THE IMPACT OF THE RSR ON RAIL OPERATIONS CHALLENGES ON SAFETY PERFORMANCE AND DATA ANALYSIS MAKGATI C.K.M. IRSC 2008 DENVER, COLORADO. USA.

Slides:



Advertisements
Similar presentations
Module N° 4 – ICAO SSP framework
Advertisements

Select Committee on Economic Development Impact of Cable Theft on Economic Development.
The New GMP Annex 11 and Chapter 4 Deadline for coming into operation: 30 June 2011.
Presentation for the Management Study of the Code Enforcement Process City of Little Rock, Arkansas August 3, 2006.
State of Safety Breakfast 2013/14 24 November 2014 Dr Cornel Malan RSR Head : Research.
1 International Railway Safety Conference – Tokyo 2002 SESSION THEME:MANAGEMENT FOR SAFETY TITLE:RAILWAY SAFETY PROCESS MANAGEMENT IN SPOORNET PRESENTER:HERMAN.
Implementing SMS in Civil Aviation: the Canadian Perspective.
October 2008 International Rail Safety Conference 2008 Denver, Colorado, USA.
The Federal Regulator’s Perspective Industrial Railway Safety Conference Fort Saskatchewan, Alberta April 28, 2015.
DWA CORPORATE IDENTITY Presented by: Johan Maree Deputy Director: Media Production 12 December 2012 Compliance Monitoring Strategy Presented by: Anet Muir.
The Impact of Economic Regulation Cathy Mannion Director Water Commission for Energy Regulation Local Authority Services National Training Group Conference.
HARD TIMES: A DIFFERENTIATED REGULATORY APPROACH ANKIE PIENAAR RAILWAY SAFETY REGULATOR SOUTH AFRICA.
Safe systems approach for mining road safety Damir Vagaja Manager Mining and Resources ARRB Group.
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
Fundamentals of ISO.
1 Railway Safety Regulator Portfolio Committee on Transport: 21 October 2010 Annual Report
Health and Safety Executive Health and Safety Executive Discretion and Judgement: HSE’s approach Mike Cross 3 June 2014.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
> taking best practice to the world International Experience with Performance Based Maintenance Contracts.
 Road Safety the European Union Policy Carla Hess European Commission, Directorate General for Mobility & Transport Road.
Leading the Public Service to Higher Productivity DPSA: Ethics and Integrity Management.
Portfolio Committee Presentation Government printing Works Audit and Compliance 07 May 2013 Presented by: Chief Executive Officer.
PRESENTATION TO THE SELECT COMMITTEE ON PUBLIC SERVICES (NATIONAL COUNCIL OF PROVINCES). 02 SEPTEMBER 2008 NATIONAL RAILWAY SAFETY REGULATOR AMENDMENT.
Vaal University of Technology (formerly Vaal Triangle Technikon ) Ms A.J. GOZO Senior Director: Library and Information Services.
The DoL Quarter 1 Report (Performance Information) for the Financial Year 2014/15 Presentation to the Portfolio Committee OCTOBER 2014.
1 Information Management Process for Electricity Distribution at NERSA.
Audit of predetermined objectives Presentation: Portfolio Committee on Economic Development March 2013.
REPORTING, MONITORING AND PERFORMANCE EVALUATION PROVISIONS ON NON-FINANCIALS – 2013/14 1 MIG Quarterly Workshop 3 – 4 September 2013.
1 Monitoring and Evaluation System Mr M Thibela by Director: Corporate Planning Department: Water Affairs (DWA) 18 August 2009.
Hazards Identification and Risk Assessment
1 Portfolio Committee on Transport Annual Report Briefing 2004/05.
Capacity Building for the Kosovo Anti- Corruption Agency Constantine Palicarsky.
1 Railway Safety Regulator Strategic Plan: 2007/8 to 2009/10 Presentation to the Portfolio Committee on Transport 28 March 2007.
1. 2 Background Bill C-3, International Bridges and Tunnels Act: –introduced in the House of Commons on April 24, 2006 –received Royal Assent on February.
11 November2014 RAILWAY SAFETY REGULATOR 2014/15 FINANCIAL YEAR QUARTER 1 & QUARTER 2 PROGRESS 1.
2002/02/20Portfolio Committee1 Railway Safety Regulator Project.
Assessment of Annual Performance Plan 2014/15 Department of Rural Development and Land Reform 2 July 2014.
Public Service Commission Presentation to the Portfolio Committee on Public Service and Administration 25 May 2007 Batho Pele Audits and Citizen Satisfaction.
RE-E / IRSC / 27/09/ /10/09 1 The necessary evolution of railway safety regulations in Europe A challenge – Risks to be controlled.
Good Management Effective Organisations Bjørn Bauer PlanMiljø.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Part 11 Public Meeting PEERS Questions & Responses The opinions expressed here belong to PEERS members and not the corporate entities with which they are.
Shortage of Trained Tanker Officers ? “The INTERTANKO Solution” Hellenic Mediterranean Panel 23 rd October 2008 Athens Capt Howard N. Snaith. Marine Director.
ISO Registration Common Areas of Nonconformances.
PRESENTATION TO PORTFOLIO COMMITTEE ON TRANSPORT 04 TH JUNE 2008 NATIONAL RAILWAY SAFETY REGULATOR AMENDMENT BILL,
REPORTS ON THE IMPLEMENTATION OF THE PMDS FOR SENIOR MANAGERS IN THE EASTERN CAPE AND NORTH WEST PROVINCES Presentation to the Portfolio Committee on Public.
HIPAA Summit Practical Approaches to Sticky Payer Issues April 26, 2002 Bob Perlitz, AVP, HIPAA Compliance Officer.
International Railway Safety Conference 2008 A regulator’s challenge – inspecting the right things Allan Spence HM Deputy Chief Inspector (Operations)
ISO RECORDS. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Describe.
PRESENTATION TO PORTFOLIO COMMITTEE ON SPORT AND RECREATION SPORT INFRASTRUCTURE.
2015/16 Strategic Plan Breaking Barriers and Building Bridges – A Collaborative Journey 1.
Page 1 Portfolio Committee on Water and Environmental Affairs 14 July 2009.
OHSAS Occupational health and safety management system.
ROAD INFRASTRUCTURE SAFETY MANAGEMENT DIRECTIVE (RISM) Harry Cullen SPM Road Safety, National Roads Authority, Ireland Chairman of CEDR Technical Group.
7th IMFO AUDIT & RISK INDABA Are clean audits a solution to service delivery challenges faced by municipalities? 6 April 2016 Sharonne Adams - Business.
HEALTH INFORMATION & PATIENT SAFETY BILL 2015 Dr Kieran Doran, Solicitor Senior Healthcare Ethics Lecturer School of Medicine University College Cork 1.
1 PORTFOLIO COMMITTEE ON MINERAL RESOURCES DISCUSSION ON THE MINERAL RESOURCES 2014 / 15 STRATEGIC PLAN 8-9 July 2014 Programme 3 – Mineral Regulation.
1 Railway Safety Regulator Strategic Plan 2008/09 – 2010/11 Presentation to the Portfolio Committee on Transport 11 March 2008.
Victorian Child Safe Standards
Office of Rail Regulation
PRESENTATION ON THE STATUS AND THE BUDGET OF THE RAILWAY SAFETY REGULATOR TO THE PORTFOLIO COMMITTEE ON TRANSPORT PARLIAMENT OF THE REBUPLIC OF SOUTH.
Presentation to Portfolio Committee
Contents Introduction Strategic Priorities
School travel planning an engineer will love
‘Next-level’ communication: A critical role in risk management
School travel planning an engineer will love
Railway Safety Regulator Project
2018/19 ANNUAL PERFORMANCE PLAN FOR MISA
WASTEWATER MANAGEMENT 19 September 2018
OVERVIEW OF THE OCJ ANNUAL REPORT FOR THE 2016/17 FINANCIAL YEAR
Presentation transcript:

THE IMPACT OF THE RSR ON RAIL OPERATIONS CHALLENGES ON SAFETY PERFORMANCE AND DATA ANALYSIS MAKGATI C.K.M. IRSC 2008 DENVER, COLORADO. USA.

2 SCOPE  INTRODUCTION  WHO DO WE REGULATE: PARTIES INVOLVED  CHALLENGES ON SAFETY PERFORMANCE AND DATA ANALYSIS EXPERIENCED BY THE RSR  POSSIBLE AND IMPLEMENTED SOLUTIONS  IMPACT OF THE RSR THUS FAR  CONCLUSION

3 INTRODUCTION  THE RSR IS A FAIRLY NEW ORGANISATION  THE ACT GOVERNING IT WAS TABLED IN THE SOUTH AFRICAN PARLIAMENT ON THE 05 TH DAY OF AUGUST 2002  THE PERSONNEL POPULATING THE RSR STRUCTURE EFFECTIVELY CAME TO BEING DURING JANUARY 2006  DURING APRIL 2006, ITS OPERATIONS TOOK SHAPE  THIS CAME LONG AFTER TRANSNET FREIGHT RAIL (SPOORNET) AND SARCC/METRORAIL WERE IN EXISTANCE

4 WHO DO WE REGULATE: PARTIES INVOLVED RSR 1. NETWORK OPERATOR 1.3 Construction, maintenance, operation 1.4 Train movement authorisation 1.1NETWORK OWNER 1.2 Construction, maintenance 2. TRAIN OPERATOR (TRACTION) 2.3 Wagon Operator (Carrier) 2.6 WAGON OWNER 2.8 Wagon Maintenance 2.7 Wagon maintenance 2.4 Traction Maintenance 2.5 Train Movement authorisation 2.1 TRACTION OWNER 2.2 Traction Maintenance 3. STATION OPERATOR 3.1 STATION OWNER 3.3 Maintenance 3.2 Maintenance

5 CHALLENGES IN SAFETY PERFORMANCE AND DATA ANALYSIS  THE CHALLENGE FOR RSR TO CONDUCT ANALYSIS AND MEASURE SAFETY PERFORMANCE EMANATES FROM VARIOUS SOURCES  CRITICAL TO THESE PROCESSES ARE THE FOLLOWING: α REPORTING OF OCCURRENCES α SAFETY PERFORMANCE INDICATORS α LEGISLATIVE REQUIREMENTS α RSR PERSONNEL

6 CHALLENGES IN SAFETY PERFORMANCE AND DATA ANALYSIS α REPORTING OF OCCURRENCES †THE RSRs GUIDELINES, STANDARD AND THE LESGISLATION REQUIRES OPERATORS TO REPORT THEIR RAIL OPERATIONS OCCURRENCES USING THE FOLLOWING FORMATS:  IMMEDIATE OCCURRENCE REPORTING  DAILY OCCURRENCE REPORTING  FOLLOW-UP REPORTING  QUARTERLY REPORTING

7 CHALLENGES IN SAFETY PERFORMANCE AND DATA ANALYSIS α THE CHALLENGE WITH REGARDS TO THESE FORMATS ARE:  INFORMATION HANDLING WITHIN THE RSR ONCE THE OPERATOR MAKES A SUBMISSION  INCOMPLETE SUBMISSIONS BY OPERATORS  NON SUBMISSIONS BY OPERATORS WITH REGARDS TO REQUIRED INFORMATION

8 CHALLENGES IN SAFETY PERFORMANCE AND DATA ANALYSIS √ IMPLEMENTED SOLUTIONS TO ADDRESS THE CHALLENGES SURROUNDING THE ABOVE MENTIONED FOUR FORMATS ARE AS FOLLOWS: ◊ REVISION OF THE DATA FORMAT ◊ ENFORCING STANDARD TEMPLATES ◊ REVISION OF THE SANS ◊ ERRADICATION OF IGNORANCE ◊ CLEARING HOUSE CONCEPT

9 CHALLENGES IN SAFETY PERFORMANCE AND DATA ANALYSIS α SAFETY PERFORMANCE INDICATORS TRANSNET FREIGHT RAIL AND THE SOUTH AFRICAN RAIL COMMUTER COOPERATION FORMED 93% OF ALL RAIL OCCURRENCES DURING THE 2006/07 FINANCIAL YEARS COLLISIONS AND DERAILMENTS COST OF OCCURRENCES  NORMALISING FIGURES

10 CHALLENGES IN SAFETY PERFORMANCE AND DATA ANALYSIS α LEGISLATIVE REQUIREMENTS NON SUBMISSION OF REPORTS DUE TO THE LACK OF UNDERSTANDING OF THE SANS CATEGORIES  SPLIT OF SANS CATEGORIES  USE OF AUDITS  ENCOURAGE SITE RESPONSIBLITY  REVISION OF THE ACT  ENCOURAGE THE USE OF SAFETY MANAGEMENT SYSTEM

11 CHALLENGES IN SAFETY PERFORMANCE AND DATA ANALYSIS α RSR PERSONNEL ELEVEN ENGINEERS FORM THE RSRs INSPECTORATE OVER EIGHT HUNDRED OPERATIONAL SITES TO BE ADDRESSED IN ONE AUDIT CYLCLE  RSR SHOULD ENCOMPASS SUSTAINABLE INSTITUTIONAL CAPACITY IN ITS STRATEGIC ENDEAVOURS  PLACE EMPHASIS ON HUMAN CAPITAL  RSR TO REVIEW ITS FOCUS AS TO TRY REACH ITS SET AUDIT AND INSPECTIONS TARGET  USE THE ACT TO DO THE WORK

12 POSSIBLE AND IMPLEMENTED SOLUTIONS √ REVISION OF THE ACT, REGULATIONS AND SANS ◊ IMPLEMENTED THE REVISED TEMPLATES ◊ REVISED THE ACT TO ENSURE THAT THE RSR HAS MORE POWERS TO PENALIZE NON COMPLIANT OPERATORS, IS ABLE TO WITHDRAW PERMITS, ETC ◊ CONFLICTING SANS CATEGORIES HAVE BEEN CLEARED √ CATALYSE THE COMPLIANCE AUDITS √ ENCOURAGE BENCHMARKING AND INTRODUCE THE NATIONAL INFORMATION MANAGEMENT SYSTEM (NIMS) √ CONSIDER REVISING THE MINIMUM REQUIREMENTS FOR REPORTING

13 THE RSR IMPACT THUS FAR ◊ INCREASED NUMBER OF REPORTS SUBMITTED TO THE RSR ◊ THE DAILY REPORTS HAVE SOME USEFUL INFORMATION ENABLING THE RSR TO MAKE DECISIONS WITHOUT THE OPERATOR INTERPRETING THIS AS A THREAT ◊ 239 SAFETY MANAGEMENT SYSTEM AUDITS AGAINST A TARGET OF 288 WERE CONCLUDED ◊ 11 AD-HOC INSPECTIONS CONDUCTED ◊ 09 INVESTIGATIONS INTO VARIOUS OCCURRENCES CONCLUDED ◊ 49 SAFETY REVIEWS AND ASSESSMENTS OF NEW WORKS INCLUDING THE INTRODUCTION OF NEW TECHNOLOGY AND OPERATIONAL IMPROVEMENTS BY MAJOR OPERATORS INCLUDING SAFETY ASSESSMENTS OF THE PROPOSED GAUTRAIN STANDARDS

14 THE RSR IMPACT THUS FAR... ◊ AS A RESULT OF THE RSR’S INSPECTORATE ACTIVITIES, THE RSR WAS ABLE TO ISSUE THE FOLLOWING NOTICES OR DIRECTIVES OF ITS COMPLIANCE MONITORING AND ENFORCEMENT DRIVE: ◊ 04 PROHIBITION DIRECTIVES (WHEN IMMEDIATE THREAT TO RAILWAY SAFETY IS EVIDENT) ◊ 25 LETTERS OF NON-COMPLIANCE (FOR EXAMPLE WHEN NO ELEMENTS OF THE STANDARD WERE IMPLEMENTED) ◊ 27 IMPROVEMENT DIRECTIVES (WHEN THERE’S POSSIBLE THREATS TO SAFETY, FOR EXAMPLE, CIVIL INFRASTRUCTURE DEFECTS) ◊ 1456 AUDIT NON-CONFORMANCES (RELATES TO RELATIVELY MINOR BUT IMPORTANT FINDINGS WITHIN THE OPERATOR’S SAFETY MANAGEMENT SYSTEM)

15 CONCLUSION  OPERATORS ARE NOW TAKING SAFETY AS A CRITICAL ENTITY TO BE CONSIDERED AT ALL TIMES WITHIN THEIR OPERATIONS  OPERATORS NOW RECORD AND MANAGE THEIR OCCURRENCES  IT IS NOW AN ACCEPTABLE FACT THAT THE RSR, THOUGH AN “INFANT”, IS MAKING AN IMPACT AND WILL CONTINUALLY STRIVE TO ENSURE THAT THE RAIL OPERATIONS ARE SAFE, SECURE AND ON TRACK!

16 THANK YOU