PHENIX Status, 2/22/11 VTX commissioning on beam Local polarimeter in service 9.6% in blue, -16.6% Residual transverse component for longitudinal beam.

Slides:



Advertisements
Similar presentations
Commissioning the PHENIX RPC Forward Trigger Upgrade Michael Daugherity Abilene Christian University for the PHENIX Collaboration.
Advertisements

Works done in 2003 ( Minutes and presentations of the RHIC Experiment Shielding Working Group are kept at :
PHENIX local RUN9 RHIC meeting Manabu Togawa for the PHENIX 1.
1 Run 9 PHENIX Goals and Performance John Haggerty Brookhaven National Laboratory June 4, 2009.
Run 9 polarized proton Log 9 Jan begin 45 degree cool down from room temp (3 MW-NEW) 2 Feb, Cool-down to 4.5 degrees begins 5 Feb, Blue ring cold but still.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
PHENIX Run-14 Status January 28, 2014 Klaus Dehmelt 1Klaus Dehmelt - Jan 28, 2014 RHIC Time meeting.
Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Polarimetry of Proton Beams at RHIC A.Bazilevsky Summer Students Lectures June 17, 2010.
Status of Neutral Dijet Analysis on Data from 200GeV Proton Proton Collisions Using the STAR Detector at RHIC B. S. Page for the Collaboration STAR.
Status of W analysis in PHENIX Central Arm Kensuke Okada (RBRC) For the PHENIX collaboration RHIC Spin Collaboration meeting November 21, /21/20091K.Okada.
Andrew Glenn 4/21/02 Commissioning and Performance of the. Muon Identifier Andrew Glenn (University of Tennessee), for the PHENIX collaboration April APS.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Experimental background at the presence of pressure rise in RHIC Angelika Drees, Ubaldo Iriso-Ariz RHIC How to measure collision rates Vacuum and collision.
Time Meeting 2/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 8 March 2011 Time Meeting, BNL.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
RHIC Status Time Meeting 2/3/2015 He is fixed into the ice at the center to which flow all the rivers of guilt; and as he beats his great wings as if to.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
1 S1,N1 Counters RIKEN/RBRC Itaru Nakagawa. 2 Paddle right next to beam pipe.
Run 8 Polarization measurements from STAR BBC Andrew Gordon September 12, 2008.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
May 17, 2005Wednesday Experiment Meeting BNL, Upton Acceleration beyond 100 GeV  Goal To evaluate the spin dynamics beyond 100 GeV  What’s the impact.
Preparation for RHIC PP Run in 2011 Wednesday 20, 2010 RHIC Machine Planning Meeting Haixin Huang RUN website: RUN.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
PHENIX Local Polarimeter PSTP 2007 at BNL September 11, 2007 Yuji Goto (RIKEN/RBRC)
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Mar 13.
Takao Sakaguchi, BNL Run-11 PHENIX Run Coordinator PHENIX Run-11 Report Sakaguchi, RHIC retreat 1 RHIC retreat version.
May 12, 2009Włodek Guryn1 Physic Program with Tagged Forward Protons at STAR Single Diffraction Dissociation (inclusive SDD cross section, leading  0.
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Feb 13.
Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
Time Meeting 3/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Run 12 RHIC Machine/Experiments Meeting 28 Feb 2012 Agenda: Discussion - when to end the 200 GeV pp run… presently scheduled to end early Friday morning,
APEX Report: February 26-27, 2008 Fulvia Pilat Time Meeting, March 4, 2008.
Oct 6, 2008Amaresh Datta (UMass) 1 Double-Longitudinal Spin Asymmetry in Non-identified Charged Hadron Production at pp Collision at √s = 62.4 GeV at Amaresh.
PHENIX Measurement of Parity-Violating Single Spin Asymmetry in W Production in p+p Collisions at 500 GeV Stephen Pate (for the PHENIX Collaboration) New.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
First Collision of BEPCII C.H. Yu May 10, Methods of collision tuning Procedures and data analysis Luminosity and background Summary.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
PERFORMANCE OF THE PHENIX SOUTH MUON ARM Kenneth F. Read Oak Ridge National Lab & University of Tennessee for the PHENIX Collaboration Quark Matter 2002.
PM Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
First CMS Results with LHC Beam
RHIC status Chuyu Liu Time meeting Apr. 28, 2015.
Longitudinal Spin Asymmetry and Cross Section of Inclusive  0 Production in Polarized p+p Collisions at 200 GeV Outline  Introduction  Experimental.
Orbit related issues of the spin tune control at RHIC V.Ptitsyn, M.Bai, W.MacKay, T.Roser.
Measurement of the Double Longitudinal Spin Asymmetry in Inclusive Jet Production in Polarized p+p Collisions at 200 GeV Outline Introduction RHIC.
RHIC CNI Polarimeter status RHIC CNI Group February 26, 2008.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Oct. 12, 2007 Imran Younus k T Asymmetry in Longitudinally Polarized p +p Collisions at PHENIX.
Run11 MuTrig Performance RIKEN/RBRC Itaru Nakagawa 1.
Overview of the sea quark polarization measurements of PHENIX at RHIC DIS April 12, Rusty Towell Abilene Christian University on behalf of the PHENIX.
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
RHIC Status and E-lens 101 Spin Collaboration Meeting V. Schoefer 2/6/2015.
Run 10 Start-up Status
ApEx needs for CeC PoP Experiment December 11, 2015.
PHENIX Plan for Run13 Kieran Boyle RSC 01/11/20131.
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 19 April 2011 Time Meeting, BNL.
H-jet Run at Injection A. Dion, H. Huang, A. Poblaguev, A. Zelenski, and YM.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Kazuya Aoki For the PHENIX Collaborations. Kyoto Univ. / RIKEN
Summary for LPC (March 7th, Ralph Assmann)
p0 ALL analysis in PHENIX
Presentation transcript:

PHENIX Status, 2/22/11 VTX commissioning on beam Local polarimeter in service 9.6% in blue, -16.6% Residual transverse component for longitudinal beam If the values are true, difficult to accept MuTrig and RPC commissioning MuTrig in final adjustment Making coincidence of MuTrig and RPC Finalizing timing and trigger setup for physics running Background This morning, we saw the smooth transition on background when steering beam Still RPC background should be reduced. Working around. Collimator test, etc. Takao Sakaguchi

Integrated events Events in data files named “PHYSICS”

RPC Background investigation Hit Rates Tunnel Scalers vs RPC Rates - RHIC store Yellow beam dumped, only blue beam left in ring- (blue runs from south to north through PHENIX IR) Run Yellow beam dumped Injection Yellow beam dumped Orbit correction test Run /11 Run

Hit Rates Tunnel Scalers vs RPC Rates 480k clock trigger events. run Blue beam only RPC3S RPC3N 4/11 We see large background From Blue beam

Hit Rates Tunnel Scalers vs RPC Rates clock trigger events. Before yellow dump, both beams are on run We see large background From Both beam Note, Vertical scale is different from the previous.

Hit Rates Tunnel Scalers vs RPC Rates - Same run as before, but extracted collision-related timing. run RPC3S RPC3N 6/11 Even for collision events, We see background in center region

-location of tunnel scalers south RPC3 South South Muon arm structure 7/11

Special runs next couple days Vernier scans – With collimator test (set back after collimation) – Collimator may have caused additional background 1x3 bunch run – For RPC1 development 20% magnetic field runs

backup

Hit Rates Tunnel Scalers vs RPC Rates - Cosmics. run k clock trigger events. run Cosmics no beam RPC3S RPC3N 10/11