1 School District of Osceola County Facilities, Planning, Maintenance & Construction Monthly Update – March 2008 Construction Workshop 25 March 2008.

Slides:



Advertisements
Similar presentations
Past and Current Initiatives in Pinellas County to Coordinate Planning between the School Board and Local Governments 1996 – Interlocal Agreement and Comprehensive.
Advertisements

Community Soccer Fields Parks and Recreation Division December 3, 2013.
Capital Program Update Maintenance Garage On schedule - Final Completion is May 19, 2007 but the District needs to move in April because the.
BOARD OF COUNTY COMMISSIONERS DECEMBER 11, 2012 CELEBRATION POINTE COMMUNITY DEVELOPMENT DISTRICTS.
Vance County Water District Overview and Update Jordan McMillen Director Vance County Planning and Development Department 156 Church St. Suite 3 Henderson,
OLD KINGS ROAD Special Assessment District. Overview History Phased Project Current Status.
+ Proposed Lockwood Targeted Economic Development District 2015 Yellowstone County.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
PRINCE WILLIAM COUNTY PUBLIC SCHOOLS. SCHOOL DIVISION WIDE ENROLLMENT FORECAST CURRENT SCHOOL CAPACITY568 Students FORECAST ENROLLMENTDEFICIT 2007 School.
Louisiana Community & Technical College System April 2013 Jan Jackson, Sr. Vice President for Finance & Administration PROGRESS of ACT 391 Construction.
1 Status Report on H. Ligarde Elementary School Parking Lot Facility Construction Department August 16, 2002.
Woodland District 50: Operations and Facilities Report Energy Update 2012 Summer Work Five-Year Facility Plan Service Maintenance Agreement Night Time.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Long Range Facility Planning assisted by Silver Falls School District.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Torrance Unified School District Bond Measure Y Bond Measure Z Quarterly Construction Update September 30, 2009.
Public Hearing Modifications to the Gated Community Ordinance Board of County Commissioners Presented by the Orange County Public Works Department February.
January 24, …a delivery method which entails a commitment by the Construction Manager to deliver the project within a Guaranteed Maximum Price (GMP).
Board of County Commissioners School Concurrency June 10, 2008 Adoption Public Hearing.
Planning and Community Development Department Housing Element City Council February 03, 2014.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
1 School District of Osceola County Facilities, Planning, Maintenance & Construction Monthly Update – April 2007 Construction Workshop 24 April 2007.
The Concurrency Process & Concurrency Service Areas School Board Workshop April 27, 2010.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Property Appraiser and Tax Collector Office Space Search Update Administrative Services Department February 25, 2014.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Silver Line Phase 1 – Status Report Status Overall Phase 1 Construction – 99% complete All Station at 98% complete except Wiehle – Reston East at 99% complete.
1 School District of Osceola County Facilities, Planning, Maintenance & Construction Monthly Update – February 2008 Construction Workshop 26 February 2008.
1 School District of Osceola County Facilities, Planning, Maintenance & Construction Monthly Update – June 2007 Construction Workshop 26 June 2007.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Lina Williams Budget & Financial Analyst Tuesday, July 28 th 2015.
64 th ILLINOIS ASBO CONFERENCE AND EXHIBITIONS APRIL 29 – MAY 1, #iasboAC15 MAKE YOUR BOARD AGENDA WORK FOR YOU Hillarie J. Siena, Ed.S.
1 School District of Osceola County Facilities, Planning, Maintenance & Construction Monthly Update – March 2007 Construction Workshop 27 March 2007.
1 1 City Commission Workshop for the DRAFT Basis of Design Report December 14, 2015 CRAVEN THOMPSON & ASSOCIATES, INC.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Lina Williams Budget & Financial Analyst Tuesday, July 14 th 2015.
Residential Plats Orange County Board of County Commissioners August 19, 2014.
ESPLOST Update Savannah-Chatham County Public Schools January 9, 2008.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
Planning Commission Study Session: Preferred Plan July 23, 2015.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Tuesday, May 3 rd, 2016.
ESPLOST Update Savannah-Chatham County Public Schools December 5, 2007.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education August 4, 2014 Stakeholder Engagement and Communications Services.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
1% Sales Tax Commission Board Meeting June 3, 2015.
Carolina North Carolina North Annual Report for Chapel Hill Town Hall September 29, 2010.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
May 4, 2011 Jenefer Youngfield Utah State Office of Education Utah K-12 Public School Construction Education and Training.
SCHOOL SITING WORK SESSION APRIL 5, Presentation Outline  Background  Minimum School Site Sizes  Public School Signage  Public Schools and Alcoholic.
Ball Field Land Acquisition Due Diligence Report.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
Southeast Rail Extension Update RTD Board of Directors FasTracks Monitoring Committee March 3, 2015.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Overview of MSBA Building Process and Project Timeline
Green Line Extension Project
Project Status & Right-of-Way Acquisition
Capital Metro Downtown Station Improvements
PROPOSED MARCH LANE / HOLMAN ASSESSMENT DISTRICT
Civic Center Sports Field Study Session & Quarterly Update
Designers’ Manual Overview and Chapter Contents
Designers’ Manual Appendix Contents
Capital Improvement Program
Classroom Enclosure – Phase II Bonnie Beard Agriculture Center
MPO School Transportation Working Group
Quarterly Transportation Report 4th Quarter 2011 October 11, 2011
Board of County Commissioners
Mount Vernon Community School
Contract Award for the Colorado Street Bridge Suicide Mitigation Enhancements Project City Council May 20, 2019 Item # 7.
Presentation transcript:

1 School District of Osceola County Facilities, Planning, Maintenance & Construction Monthly Update – March 2008 Construction Workshop 25 March 2008

2 Report Contents 1.Planning Services Division Update  Developments of Regional Impact  Concurrency  Long Range Planning Committee 2.Permitting Services Division Update  Activity Report – Permits, Inspections, C.O.’s  Administrative Issues 3.Design and Construction Services Division Update  Goals  Capital Outlay Planned Projects Update  New Schools in Development Update  Major Projects Highlight Reports  Request for Services (RFQ/RFP/Bid update)  Tax Savings Summary – New Schools  Working Issues 4.Maintenance  General Update

3 Planning Developments of Regional Impact (DRI) 1.Lake Toho DRI’s – includes Anthem Park, Toho Preserve, Tohoqua, Edgewater, Bella Tara, Friars Cove, and Green Island.  Projects consist of approx. 38,000 residential units resulting in a projected need for 11 elementary, 3 middle, and 3 high schools.  Staff meeting regularly with Lake Toho Assoc. consultants to discuss school siting and development order language and timing of residential development and school construction.  First of Toho DRI Group projects; Toho Preserve DRI was heard on January 24 th by the Planning Commission. 2.Westside DRI – Located along Westside Blvd.  Acquisition of property for Middle School “CC” was completed in December. Anticipated opening - August Stoneybrook South DRI – located west of Champions Gate DRI.  Staff working with developer to determine viability of proposed school site, finalize acquisition, and determine timing for development and school construction. This project is outside the 5 Year Work Plan.  Road Improvement Status- There is no road access to this site at this time. 4.Plaza Lakes DRI- located Northwest of East Lake Toho.  Staff is working with the developer to retain school site. A middle school site is being considered as the representative is interested in the K-8 concept for the gated community. Anticipated construction start in 3 years.

4 Planning Concurrency Presentation to the Board on current status of concurrency took place at a special School Board Concurrency Workshop on 2/12/08. The revised 5 year program work, LOSS, timing of the implementation of CSA and other concurrency issues were discussed. The Planning Services staff is currently drafting the Concurrency Management System. During March and April the staff will begin testing the system to ensure it is ready for implementation on May 1, 2008.

5 Planning Long Range Planning Committee This committee is being restructured and will be resuming regular meetings.

6 Permitting – Activity Report February 16 – March 10 YTD  Inspections Performed  Inspection Hours  Certificates of Occupancy 1 32  Certificates of Completion  Permits Issued 6 70

7 Design & Construction Goals 1.Completion/Start of all Capital Outlay Planned Projects within the fiscal year.  Completion/Start of 90% of ’07-’08 projects by June Workshop. 2. Design and start construction for new schools opening in ’08. Start construction on ES “J” by July ’07. Substantially Complete ES “K” November ’07.  Start construction on ES “L” 07/08, pending site acquisition and approvals, and open August ‘09. Start construction on Sports Authority Conversion end of 3 rd Quarter 07/08, pending resolution on City of Kissimmee conditions and requirements. 3. Implement Management Initiatives. Publish a Process & Procedures Manual; 50% 1 st draft copy for January ’07. Development & implementation of programs to assist in department operations and project administration.

8 Design & Construction Capital Outlay Program Status – ’07-’08 83% of the Planned Project Capital Program is either “Completed” or “Started”. 75% of “Not Started” Planned Projects are planned and scheduled for the summer break time period. Work Plan has been developed organizing delivery methods and bid packages optimizing pricing for the District. The data provided reflects Capital Outlay amounts based on Board approved budgets for planned projects for renovation, remodeling, and other cyclical renewal projects only.

9 Design & Construction New School Development Update 1.Elementary “L” (Poinciana) A.Planning 10/18/07Scheduled for Planning Commission Approval 10/22/07Scheduled for Board of County Commission Approval 11/5/07Scheduled for Right of Way Vacation Approval 12/18/07Closed on property B.Design & Construction 10/16/07Scheduled for CM bidding of Building Package (Bids in 11/16/07). 11/15/07Scheduled submittal of SFWMD permit application. 12/15/07Scheduled for CM bidding of Site Package (Bids in 1/8/08). 1/25/08Scheduled for CM Re-Bid of Building Package.  3/25/08 Target for GMP approval to the Board.  4/15/08Possible Construction Start pending receipt SFWMD permit.  8/18/09Scheduled for Opening.  Comments: GMP is currently being negotiated.

10 Design & Construction New School Development Update 2.Elementary “M” (Narcoossee Relief) A.Planning  2/1/08 Preliminary Site Plan utilizing 10 acre property adjacent to the south.  2/18/08Conditional Use Application submittal.  4/2/08Projected TRC Approval.  5/7/08Projected Planning Commission Approval  6/4/08Projected Board of County Commission Approval.  Comments: Possible lease of north ten acre property for portable complex is in progress. Acquisition of the south adjacent 10 acre parcel is active. Conditional Use Application will include the south 10 acre parcel for phased use of temporary portable educational complex. B.Design & Construction 3/3/08Projected SFWMD Permit Submittal  4/15/08Projected Construction Document completion.  4/29/08Projected CM bidding (Bids in 5/26/08).  6/24/08Projected for GMP approval to the Board.  7/1/08Projected Construction Start.  8/18/09Scheduled for Opening.  Comments: Reuse of Osceola Plan elementary prototype at the front of existing site. Phased construction which includes the renovation of existing classrooms to Middle School requirements and a temporary educational portable complex.

11 Design & Construction New School Development Update 3.Middle “CC” (Westside DRI) A.Planning 11/5/07Received final approval for the project by the Board of County Commission. This completes all necessary approvals.  Comments: Developer conveyed the property to the SDOC through their CDD in December Assessments will be used to fund the site acquisition at no cost to SDOC. Joint Use Agreement needed with Osceola County Parks and Recreation on Shared Park Facilities. Currently the County has not budgeted funds for improvements to the joint use park, beyond SDOC Field Middle School Standards. Comprehensive Development Plan has been approved by Osceola County. Off-site right and left turn lanes required on Goodman Rd. for access. B.Design & Construction  5/15/08Projected Construction Document completion.  5/15/08Projected SFWMD Permit approval.  1/3/10School available for opening, pending design and permit  Comments: SDOC has received the CM’s evaluation and options for accomplishing the opening of the school. Reuse of Osceola Plan elementary prototype at the front with core design adaptations for a Middle School along with a separate Gym/Classroom wing.

12 Design & Construction New School Development Update 4.Sports Authority Conversion (Alternative Programs) A.Planning 11/13/07Received final City Commission Approval for Project. This completes all necessary approvals.  Comments: Confirmation/clarification of elements of restrictive covenants needed for Interlocal Agreement. Staff will continue to work to provide City staff with courtesy copies of construction plans. B.Design & Construction 10/25/07Scheduled for Construction Document completion. 11/2/07Scheduled for CM bidding (Bids in 11/27/07). 1/29/08Projected for GMP approval to the Board. 2/1/08Projected Construction Start.  1/3/09School available for Opening.  Comments: Conversion of existing retail building to an Alternative Education Center. 2 nd floor structure will be constructed.

13 Design & Construction Project Highlight – Elementary K

14 Design & Construction Project Highlight – Elementary K

15 Design & Construction Project Highlight – Elementary K

16 Design & Construction Project Highlight – Elementary J

17 Design & Construction Project Highlight – Elementary J

18 Design & Construction Project Highlight – Sports Authority Conversion

19 Design & Construction Request for Services 1.Solicitations under development – to Purchasing April 2008  CM at Risk for the Comprehensive Renovation at Osceola High School  CM at Risk for the Comprehensive Renovation at St. Cloud High School  Design Build for Classroom Additions at 4 Schools ( HE, HTE, PHE, & MCE)  Flooring RFP 2.Advertised Solicitations –February/March 2008  Project Management Software Solution RFP  Geotechnical & Materials Testing Services for 6 Projects (PHS, MCE-2, PHE, M, & N)  HVAC Test and Balance Services for 6 Projects (PHS, MCE-2, PHE, M, & N)  A/E Services for the Comprehensive Renovation at Osceola High School  A/E Services for the Comprehensive Renovation at St. Cloud High School  Risk for the OCSA HVAC Project  Risk for Elementary School M and Elementary School N  Reprographics Services for Construction Related Documents 3. Solicitations Under Review/Selection Process  CM Services for the New Auditorium Building at Poinciana High School  A/E Design Services for Various Construction Projects at Mill Creek Elementary  CM Services for Various Construction Projects at Mill Creek Elementary  Consultant Services for Student Enrollment Projections

20 Design & Construction Owner Direct Purchase Program Tax Savings Summary – New Schools

21 Design & Construction Working Issues – Information items to be presented and discussed with the Board. 1.OCSA Auditorium Roof – contractor default 2.Celebration High School Close Out

22 Design & Construction Working Issues – Information items to be presented and discussed with the Board. 1.OCSA Auditorium Roof – contractor default  Final decision/response from Contractor/Manufacturer indicates that complete replacement of deficient work will be completed at no cost to SDOC. SDOC attorneys have drafted letter agreement for review. SDOC is working with the contractor to target a 5/15/08 start for remedial work. 2.Celebration High School Closeout  Work began during Winter break with the replacement of uncovered damaged, roof drainage piping in the courtyard. Pending a clear report of the video investigation of the final storm water piping sections, in the courtyard, final closeout to Balfour Beatty’s contract will be complete. Release of the final $50,000 retainage should follow immediately after. Expect PO request for outside dining canopy extension and related infrastructure work. This is expected to be a summer project.

23 Design & Construction Working Issues – Information items to be presented and discussed with the Board. Celebration High School Closeout  Football field drainage. Based on the civil engineer’s report staff is proceeding with a capital outlay project to raise the grade and pitch of the field playing area. This will increase the evacuation of surface water to perimeter swales, which will also be re-graded with additional new area drains tied into the existing storm water system. SFWMD permit modification application is in progress to be submitted 3/28/08. Project is targeted as a summer project starting 6/2/08.

24 End of Presentation