Lead from the front Texas Nodal 1 TPTF Update for TAC November 29, 2007 Trip Doggett.

Slides:



Advertisements
Similar presentations
Lead from the front Texas Nodal 1 TPTF Update for TAC December 4, 2008 Joel Mickey
Advertisements

Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee February 7, 2008.
Protocol Revision Subcommittee Sandy Morris August 5, 2010.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Requirement Documents November 7, 2006 Sai Moorty MMS Project.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 8, 2008.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation Program Implementation Scenarios September 6, 2006.
Lead from the front Texas Nodal 1 TPTF Update for TAC February 5, 2009 Joel Mickey
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 8, 2010.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 4, 2009.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 6, 2008 Trip Doggett.
Lead from the front Texas Nodal 1 TPTF Update for TAC April 4, 2008 Trip Doggett.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
Lead from the front Texas Nodal 1 TPTF Update for TAC October 5, 2007 Trip Doggett.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 8, 2007 Trip Doggett.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
ROS Meeting – 05/15/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 05/15/08.
Nodal ATF 1 Nodal Advisory Task Force Update for TAC November 4 th, 2010.
Lead from the front Texas Nodal 1 Integrated ERCOT Readiness and Transition (IRT) TPTF - November 6 th, 2006.
CRR Issues Transparency provided by CRR Reports CRR EDS handbook Business process NPRR TPTF November 27, 2007.
Lead from the front Texas Nodal 1 Texas Nodal Registration Kick-off Meeting Matt Mereness June 6 th, 2007.
July 06, 2006 – TAC Meeting 1 TPTF Update Trip Doggett.
January 21, 2008 TPTF 168 Hour Test Initial Approach Discussion.
Lead from the front Texas Nodal 1 TPTF Update for TAC February 1, 2007 Trip Doggett.
Texas Nodal Market Implementation Metric Sub Group Readiness Advisor January 30, 2006.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 30, 2007 Trip Doggett.
Item 3: PRS Report John Varnell 2013 PRS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public November 7, 2013.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
1 TAC Report to the ERCOT Board February 16, 2005.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2010.
Lead from the front Texas Nodal 1 TPTF Update for ROS October 16, 2008 Stacy Bridges
Lead from the front Texas Nodal 1 Texas Nodal EDS 3 Early Delivery System Plan TPTF April 02, 2007.
Congestion Revenue Rights 1 Texas Nodal Market Implementation Program CRR Requirements Updates CRR Project Team – Presented by Beth.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 6, 2006.
Lead from the front Texas Nodal 1 TPTF Update for TAC January 4, 2007 Trip Doggett.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation Program Implementation Scenarios September 6, 2006.
Lead from the front Texas Nodal 1 TPTF Update for TAC June 26, 2008 Joel Mickey.
Lead from the front Texas Nodal 1 TPTF Update Trip Doggett.
Lead from the front Texas Nodal 1 TPTF Update for TAC Nov 2, 2006 Trip Doggett.
Protocol Revision Subcommittee Rob Bevill January 5, 2012.
Lead from the front Texas Nodal 1 TPTF Update Trip Doggett.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
February 27, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 4, 2014 TAC Update to RMS 1.
Protocol Revision Subcommittee Tom Burke April 5, 2012.
Lead from the front Texas Nodal 1 Integrated ERCOT Readiness and Transition (IRT) TPTF – December 4 th, 2006 ERCOT Qualification.
Lead from the front Texas Nodal 1 TPTF Update for TAC February 7, 2008 Trip Doggett.
Lead from the front Texas Nodal 1 TPTF Update for TAC September 4, 2008 Stacy Bridges
Lead from the front Texas Nodal 1 Nodal Transitional Qualification Approach to Qualifications for the Nodal Market August 16, 2007.
Lead from the front Texas Nodal 1 Texas Nodal EDS Market Trials Approach Wednesday, November 29, 2006.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
Lead from the front Texas Nodal 1 TPTF Update for TAC August 2, 2007 Trip Doggett.
January 3, 2008 TAC Meeting Texas Nodal Program Update Jerry Sullivan.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
1Texas Nodal NATF Readiness Update Vikki Gates May 4, 2010.
Technical Advisory Committee Presentation to the ERCOT Board of Directors July 15, 2008.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation Program MIS Web Portal Business Requirements Review Current.
Lead from the front Texas Nodal 1 TPTF Update for TAC October 2, 2008 Stacy Bridges
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
TPTF Update Trip Doggett TAC March 9, TPTF Update Meetings February 6 & 7, February 20 Attendance approximately 40 Completed review of ERCOT’s clarification.
1 Market Trials Update NATF January 5, 2010.
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
EDS 3 Release 5 SCED Testing Update - TPTF Daryl Cote August 28, 2007.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
Protocol Revision Subcommittee Tom Burke November 29, 2012.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
1 Readiness Scorecard – Market Readiness Series Brandon McElfresh Nodal Readiness and Transition January 28, 2010.
TAC Update Kyle Patrick. 2 Nodal ERCOT Program Update –Nodal Market Go-Live (Vote)- vote passed in which TAC certified full nodal systems for Dec 1, 2010.
August 11, 2008 TPTF EDS Sequence and Durations Discussion Daryl Cote.
TPTF Update for TAC October 5, 2007 Trip Doggett
Protocol Revision Subcommittee
Presentation transcript:

Lead from the front Texas Nodal 1 TPTF Update for TAC November 29, 2007 Trip Doggett

Lead from the front Texas Nodal 2 Agenda ItemDescriptionPurpose 1. Meeting SummarySummary of recent TPTF activitiesFor review 2. Next MeetingsUpcoming activitiesFor review 3. Approval of Readiness Metrics On November 9, TPTF endorsed ERCOT moving forward with metrics EMO1, EMO2, EMO5, EMO6, EMO7, EMO10, and EMO11 as modified by TPTF on November 9, 2007 in the Future Readiness Metric Inventory v1.03. The motion carried by roll-call vote with 100% in favor and one abstention (CPS San Antonio). The Consumer, Independent Retail Electric Provider (IREP), and Independent Generator Market Segments were not represented for the vote. On November 9, TPTF endorsed ERCOT deleting metric CRR1 and moving forward with metrics CRR2, CRR3, CRR4, CRR5, and MO4 as modified by TPTF on November 9, 2007 in the Future Readiness Metric Inventory v1.03. The motion carried by roll-call vote, with 100% in favor and two abstentions (TNMP and Exelon). The Consumer, IREP, and Independent Generator Market Segments were not represented for the vote. Request TAC Approval for ERCOT to move forward with deleting CRR1 and adding metrics CRR2, CRR3, CRR4, CRR5, EMO1, EMO2, EMO5, EMO6, EMO7, EMO10, EMO11, and MO4 For Vote 4. Approval of Milestones Request TAC acknowledge TPTF completion of the following Milestone– CRR Business Requirements v3.2 complete For Vote 5. Comments on PRR727 On 11/1/07, TAC referred PRR727, Process for Transition to Nodal Market Protocol Sections, to TPTF to consider the definition of the term “grave” as used in Section , Reinstatement of Zonal Protocol Provisions, and to refer two policy issues to TPTF: (1) consideration of a longer notice period in the event of a delay in nodal market implementation; and (2) consideration of how a reversion to zonal market systems should be limited by time and/or scope. On 11/26/07, TPTF voted to forward TPTF comments on PRR727 to TAC as modified at TPTF For Vote

Lead from the front Texas Nodal 3 Meeting Summary – November 5  Meetings November 5- 6 and November 9. (The November meetings will be summarized during the January TAC Meeting).  On November 5, TPTF discussed the following:  Nodal Program Update / Nodal Timeline Update  NPRR087, Market Monitor Terminology Change  NPRR088, Revision to , Monitoring of a Counter-Party’s Creditworthiness and Credit Exposure by ERCOT  Discussion of reasonability for Locational Marginal Prices (LMPs)  Market Information System (MIS) Update  Enterprise Data Warehouse (EDW) Update

Lead from the front Texas Nodal 4 Meeting Summary – November 6  On November 6, TPTF discussed the following:  COMS Update  Draft NPRR, Settlement of Power Imported via DC Ties (Back to Back Ties) and Block Load Transfer Under Emergency Conditions  On November 6, TPTF approved a motion to reject the draft NPRR for Settlement of Power Imported via DC Ties (Back to Back Ties) and Block Load Transfer Under Emergency Conditions. The motion carried by roll-call vote, with 100% in favor and three abstentions (LCRA, Austin Energy, and TNMP). All Market Segments, except Consumers, were represented for the vote.  Disposition of comments for the Draft PRR, EDS LFC Test Settlement  On November 6, TPTF approved a motion to endorse the draft PRR for EDS LFC Test Settlement, as discussed on November 6, for submission to PRS. The motion carried by roll-call vote, with 100% in favor and four abstentions (Calpine, Coral Power, Exelon, and BP Energy). All Market Segments, except Consumers, were represented for the vote.  White Paper, Details on the Settlement of Combined Cycle Plants  Plan to address TAC’s referral of PRR727, Process for Transition to Nodal Market Protocol Sections, to TPTF to consider the definition of the term “grave” as used in Section , Reinstatement of Zonal Protocol Provisions.

Lead from the front Texas Nodal 5 Meeting Summary – November 6 (continued)  On November 6, TPTF discussed the following:  CRR Project  Revised CRR Requirements  On November 6, TPTF approved the CRR Requirements v3.2, as modified by TPTF on November 6. The motion carried by roll-call vote, with 100% in favor and two abstentions (First Choice Power and Reliant). All Market Segments, except Independent Generators and Consumers, were represented for the vote.  Explanation of Market Submission/Retrieval Items  MMS Update  Revisions to Explanation of Market Participant Submission Items  Quality Center Update  Quality Center Dashboard  Trending of Test Data  EIP Project  On November 6, TPTF approved the EIP External Interfaces Specification v1.06. The motion carried by roll-call vote, with 100% in favor and one abstention (Reliant). All Market Segments, except Independent Generators and Consumers, were represented for the vote.  User Interface Subgroup Update

Lead from the front Texas Nodal 6 Meeting Summary – November 9  On November 9, TPTF discussed the following:  Review of Readiness Metrics:  EMO1, Network Security Analysis & Transmission Constraint Management  EMO2, Verify Voltage Support Functionality  EMO5, Verify ACE Performance  EMO6, QSE Response to Dispatch  EMO7, Verify Load Forecast Accuracy  EMO10, Network Operations Model and SE Performance  EMO11, Operating Personnel and Facilities Readiness  On November 9, TPTF endorsed ERCOT moving forward with metrics EMO1, EMO2, EMO5, EMO6, EMO7, EMO10, and EMO11 as modified by TPTF on November 9, 2007 in the Future Readiness Metric Inventory v1.03. The motion carried by roll-call vote with 100% in favor and one abstention (CPS San Antonio). The Consumer, Independent Retail Electric Provider (IREP), and Independent Generator Market Segments were not represented for the vote.

Lead from the front Texas Nodal 7 Meeting Summary – November 9 (continued)  On November 9, TPTF discussed the following:  Review of Readiness Metrics (continued):  CRR1, Develop CRR Test Plan  CRR2, Develop Transmission Congestion Right (TCR) to CRR Transition Plan  CRR3, Trial Operation of Monthly CRR Auction  CRR4, Implement TCR to CRR Transition Plan  CRR5, Trial Operation of Annual CRR Auction during Trials  MO4, Verify SCED Execution Quality  On November 9, TPTF endorsed ERCOT deleting metric CRR1 and moving forward with metrics CRR2, CRR3, CRR4, CRR5, and MO4 as modified by TPTF on November 9, 2007 in the Future Readiness Metric Inventory v1.03. The motion carried by roll-call vote, with 100% in favor and two abstentions (TNMP and Exelon). The Consumer, IREP, and Independent Generator Market Segments were not represented for the vote.

Lead from the front Texas Nodal 8 Meeting Summary – November 9 (continued)  On November 9, TPTF discussed the following:  Review of Readiness Metrics (continued):  E5, Nodal SAS 70 Preparedness  E12, Market Information System (MIS) Compliance Test  MP8, QSE, Adjustment Period & Real-Time Market MIS and Web Service Transactions  MP9, QSE Ability to Submit Web Service Transactions  MP10, Mapping Resources to Resource Nodes and Resources to Revenue- Quality EPS Meters is Complete  MP13, MP Completes EDS-4 Related Training  MP15, MP EDS-3 Trials Participation  MP17, MP Qualification Activities.  MP18, Mapping of Resources and Loads in Private Area Networks is Complete  MP19, Load Serving Entitles Engagement and Readiness  MP20, Standard Form Agreements Executed – Old E13

Lead from the front Texas Nodal 9 Next Meetings  Next meetings  Monday November 26 through Wednesday November 28  Monday December 3 and Tuesday December 4  Monday December 17 through Wednesday December 19

Lead from the front Texas Nodal 10 Next Meetings (continued)  On November 26-28, likely topics include:  Nodal Program Update  Nodal Timeline Update  Update on LFC Testing  PRR727, Process for Transition to Nodal Market Protocol Sections  NPRR089, Changing Posting Requirement of Certain Documents From MIS Secure to Public Area  NPRR085, Revision of Digital Certificate Procedures  Verifiable Cost Management System Requirements  Training Update  Review disposition of comments for the Training Course Curriculum v3.0  Quality Center Update  DC Tie Issues  Discuss issues regarding emergency power imports via DC Ties  Reconsider Draft NPRR - Settlement of Power Imported via DC Ties (Back to Back Ties) and Block Load Transfer Under Emergency Conditions

Lead from the front Texas Nodal 11 Next Meetings (continued)  On November 26-28, likely topics include:  PMO – Readiness Metrics Update  Consider approval for:  E5, Nodal SAS 70 Preparedness  E12, MIS Compliance Test  MP8, QSE Ability to Submit Transactions Via MIS  MP9, QSE Ability to Submit Web Service Transactions  MP10, Mapping of Resources to Resource Nodes and Resources to EPS Meters is Complete  MP13, MP Completes EDS-4 Related Training  MP15, MP EDS-3 Participation  MP17, MP Qualification Activities  Discuss revisions for the previously approved metric MP11, MP Registration Activities  Consider option of drafting specific readiness metrics for Load Serving Entities  Market Participation Qualification Checklist

Lead from the front Texas Nodal 12 Next Meetings (continued)  On November 26-28, likely topics include:  MIS Update  Review of MIS Portal Requirements updated through Baseline 2  Discussion of MIS support for EMS reports  EDW Update  Discuss flowchart for inputs to Nodal EDW Project Reporting Requirements  CRR Update  Review of disposition of comments for the CRR Explanation of Submission/Retrieval items  Review of updates to synchronize CRR Testing Market Participant Handbook with Readiness Metrics  Discussion of Draft NPRR for CRR Business Process  MMS Update  Review revisions for Explanation of Market Participant Submission Items  Review revisions for corrected SCED and Real-Time MMS Processes Requirements

Lead from the front Texas Nodal 13 Next Meetings (continued)  On November 26-28, likely topics include:  EDS Update  EDS 4 Approach Document  COMS Clarification Items  Review disposition of comments for Details on Settlements of Combined Cycle white paper  Update on Verifiable Costs  Nodal Verifiable Cost Implementation Plan White Paper v0.12  Verifiable Cost Manual v0.04

Lead from the front Texas Nodal 14 Approval of Readiness Metrics  On November 9, TPTF endorsed ERCOT moving forward with metrics EMO1, EMO2, EMO5, EMO6, EMO7, EMO10, and EMO11 as modified by TPTF on November 9, 2007 in the Future Readiness Metric Inventory v1.03. The motion carried by roll-call vote with 100% in favor and one abstention (CPS San Antonio). The Consumer, Independent Retail Electric Provider (IREP), and Independent Generator Market Segments were not represented for the vote.  On November 9, TPTF endorsed ERCOT deleting metric CRR1 and moving forward with metrics CRR2, CRR3, CRR4, CRR5, and MO4 as modified by TPTF on November 9, 2007 in the Future Readiness Metric Inventory v1.03. The motion carried by roll-call vote, with 100% in favor and two abstentions (TNMP and Exelon). The Consumer, IREP, and Independent Generator Market Segments were not represented for the vote.

Lead from the front Texas Nodal 15 Approval of Readiness Metrics (continued)  Request TAC approval for ERCOT to delete the metric:  CRR1, Develop CRR Test Plan  Request TAC approval for ERCOT to move forward with the metrics:  CRR2, Develop TCR to CRR Transition Plan  CRR3, Operation of Monthly CRR Auction and Allocation  CRR4, Implement TCR to CRR Transition Plan  CRR5, Operation of Annual CRR Auction and Allocation  EMO1, Network Security Analysis & Transmission Constraint Management  EMO2, Verify Voltage Support Functionality  EMO5, Verify ACE Performance  EMO6, QSE Response to Dispatch  EMO7, Verify Load Forecast Accuracy  EMO10, Network Operations Model and SE Performance  EMO11, Operating Personnel and Facilities Readiness  MO4, Verify SCED Execution Quality

Lead from the front Texas Nodal 16 TAC Approval of Milestones  On November 6, TPTF approved the CRR Requirements v3.2, as modified by TPTF on November 6. The motion carried by roll-call vote, with 100% in favor and two abstentions (First Choice Power and Reliant). All Market Segments, except Independent Generators and Consumers, were represented for the vote.  The Transition Plan says: “Any declaration of the accomplishment of a major milestone (business requirements, conceptual design, and successful completion of Market Participant testing) or a decision to proceed is contingent on the approval of both ERCOT and TAC.”  Request TAC acknowledge TPTF completion of the following Milestone –  CRR Business Requirements v3.2 complete

Lead from the front Texas Nodal 17 Comments on PRR727  On 11/1/07, TAC referred PRR727, Process for Transition to Nodal Market Protocol Sections, to TPTF to consider the definition of the term “grave” as used in Section , Reinstatement of Zonal Protocol Provisions, and to refer two policy issues to TPTF: (1) consideration of a longer notice period in the event of a delay in nodal market implementation; and (2) consideration of how a reversion to zonal market systems should be limited by time and/or scope  TPTF was asked to report on the definition of the term “grave” by the November 29 TAC Meeting.  A subgroup of TPTF held a conference call on November 14 to discuss the issue and develop suggested changes to PRR727.  TPTF will address the suggested changes during the November TPTF Meeting. Due to the notice requirements for this report, this will serve as a placeholder for the results of the November meeting.  On 11/26/07, TPTF voted to forward TPTF comments on PRR727 to TAC as modified at TPTF The motion carried by roll-call vote, with 100% in favor and one abstention (Coral Power). The Consumer Market Segment was not represented for the vote.

Lead from the front Texas Nodal 18 Comments on PRR727 (continued)  New :

Lead from the front Texas Nodal 19 Comments on PRR727 (continued)  Revised :

Lead from the front Texas Nodal 20 Questions