Phoenix Convention Center Phoenix, Arizona Life-Cycle Cost for Budget Prioritization Agency Energy ManagerLife-Cycle Cost Methodology Patricia Donohue,

Slides:



Advertisements
Similar presentations
Federal Reserve Bank of Boston Case Study
Advertisements

Restaurants Can Take a Bite Out of Energy Costs a.
E2=P2 Add Energy Efficiency to your P2 Toolbox Peter Crawford Vermont Small Business Development Center Vermont Small Business Development Center Regulatory.
ENERGY SAVING Product Offering COMPRESSOR MARKETING OPPORTUNITIES.
Save Energy and Money PNM Energy Efficiency Programs
1 LIGHTING. 2 LIGHTING 30% better-than-code is incredibly easy for lighting – the standards are lagging the industry revolution.
Emerging Lighting Technologies Roundup
Innovative Tools for Energy Savings T. Allbaugh, P.E., S. J. Kang, Ph.D., P.E., K. Williams, P.E., W. Kramer, P.E., G. Jones, P.E., K. P. Olmstead, Ph.D.,
CERT UPDATE TO GUILFORD COUNTY ENERGY AUDITS OF BELLE MEADE BUILDING BB&T BUILDING HIGH POINT COURTHOUSE & DETENTION CENTER HIGH POINT PUBLIC HEALTH BUILDING.
Sustainability in Waupun Continuing the goal of 25% renewable energy by 2025 Renee Henning 2012 Wisconsin Sustainability Intern Program.
Fall 2009 Workshop Level 1 Energy Audits - Energy Use Analysis - - Walk Through Analysis - Mr. Matt O’Brien, AIA, LEED AP November 17, 2009.
King Fahd University of Petroleum and Minerals Mechanical Engineering Department Presented by Mohammad A. Al-Muaigel /10/2004 National Energy.
Energy Savings Opportunities in Controls, Lighting, Air Conditioning, Water Heating and Refrigeration Chuck Thomas, P.E. CEM Lead Engineer.
UTPA Energy Conservation Initiatives Oscar Villarreal Director, Facilities Management David Ortega Assistant Director, Energy Manager.
ENERGY CONSUMPTION: MANZANITA HALL ENERGY UPGRADES BEN COHNDANNY GARNETT AUSTIN FROGGEPAUL SAIGEON MATT DUNCAN.
T OPPORTUNITIES FOR ENERGY EFFICIENCY AT TRIBAL GAMING FACILITIES.
Denver Place North & South Towers Case Study Matt Urquhart Amerimar Realty Management Company Jack Wolpert E-Cube, Incorporated.
How to Hit a Homerun Saving Energy and Updating Facilities Presented by Shirley McNutt.
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Franklin County Technical School Performance Contract Project.
Toward a Sustainable Campus. Outline A. Global Sustainability Movement in Higher Education B. Resources C. What can be done? D. “Toward a Sustainable.
Performance Contracting The Honeywell One Source Solution.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
1 Progress Toward Sustainability at Williams College.
Using Energy Efficiency to Increase Your Bottom Line
Who Says Energy Efficiency Can’t be Sexy? About Us Energy + Environment  Since 1999  Decades of experience in energy efficiency  We create jobs, lower.
Energy Conservation Western North Carolina Recycler’s Networking Council Black Mountain, North Carolina December 9, 2004 Keyes McGee, E.I. North Carolina.
Green Building Demonstration Project Adam Saling City of San Diego.
Lawrence Livermore National Laboratory Building 111 Mike Holda Lawrence Berkeley National Laboratory (510) or (209) ,
Phoenix Convention Center Phoenix, Arizona Getting Results From Your Energy Projects Session 3Greening the Federal Government Jim Bochat Commissioning.
Phoenix Convention Center Phoenix, Arizona Using Private Financing to Maximize Energy and Cost Savings Track 5: Project Financing Session 7: Economics.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Phoenix Convention Center Phoenix, Arizona Keys to Energy Behavior Change Solution Showcase Retained Energy Savings: Putting It into Practice Mike Van.
Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.
Phoenix Convention Center Phoenix, Arizona Evolution of Energy Services Integrated Energy TrackIntegration of the Energy Industry Nicole Bulgarino Ameresco.
Problem Statement Due to a rough history with the local power company, San Pablo has resorted to using power from the power company without paying their.
Phoenix Convention Center Phoenix, Arizona Lessons Learned from ARRA Projects Solution ShowcaseLessions Learned from ARRA Projects Walter Tersch, LEED.
Name of Building(s) or Project Speaker(s) Organization(s)
International Newspaper Group 2008 Gannett’s Green Campaign.
Marriott Corporate Headquarters
Meeting the 10% Conservation Goal Jennifer L. Gorter, PE, CEM Fairfax County Government Facilities Management Department (FMD) April 11, 2008.
Phoenix Convention Center Phoenix, Arizona Integrative Design: Deep Energy Approach Track 6: Integrated Energy Session 5: Integration of the Energy Industry.
Phoenix Convention Center Phoenix, Arizona Facility Energy Audits Mike Gutowski Johnson Controls August 12, 2015 Agency Energy ManagerEnergy Audits: Implementing.
10 Turn off Lights Not in Use Motion Sensors simple ways to go green
1 Drivers for Building Life Cycle Integrations Jim Sinopoli.
Leading by Example Philip Gates, CEM, CMVP, EIT Energy Manager 1.
Phoenix Convention Center Phoenix, Arizona Life-Cycle Cost Analysis for large projects Agency Energy ManagerLife-Cycle Cost Methodology Jeanette Fiess,
Phoenix Convention Center Phoenix, Arizona ESPC Overview Project FinancingESPC Large and Small: The Basics of ESPC Tom Hattery, DOE-FEMP Federal Project.
EXPLORING ENERGY MANAGEMENT. PROJECT TITLE What is Energy Management? Energy management is doing more with the same amount of energy or less energy. Energy.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
01/15/16Prop 39 Update - Maintenance & Operations - Sustainability Initiatives Unit1 CALIFORNIA CLEAN ENERGY JOBS ACT LAUSD PROPOSITION 39 ENERGY EFFICIENCY.
Lack of dedicated building meter – Solution: Estimate square footage of Herberger in relation to total area serviced by meter – Estimate 12% of total.
Lighting Beyond the Bulb LED Lighting and Lighting Management Solutions Todd Smith
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Incorporating Energy Conservation Strategies into University Research.
Lighting facts.  Lighting can be a big energy consumer in offices and production areas and experience shows that energy savings may be achieved - often.
Commercial Energy Assessments City of Ames Emily Rice The Energy Group.
The Energy Efficiency and Solar Nexus:
Robert Greenwald, P.Eng, MBA February 26, 2004
Fort Stanwix National Monument Energy Audit Contract
Energy Savings Performance Contracts & Energy Service Companies
CAPE & OUR PPN HISTORY IN BUSINESS SINCE 1953, PPN MEMBER SINCE 2014
Energy Efficiency Saves Your Business Money
Regional Sales Manager
State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
Exploring Energy Management
2018 Retro-Commissioning (RCx) Program
Exploring Energy Management
County of Kane Facility Efficiency Improvements.
Presentation transcript:

Phoenix Convention Center Phoenix, Arizona Life-Cycle Cost for Budget Prioritization Agency Energy ManagerLife-Cycle Cost Methodology Patricia Donohue, P.E., PMP, CEM, CBCP, LEED AP US Army Corps of Engineers, North Atlantic Division August 12, 2015

Energy Exchange : Federal Sustainability for the Next Decade Agenda USACE Sustainable Project Budget process – Smaller projects form $3,000 to $300,000 Common challenges Best practices 2

Energy Exchange : Federal Sustainability for the Next Decade USACE LCCA for Energy Efficiency Implementation USACE has over 700 facilities that it needs to sustain, repair and maintain. Building types include: – Administration Offices – Dams with Recreation facilities (comfort stations and camps sites) – Marine facilities and maintenance shops for our navigation mission – Locks and dams and Canals – Warehouses – Industrial (dam in take tower with large HP pumps) Energy Conservation Solutions: – Promote energy efficiency projects such as new LED lighting – Offset industrial power with renewable energy – Use LCCA to prioritize budget packages for annual selection – Allow for innovative solutions 3

Energy Exchange : Federal Sustainability for the Next Decade Follow normal engineering economics Simple Payback is the first cut; payback of <10 year is preferable, up to 20 years is okay. Calculate energy savings, GHG emission reductions, water savings and commensurate cost savings due to decreased utility bills. Project selection depends on your agency metrics focus areas. Biggest challenge is calculating/estimating energy savings and cost of sustainable improvement. Typically need an energy manager or mechanical engineer to perform these calculation. Because LCCA is being used as a screening and prioritizing tool – no need for salvage value, time value of money, discount factors or overly intensive calculation. Just need consistency for comparison purposes. Can include maintenance savings (labor) beyond the utility savings. 4

Energy Exchange : Federal Sustainability for the Next Decade LCCA common challenges Estimating the life of equipment- Life cycle Estimating the potential cost of the proposed improvement – if the bid is high, need to re evaluate LCCA, higher market rate may change LCC effectiveness Estimating the savings of the proposed project Measurement and verification- limited building meters Not accounting for both water and heating savings Not accounting for maintenance/labor savings Not looking at bigger picture for synergistic improvements Selecting and Communicating the tradeoffs to prioritize with limited funds 5

Energy Exchange : Federal Sustainability for the Next Decade Energy Conservation Measure Estimated Cost $ Annual Energy /water Kbtu/gal LC Total LCC Energy/water savings Kbtu or gal Annual Energy/Water Savings $/yr Total Life cost savings ($) SIR Payback (yrs) HVAC 1: Re- commissioning HVAC; particularly controls to incorporate occupancy schedules and repair leaking dampers and valves $45,00083,940201,678, ,420* HVAC 2A: Retrofit to wireless pneumatic DDC controls $175,000174,900203,498,00013,380267, Lighting 1: Replace T12 (40W)-T8 lights 32W (1200 fixtures) $120, ,160 kw-hr total/ 127,000 for remaining fixtures 6.49,73862, Lighting 3: LED exit signs $3120 2,102 kw-hr2552,550730$18, Lighting 4: repair ext light sensor $5001,664 KW-hr per fixture 7 11, $ EISA Energy Audit data used in Budget request Recommended ECMs

Energy Exchange : Federal Sustainability for the Next Decade Energy Conservation Measure Estimated Cost $ Annual Energy /water Kbtu or gal LC Total LCC Energy/water savings Kbtu or gal Annual Energy/Water Savings $/yr Total Life cost savings ($) SIR Payback (yrs) BE 1: thermal imaging to look for thermal bridges of steel structure $20,0000NA0 0 LI 2: daylight sensors on perimeter (400 fixtures) $150,00033,488 kw-hr10334, , HVAC 2: Upgrade to DDC controls $286,000174,900203,498,00013,380267, W2 : Storm water re- use 200,000300,000206,000, , HVAC 5: Replace Chiller NA NLCCE replaced in <5 years: salvage value of new system too great NA Renewable 1: Install photovoltaic solar panels on existing racks $650,000154,600 KW/hr 3,092,000 kw- hrs 11,827$236, Not Recommended

Energy Exchange : Federal Sustainability for the Next Decade Solution Fluorescent-lighted exit signs (11W) can be replaced with a more efficient LED lamp (1W). Estimating Savings 10 watts per exit sign. An exit sign is illuminated continuously or 8760 hours per year. The LED type lamp has a life of over 10 years where the fluorescent lamp must be replaced approximately every 10 months. – The energy savings for a 24 fixture = 10 watts X 8760 hrs/yr = 87.6 kWh/yr X 6 per floor x 4 floors= = 2,102KW- hr/yr. The electrical cost savings = 2102 kWh/yr * $/kWh = $160 for 24 exit signs – There is also a maintenance labor savings due to the longer lamp life. Straight annualized maintenance: A fluorescent replacement lamp will cost approximately $7.00 and the labor of this replacement is estimated to be ¼ hour. Fluorescent lamp replacement material and labor cost = ($ X $60) X 8760 hrs/yr/ 7500 hrs bulb life = $25.70 /yr LED lamp replacement cost = ($ X $60) X 8760 hrs/yr/ 100,000 hrs bulb life = $1.93/yr Annual Replacement savings = $25.7 – $1.93 = $23.77/year/fixture. X 24 = $570 in labor saved per year – ECM estimate $160 saved in electricity and $570 in labor = $730 Estimating Costs LED replacement kits are available at a cost of approximately $70 (from internet search). This kit has all the necessary hardware to convert a fluorescent exit sign to one lit by a LED. The labor to make this conversion is approximately one hour. 24 exit signs x $70 plus per hr labor = $1680 materials + $1440 labor = $3120 Payback The $3,120 investment will save $ 730 per year and pay back in 4.25 years. SIR 6 Even without the labor savings $3120/ $160 electric savings years. SIR1 If the exist sign is incandescent than the bulb is usually 40 watts so the savings would triple. 8 LED lights in 24 exit signs- Electric and Labor savings ECM is Recommended

Energy Exchange : Federal Sustainability for the Next Decade Solution Changing standard Magnetic T12 F40 2 lamp per ballast that requires 96 watts with electronic ballasted F32T8 lamps which use 62 watts per two lamp one ballast retrofit. Results in a 34 watt savings or 35%. Total Savings = (2000 Fixtures X 34 watts saved ) *12 hrs of operation/day * 5 days/week * 52 wks = kWh/yr = 212,160 kw-hr per cents = $16,230 However, only 1200 fixtures remain (800 completed periodically as funds were available), so saving/costs now are 127,296 kw-hrs at a cost savings of $9738. Estimating Costs The installed cost to retrofit a single fixture runs between $100 and $150. Using the lower cost due to in-house labor, total cost of 2000 fixtures * $100 = $200,000. But only 1200 fixtures remain so the remaining costs is estimated at 1200*$100= $120,000. Payback The lamps have a life of 20,000 hours. At a use of 12 hours per day (6AM to 6PM) 5 days per week and 52 weeks, they are used 3120 hours per year making the expected life of the lamp to be 6.4 years at this facility. The savings are $9,738 per year. At the costs to upgrade the remaining fixtures of $120,000, it would take 12.5 years to payback the initial investment. Should add costs of 1 lamp replacement and recalculate payback~ 15 yrs. SIR= Saving x LC/cost= $9738 x 6.4 yr/ $120,000= 0.52 Not LCCE costs more than it saves. 9 Office Lighting - T8 replacement Example ECM is recommended, but not LCCA

Energy Exchange : Federal Sustainability for the Next Decade Solution Install light sensors that switch sets of interior, artificial lights off when the light levels are enough. Only fixtures that are near the windows on the perimeter would need to be dimmable. The number of fixtures is estimated to be 20% of the over 2000 fixtures. For purposes of life cycle analysis (LCCA) use 400 fixtures. Estimating Savings Half of the fixtures have been changed to T8 and the other half are still T12 using 65 watts and 96 watts respectively. And average watts will be used (96+ 65)/2= 80.5 watts per 2 lamp fixture. Energy savings = 400 Fixtures * 80.5 Watts/Fixture * 8 hrs/day * 0.5 (% dimmable) *5 days * 52 wks /1000 watt/Kw = 33,488 kWh/yr Value of savings = 33,488 kWh * /kWh = $2561/yr. Estimating Costs Light sensor plus timer, installed, functionality checked approximately $1,000. Estimate will need 30 light sensors= $ 30, fixtures requires addressable ballast and controls~ $200 = $80,000. Wiring $2 /sf at 20,000 sf= $40,000 $150,000 for all of the above in total cost for a day lighting retrofit of 400 fixtures on perimeter. Payback Costs of $150,000 with saving of $2561 provide a payback of 58 years. The limited number of areas close enough to the windows and the required upgrade of the electronic ballast as well as labor for rewiring and small amount of saving make this ECM not Life cycle cost effective. A better approach may be to ensure that the Building Automation System (BAS) shuts off the lights on dedicated schedule for each space. This would be managed in the recommissioning efforts below. 10 Daylighting sensor example- not recommended

Energy Exchange : Federal Sustainability for the Next Decade LCCA best practices Level of effort dictated by purpose- don’t go into too much detail if it looks like it may not be cost effective. Use engineering judgment. Consider synergies and maintenance savings if it looks like a project may be borderline. LED are 10X more life than HID Perform an audit to prioritize LCCA and start discussion with leadership of priorities (save fuel, money, electricity or water) Bundling to shorten paybacks for more complex items like solar power with lighting projects. Find projects that can be replicated: Create a community of practice to share good ideas. 11

Energy Exchange : Federal Sustainability for the Next Decade Purchase and install vendor miser controls in five vending machines, located at five buildings on the project. Infrared sensor detects movement. 5 vending machines were being cooled and lit 24/7 regardless of patterns of use. Motion sensors limited lighting and compressor use, saving electricity. SIR 2.6 ; payback in 3.2 years; KWH savings of 8,500/annum; cost savings of $522/annum. Cost Estimated $3,000 Cost actual $2444 Cannot Measure energy savings Use of vendor misers had no impact on the quality of the refreshments obtained from these machines 1611 kWh per machine, per year Utility rebates $30 to $ EXAMPLE- Plug loads in Recreation area

Energy Exchange : Federal Sustainability for the Next Decade LED Lighting project for Canal illumination and navigation marker lights. Change HID white bulbs (lamp and ballast of ~ 225 Watts) for illumination of the channel toe to LED lights (25W light head for illumination). Work performed in-house and by contract. Expect 239,260 KWH reduction LESSONS LEARNED – Look beyond the light fixture change and take advantage of energy savings by incorporating operational changes such as daylight controls and timers. – We overestimated the actual lighting savings but with operational changes (timers) and electrical distribution savings we are very close to our proposed savings. Expect additional savings when project is complete. – Will save maintenance labor. LED 100,000 hrs life: 10X more that metal halide lamp life. – M&V difficult: Lights on shared meter with shore power, admin building and bridge lighting. 13 EXAMPLE NAVIGATION LIGHTING Upgrade 14 miles of Canal Lighting to LED