THEMIS/GBO CDR Peer Review 1 Univ.of Calgary, Apr. 26-27, 2004 GBO Deployment Plans and Status Canada Sites Mike Greffen THEMIS Canada Site Operations.

Slides:



Advertisements
Similar presentations
TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
Advertisements

FRPA Data Collection, Management and Reporting Defining the Business Requirements RSM Pilot Review Workshop February 2005.
1. Four LLs were published in February Transmission Relaying – Undesired Blocking 2.Lack of Separation for Critical Control Power Supply Leads.
Michelle Ross Sheila Hensley January 2015.
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O VERVIEW OF P ROGRAM AND CPA L EVEL M ONITORING, P REPARATION OF M ONITORING.
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) All Sky Imager Design Stewart Harris - UCB.
California Integrated Waste Management Board Agreement with Air Resources Board for Surveillance Assistance Special Waste Committee Meeting May 10, 2006.
REQUEST FOR PROPOSALS RFP #08-56 Project Management and Procurement Assistance Consultant for an Intelligent Transit System Solution (I.T.S.S.) October.
Software Project Transition Planning
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) Engineering Peer Review Oct. 17, 2003 THEMIS ASI Array – Canadian.
ISO 9000 Certification ISO 9001 and ISO
THEMIS/GBO Engineering Peer Review CTR - 1 UCB, Oct 17, 2003 GBO/EPO Magnetometers: Overview C. T. Russell.
Presented by Manager, MIS.  GRIDCo’s intentions for publishing an Acceptable Use Policy are not to impose restrictions that are contrary to GRIDCo’s.
THEMIS/GBO CDR Peer Review 1 Univ. of Calgary, Apr , 2004 Ground Magnetometer David Pierce UCLA.
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) Observatory System Design Stewart Harris - UCB.
Data management in the field Ari Haukijärvi 2nd EHES training seminar.
Module 13: Maintaining Software by Using Windows Server Update Services.
THEMIS/GBO CDR Peer Review 1 Univ.of Calgary, Apr , 2004 Ground Based Observatories (GBO) CDR Peer Review S. B. Mende University of California -
Chapter 16 Designing Effective Output. E – 2 Before H000 Produce Hardware Investment Report HI000 Produce Hardware Investment Lines H100 Read Hardware.
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) Observatory System Design Stewart Harris - UCB.
VISITBASIS Introduction and System Overview. I NTRODUCTION About VisitBasis VisitBasis Retail Execution is a cloud-based complete mobile data collection.
Utah Telescope Site Selection 2008 D. Kieda, S. Lebohec, W. Springer, P. Gondolo, K. Martens, P. Gondolo, P. Ricketts, C. Zimmer University of Utah.
Jump Starting ITS Deployment in Los Angeles County using Wireless Communications Lessons Learned.
© CCI Learning Solutions Inc. 1 Lesson 5: Basic Troubleshooting Techniques Computer performance Care of the computer Working with hardware Basic maintenance.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
THEMIS/GBO CDR 1 UC Berkeley, June 17, 2004 Ground Based Observatories (GBO) CDR S. B. Mende University of California - Berkeley.
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) Program Schedule and Status Stewart Harris.
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the.
Information Systems Security
Intro to Network Design
THEMI GBO meeting 1 UCB 06/02/2003 THEMIS Ground Based Observatories S. B. Mende.
THEMIS/GBO CDR Peer Review 1 Univ. of Calgary, Apr , 2004 Alaska Ground Based Observatories (with E/PO involvement) GBO Peer Review April 27, 2004.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 NRL-SLAC Networking LAT Environmental.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Toward a Multi-State Consensus on Rural Intersection Decision Support: Objectives u Gain understanding of issues involved with national rural intersection.
THEMIS Workshop 1 UC Berkeley, 18 December 2004 Data Products and Access Tim Quinn UC Berkeley.
THEMIS/GBO CDR Peer Review THEMIS – A Canadian Perspective Eric Donovan – University of Calgary April 26, 2004.
Iron Ore Holdings Ltd Buckland Project & Northern Quoll: adaptive mine design and management 30 July
1 Computer Maintenance Software Configuration: Evaluating Software Packages, Software Licensing, and Computer Protection through the Installation and Maintenance.
THEMIS/GBO 1 Banff, March 29, 2006 Agenda – GBO Review.
THEMIS/GBO CDR Peer Review 1 Univ. of Calgary, Apr , 2004 Ground Based Observatories (GBO) MCDR Stewart Harris.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
THEMIS/GBO Review 1 Banff, March 29, 2006 Ground Based Observatories (GBO) System Design Overview Operational Status Lessons Learned S. E. Harris University.
THEMIS/GBO CDR 1 UC Berkeley, June 17, 2004 Ground Based Observatories (GBO) CDR S. B. Mende University of California - Berkeley.
RUP Deployment RUP Deployment Workflow
THEMIS/GBO Site Tour 1 January 2006 Ground Based Observatories (GBO) Tour of Current Sites (Jan ‘06) Stewart Harris.
THEMIS-SWG 1 September 14, 2011 Status and News about the THEMIS GBOs H.U. Frey 1, E. Donovan 2, S.B. Mende 1, E. Spanswick 2 1 SSL, University of California,
THEMIS-SWG 1 September 14, 2011 Status and News about the THEMIS GBOs H.U. Frey 1, and E. Donovan 1 University of California, Berkeley 2 University of.
Ground Based Observatories (GBO) All Sky Imager Design Stewart Harris - UCB _101220_ATHA.
THEMIS/GBO KickOff 1 UCB, June 2, 2003 Ground Based Observatories (GBO)
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) Engineering Peer Review Oct. 17, 2003 Field Site Deployment/Operations.
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
1 State of Georgia (GTA) Desktop Inventory Workshop March 16, 2009 © 2009 IBM Corporation IBM.
A Global Approach to EMF Management and Standards Mike Wood Vice Chairman, ITU-T SG5, WP2 11th Symposium on ICT, Environment and Climate Change 21 April.
USAID Afghanistan Engineering Support Program (ESP) Pre-Bid Meeting July 14, 2015.
Computer Maintenance Software Configuration: Evaluating Software Packages, Software Licensing, and Computer Protection through the Installation and Maintenance.
Adult Education and Literacy Monitoring FY17
DNP Initiative ENG-003 Standard Design Process Overview Configuration Management Benchmarking Group June 12, 2017.
Prototype Camera Mount
UCLA Support for THEMIS
Site Monitoring Requirements
Adult Education and Literacy Monitoring FY17
Florida Transportation Commission FY 2009
Computer Maintenance Software Configuration: Evaluating Software Packages, Software Licensing, and Computer Protection through the Installation and Maintenance.
Notification issued by Higher Education Department in November, 2014
Proposed Ozone Monitoring Revisions Ozone Season and Methods
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Specifications What should it cover Goods Services Warranty
Presentation transcript:

THEMIS/GBO CDR Peer Review 1 Univ.of Calgary, Apr , 2004 GBO Deployment Plans and Status Canada Sites Mike Greffen THEMIS Canada Site Operations Manager University of Calgary

THEMIS/GBO CDR Peer Review 2 Univ.of Calgary, Apr , 2004 Introduction Talk overview THEMIS Canada Site Operations Manager’s responsibilities. Site selection process and site requirements. GBO deployment process. Site information organization, THEMIS-C website Current site status with emphasis on the status of sites to be deployed in 2004.

THEMIS/GBO CDR Peer Review 3 Univ.of Calgary, Apr , 2004 Site Operations Manager The THEMIS Canada Site Operations Manager is responsible for: Locating 16 Canadian sites that meet the site requirements for a GBO. The deployment of 16 Canadian GBOs. Monitoring and maintaining the health of all active Canadian GBOs (and custodians). Retrieval of the ‘non-real time’ data (shipping of disks).

THEMIS/GBO CDR Peer Review 4 Univ.of Calgary, Apr , 2004 Site Map

THEMIS/GBO CDR Peer Review 5 Univ.of Calgary, Apr , 2004 Site Requirements The minimum site requirements for a GBO are: A view over a 160° hemisphere for the all sky camera. This view should be as unobstructed as possible. A site clear of magnetic interference (as much as possible). Power, 120 V, 60Hz (single phase) at 10 Amp service.

THEMIS/GBO CDR Peer Review 6 Univ.of Calgary, Apr , 2004 Site Requirements A field operator who can periodically inspect and maintain the site and manually retrieve data (which consists of removing a hard drive from the site computer and shipping it to the University of Calgary). Relatively easy access to select THEMIS personnel. If available we would also like to make use of: An existing internet connection. An existing building or similar infrastructure in which would could place the bulk of the GBO equipment.

THEMIS/GBO CDR Peer Review 7 Univ.of Calgary, Apr , 2004 Site Selection Site Selection process: Start with recommended site. Use Web and pre-existing local contacts to make initial inquiries. As candidate sites appear, obtain photos and local testimonials of the site. Request panoramic photos of potential ASI field of view. Determine level of local magnetic interference as best as possible from photos and testimonials.

THEMIS/GBO CDR Peer Review 8 Univ.of Calgary, Apr , 2004 Site Selection If a suitable site can not be found remotely, travel to site region and engage in first hand reconnaissance. When site meets all requirements establish agreement between University of Calgary and site landlord for use as THEMIS GBO site. Arrange power connection and Telesat installation (if necessary). Finalize shipping and travel arrangements.

THEMIS/GBO CDR Peer Review 9 Univ.of Calgary, Apr , 2004 GBO Deployment GBO Deployment process: Travel to site, with some or all of the GBO. Supervise any contracted work (such as power or Telesat installation). Deploy GBO (OSE, ASI, GMAG). Run GBO for several days. Run a series of ‘acceptance tests’ to confirm housekeeping and instrumental health. The GBO will then undergo a 30 day commissioning period supervised by the Data Specialist.

THEMIS/GBO CDR Peer Review 10 Univ.of Calgary, Apr , 2004 Selection and Deployment A “typical” site selection and deployment timeline. Building block of overall deployment schedule. Bulk of site research can be completed “off season.” Note that lines 7,9 and 11 will only occur at U Calgary for the first 4 deployments. After that they will be done at U Berkeley.

THEMIS/GBO CDR Peer Review 11 Univ.of Calgary, Apr , 2004 Site Information Organization The information collected for each site will be published on the THEMIS-C website, including: Directions to the site, including airline, ground transportation and shipping information. Photos of the site and surrounding area. Names and contact information of regional contacts, including custodians. GBO installation details and site visit reports. aurora.phys.ucalgary.ca

THEMIS/GBO CDR Peer Review 12 Univ.of Calgary, Apr , 2004 Current Site Status From THEMIS-C website. aurora.phys.ucalgary.ca

THEMIS/GBO CDR Peer Review 13 Univ.of Calgary, Apr , 2004 Current Site Status aurora.phys.ucalgary.ca From THEMIS-C website.

THEMIS/GBO CDR Peer Review 14 Univ.of Calgary, Apr , Sites – Lac de Gras Proposed location is BHP Billiton’s Ekati diamond mine. They have offered use of: Existing communications infrastructure, including wireless internet on site and some bandwidth to outside world (there are some firewall issues). A building in which we can place the Observatory Support Electronics (OSE).

THEMIS/GBO CDR Peer Review 15 Univ.of Calgary, Apr , Sites – Prince George The leading candidate location is a University of Northern British Columbia (UNBC) operated research forest. Isolated location about 60 km from Prince George with relatively easy access to power and attached custodian.

THEMIS/GBO CDR Peer Review 16 Univ.of Calgary, Apr , Sites – Flin Flon Site is currently to be moved to the Meteorological Services Canada (MSC) Upper Air Monitoring station at The Pas (150 km from Flin Flon). Has available infrastructure and attached custodian.

THEMIS/GBO CDR Peer Review 17 Univ.of Calgary, Apr , Sites - Athabasca The prototype GBO was deployed in Athabasca on April 16, This will become the final deployment at this site with only minor modifications.

THEMIS/GBO CDR Peer Review 18 Univ.of Calgary, Apr , Sites - Athabasca The ASI Enclosure next to the 1 metre dome.

THEMIS/GBO CDR Peer Review 19 Univ.of Calgary, Apr , Sites - Athabasca The backup site custodian.