Online System for Compiling Member Comments July 2010 Near East Regional Workshop.

Slides:



Advertisements
Similar presentations
Moving the ethical hiring of health workers forward
Advertisements

2011 ITRS Revision Guidelines1 JAN – MARCH – ITRS TABLES DRAFTS PREPARED –ITWGs and CrossTWG Study Group meet each month with their teams to work Difficult.
ASTM Work Item Collaboration Area February Purpose of Collaboration Space Web forum that enables a task group to accelerate the development of a.
NEXT STEPS Decide if you want to work with NCAT by November 1, 2007 Send Carol Twigg an with a copy to Kevin Lemoine.
The International Plant Protection Convention (IPPC)
Frequency Responsive Reserve Process Update
MODULE THREE The IPPC Standard Setting Process. What this Module Covers The 4 stages of the IPPC Standard Setting Process:
The IPPC Online Comment System CPM-6 18 March 2011 Rome, Italy.
Flow-chart explaining information exchange and document dissemination under the IPPC IPP Training WS – Handout no. 4a.
Online postgraduate admissions SITS user forum 27 November 2009 Clare Streatfield.
Draft ISPM: Minimizing pest movement by sea containers ( ) IPPC Member Consultation 1 July to 1 December 2013.
Implementing a Regional CMMS (Computerized Maintenance Management System) Jerrard Whitten, GISP GIS/IT Manager.
Online Postgraduate Admissions Update for Postgraduate Forum – 22 January 2010 Kate Ward.
African Aviation Training Organization
PARCC Progress Update 1 June 26, In the Last Year… 2 June 2012 Minimum Technology Specifications, Version 1.0, Released Item Development Began August.
REVIEW OF COSAVE ACTIVITIES 21th TC, Entebbe, Uganda Ing. Agr. Soledad Castro Dorochessi ArgentinaBrasilChileParaguayUruguay COMITE DE SANIDAD VEGETAL.
NEW CoEs STRATEGY. CoE CoEs Network Why? Changing sector environment New capacity building responses When? WTDC-10 Resolution 73 What? New CoEs strategy.
Committee of Practitioners ESEA Flexibility Waiver Review June 25, 2014.
John Stem 7 th Annual Summit on VR PEQA Louisville, Kentucky.
7 June 2012 Guidelines for the Compilation of Water Accounts and Statistics Guidelines for the Compilation of Water Accounts and Statistics UN Statistics.
Regional Internet Registries Statistics & Activities IETF 55 Atlanta Prepared By APNIC, ARIN, LACNIC, RIPE NCC.
PPAR Workflow National Projects 1 Report request sent by PMO two weeks prior to the end of the reporting period, i.e. 15 June & 15 Dec. 2 CP can start.
1 San Diego’s Regional Planning Agency Regional Metadata Inventory Tool Presented at the San Diego Regional GIS Council meeting.
Government Recordkeeping Update June 2008 Greg Goulding, Group Manager, Government Recordkeeping Group, Archives New Zealand.
Student Growth Percentiles Basics Fall Outcomes Share information on the role of Category 1 assessments in evaluations Outline steps for districts.
Wednesday, October 28 2:30 – 3:30 PM
OData Technical Committee Convener Call June 5, 2012.
IPPC International Plant Protection Convention Roman Vágner European Commission, DG SANCO Plant health / Harmful organisms Bruxelles, 23 November 2011.
Regional IPPC Workshops 2014 Phytosanitary Resources page.
Banner Travel and Expense Management System (TEMS) Overview.
APNIC member survey 2007 Paul Wilson Director General.
REPORT TO EWG MEMBER (CORRESPONDENCE) Plan of Actions for (May) (June) (July) (August) (September)
Stage 3. Consultation and Review Standard Setting Training Course 2016.
The CED’s & DED’s role in the Tenure & Promotion of Agents
Standard Setting Training Course 2016
Merseyside County Scouts
The International Plant Protection Convention
Secretariat Matters INTOSAI Working Group on Environmental Auditing
Every Student Succeeds Act (ESSA) State Plan: Update
The International Plant Protection Convention
UNSD report 5th UNCEEA Meeting New York, June 2010
The International Plant Protection Convention
May 21-25th, 2012 Cairns, Australia
IPPC Standard Setting Process
End of Year Performance Review Meetings and objective setting for 2018/19 This briefing pack is designed to be used by line managers to brief their teams.
Ministry of internal affairs and communications Government of japan
The IRES process in Vladimir Markhonko
Revision 1 to Document CWG-SFP-2/7-E 12 September 2017 Original: English Process and timetable for The elaboration of the ITU STRATEGIC and financial.
Online System for Compiling Member Comments
NATA Foundation Building Blocks Process
Item 4.2 – Implementation of the Adult Education Survey
The SFIA Update Project Karen Webb – BCS 24 February 05
Preparation for New Curriculum Proposal System (CPS)
Standard Setting Process – Information Flow
Standard Setting Process – Information Flow
IPPC Standard Setting Process
Development of energy balance statistics
IPP Training, IICA & IPPC/FAO, Trinidad & Tobago
ePhyto DRAFT APPENDIX 1 TO ISPM 12:2011
REVIEW OF COSAVE ACTIVITIES
Strategic Coordination Group
IPP Training, EPPO & IPPC/FAO, York, U.K.
The International Plant Protection Convention
IPP Training, IAPSC & IPPC/FAO/FAORAF
Draft revision of ISPM 6: National surveillance systems ( )
SACS Working Group Continual Commitment to Accreditation and Educational Improvement April 18, 2012.
The International Plant Protection Convention
Update on what happened since the last meeting Next steps
TT-eWIS/2018 Introduction
Presentation transcript:

Online System for Compiling Member Comments July 2010 Near East Regional Workshop

Purpose of Online System Achieve standard setting work programme goals with limited Secretariat staff resources Streamline commenting system for members

System Goals Increase efficiency and accuracy in the commenting process for the Secretariat, Contact point, In-country reviewers Robust, reliable, user-friendly editing features for users Light weight model, caching and low band tools for users with slow or limited internet access Incorporate additional features requested by users, like comment sharing with other member states, levels of delegation within member states, offline component

Timeline Apr 2010 August 2010 Summer Fall 2010 November December 2010 Spring 2011 June 2011 SC Presentation: Development: Prototype completed Awareness: At regional workshops Testing: with user groups User sign off: Secretariat Training: SC meeting Trial: Member consultation 14 days before CPM Training: with user groups System Launch: 2011 Member Consultation

System Workflow Schema IPPC Secretariat In-country reviewers Prepares ISPM Draft Invite Receive Invitation & Invites Receive Invitation Comments Submit CompilesSubmit Compiles Optional Sharing with other Countries / RPPOs Final Document Contact Point