SAFETY INTERLOCKS External EHS Expert Panel Workshop
CERN PH-DT Physics Department (PH) Detector Technologies (DT)
Status of the Mechanics at Ciemat.
PLC-based control systems at SOLEIL - ICALEPCS 2017
Martyn Davenport 2nd December 2005
IEEE Std 1074: Standard for Software Lifecycle
DT Magnet Activities Overview FH 25/06/2010 -FH.

Two-beam Test-stand Design and Construction Status
Onsite Training at JLab
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Presentation transcript:

Winter 2011/2012 shutdown On-call service - FSU Future projects AOB G. Olesen - PH-DT-DI

Normal MCP maintenance No major changes foreseen Standard verifications according to internal list MCS: Upgrade of PVSS MSS: Battery maintenance done by MCP-FSU (training November) Change of MSSB optocouplers (MTBF – 6000 pcs ordered!) Verification of alarm levels - Functionality MDS New software/hardware if possible Vacuum system Demounting of diffusion pumps for End-Cap opening (detector repair) Maintenance – oil change – etc. Shutdown planning (also FSU) G. Olesen - PH-DT-DI

Systems On-call Service - SOS Running during shutdown New ATLAS member Training has started (Team – Nicolas Bourgeois) Doing double piquet service FSU – PH persons in unit 1 extra person from now until end of shutdown Perhaps 1 engineer for electronics pool Many external projects Flexibility works Shutdown planning meet week G. Olesen - PH-DT-DI

MSS2 Slightly delayed due to involvement in other projects Software being programmed and tested Hardware Chassis mounted Interface cards being developed (production time?) Many details still remains Progress meet: Week G. Olesen - PH-DT-DI

M1 Oldest supraconducting magnet at CERN Large aperture 3 Tesla Control – Safety by PH-DT-DI MSS2 prototype testing – validation Project leader MCP: Sylvain Ravat Hardware: Pascal Blanc Planning - budget meet: Week G. Olesen - PH-DT-DI

Any Other Business: Battery Course (Nico, Laurent, Gerard, Houari) AEgIS? ArDM? Compass? And… G. Olesen - PH-DT-DI

PH-DT-DI Xmas drink Apero party Friday 9/12 – 11:30 Contributions: Funds – PH-DT-DI Project Leaders Food – Drinks (Mar) Location: MCP workshop in B20/21/168 Music – Christmas Songs (Gert) – Laptop (Mar) – Speakers? Decoration Background slides – Projector - Wall Volunteers… M.C.7