TBT 14: Permit Compliance HILLS’ ETHOS: IMPROVEMENT ENGAGEMENT PREVENTION ACCOUNTABILITY PROGRESSIVE FRONT FOOT ROLES AND RESPONSIBILITIES HWS – Toolbox.

Slides:



Advertisements
Similar presentations
ISO EMS OVERVIEW FOR CONTRACTORS
Advertisements

Environmentally sound management of ship recycling- simple or complex? Roy Watkinson Department for Environment, Food and Rural Affairs UK Promoting Sustainable.
EMS Checklist (ISO model)
Checking & Corrective Action
[Organisation’s Title] Environmental Management System
DEQ Mission By the end of the decade, Virginians will enjoy cleaner water available for all uses, improved air quality that supports communities and ecosystems,
Department of Environmental Quality Environmental Management System Overview.
Waste Management (Food Waste) Regulations 2009
Environmental Management System (EMS)
EPA EMS General Awareness Training Presented by David Guest, Esq. U.S. EPA Washington, D.C.
TBT 19: NUISANCES HILLS’ ETHOS: IMPROVEMENT ENGAGEMENT PREVENTION ACCOUNTABILITY PROGRESSIVE FRONT FOOT ROLES AND RESPONSIBILITIES.
MF Regulations & Separate Collections Linda Crichton.
GReening business through the Enterprise Europe Network EN Giovanni FRANCO European Commission Enterprise and Industry EN
Louisiana Department of EnvironmentalQuality LDEQ CAM Plan Overview LDEQ’s 27 th Annual Conference on the Environment Cajundome Convention Center Lafayette,
BRC Storage & Distribution Safety and Quality Management System Training Guide
TBT 15: ENVIRONMENTAL ACCIDENT PLANNING HILLS’ ETHOS: IMPROVEMENT ENGAGEMENT PREVENTION ACCOUNTABILITY PROGRESSIVE FRONT FOOT ROLES AND RESPONSIBILITIES.
Environmental Permitting Regulations Tom Fowler – Environment Officer
ENVIRONMENTAL MANAGEMENT SYSTEMS. ENVIRONMENTAL ISSUES Global Warming Climate Change Ozone Layer Resource Depletion Population Growth Waste Disposal Effects.
ISO General Awareness Training
Regulatory Body MODIFIED Day 8 – Lecture 3.
OHSAS 18001: Occupational health and safety management systems - Specification Karen Lawrence.
Environmental Awareness
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
Integrated Control of Industrial and Chemical Substances in Cyprus Integrated Control of Industrial and Chemical Substances in Cyprus Final Conference.
Hazard Analysis Critical Control Point (HACCP)
WASTE MANAGEMENT II WASTE REGULATION OFFENCES AND DEFENCES: CRIMINAL DUTY OF CARE ENVIRONMENTAL PROTECTION ACT (EPA) 1990 PART II ENVIRONMENTAL PERMITTING.
Risk Assessment – An Essential Standard
BRC Food Safety Quality Management System Training Guide
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
REVISED WASTE CLASSIFICATION AND MANAGEMENT SYSTEM FOR SOUTH AFRICA National Waste Classification and Management Regulations & Standards Stakeholder Workshop.
BAT as a main tool for minimisation of the negative impact of industrial activities Aivi Sissa Tallinn – Estonia 27 – 28 March 2008.
Ship Recycling Facility Management System IMO Guideline A.962
Energy & Environment Report for 2008 – 2009 Ian Rowe Manager (Health, Safety & Environment)
Occupational Health and Safety
Construction and Demolition Inert Processing Operations Compliance First: Evaluation of Solid Waste Facilities’ State Standards Training Provided By: California.
TBT 11: ROOT CAUSE ANALYSIS HILLS’ ETHOS: IMPROVEMENT ENGAGEMENT PREVENTION ACCOUNTABILITY PROGRESSIVE FRONT FOOT ROLES AND RESPONSIBILITIES HWS – Toolbox.
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
ISO OPERATIONAL CONTROL
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
Compliance Assurance and Title V Monitoring A Summary of the Rules and Applications Peter Westlin, EPA, OAQPS.
Fichtner Consulting Engineers UK Covanta Energy Ltd Content of Environmental Permit Application Nick Gamble.
Health and Safety Policy
Hazards Identification and Risk Assessment
TBT 16: MANAGING CONTRACTORS HILLS’ ETHOS: IMPROVEMENT ENGAGEMENT PREVENTION ACCOUNTABILITY PROGRESSIVE FRONT FOOT ROLES AND RESPONSIBILITIES HWS – Toolbox.
DRAFT Proposal for a European Directive on the Geological Storage of Carbon Dioxide Subject to modification on adoption by the Commission.
Implementing legislation for Integrated Permitting Monika Pribylova 1 October 2013 года Air Quality Governance in the ENPI East Countries.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
ISO MONITORING AND MEASUREMENT. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be.
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
Recommendation of the European Parliament and of the Council of 4 April 2001 providing for Minimum Criteria for Environmental Inspections in the Member.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
The Permitting Process under the Pollution Prevention and Control (Scotland) Regulations Ian Halliday Senior Policy Officer.
ISO Registration Common Areas of Nonconformances.
Checking and Corrective Action EPA Regions 9 & 10 and The Federal Network for Sustainability 2005.
What is Green List waste? A regulator’s perspective Fiona Donaldson National Waste Policy Unit SEPA.
OHSAS Occupational health and safety management system.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
Health & Safety Management “and a few other things for your consideration”
© Food – a fact of life 2009 Hazard Analysis Critical Control Point (HACCP) HACCP is a system which looks for and prevents potential problems before they.

Maintaining Safety Standards
Maintaining Safety Standards
Hazard Analysis Critical Control Point (HACCP)
Regional Workshop on e-waste
Training Appendix for Adult Protective Services and Employment Supports June 2018.
Aleksandra Antonowicz Green Federation GAJA/CCB
Tessa Bowering – SEO, Blandford Waste Team
CR-GR-HSE-414 HSE Requirements for Pipeline Operations
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Presentation transcript:

TBT 14: Permit Compliance HILLS’ ETHOS: IMPROVEMENT ENGAGEMENT PREVENTION ACCOUNTABILITY PROGRESSIVE FRONT FOOT ROLES AND RESPONSIBILITIES HWS – Toolbox Talk 14 Permit Compliance v

TBT 14: Permit Compliance 1. What is an Environmental Permit? An environmental permit is designed to protect the environment and people. It allows regulators to: concentrate resources on medium and high-risk operations; and protect the environment and human health. 1 of 15

TBT 14: Permit Compliance 2. When does a Permit apply? Applies to activities which could harm the environment or human health unless controlled Aims to: Protect the environment Deliver permitting and compliance effectively and efficiently Promote best practice Continue to fully implement EU legislation 2 of 15

TBT 14: Permit Compliance 3. Types of Permit A number of different types of EP exist Standard Bespoke Exemptions 3 of 15

TBT 14: Permit Compliance 4. General Management Typically condition 1.1 in an Permit The operator shall manage and operate the activities in accordance with a written management system Identifies and minimises all risks of pollution arising from activities on the site Operator must use technically competent persons and sufficient resources Maintain records to demonstrate compliance In a bespoke permit, this section may also include management plans for energy efficiency, accident management, raw materials use and waste minimisation. 4 of 15

TBT 14: Permit Compliance 5. Typical Management Plan Structure Contents, document review, introduction and summary of EMS are typical of an Management Plan. More specific information includes: Site location, description and facility overview –Receipt and storage of household waste –Receipt and storage of mixed recyclables –Loading and dispatch of waste and recyclables –Potential odour sensitive receptors Identification of odour sources and activities –Municipal ‘black bag’ household waste –Mixed recyclables – cans, glass bottles, paper, card and plastics –Loading and dispatch of waste and recyclables –Other potential odour sources 5 of 15

TBT 14: Permit Compliance Control Measures –Building design and odour suppression systems –Failure or abnormal event scenarios Management Controls –Responsible person –Meteorological conditions –Olfactory monitoring –Complaints monitoring –Records Monitoring –Control trigger levels –Compliance actions –Response to complaints –Detection of moderate odour during olfactory survey –Corrective action –Reporting The content of the Management Plan will change slightly depending on the permitted activity e.g. acceptance of hazardous waste, landfill activity etc. 6 of 15

TBT 14: Permit Compliance 6. Permitted Activities Typical condition 2.1 Tells you what you can and cannot do in relation to the site activities What waste types and quantities permitted on site The Operator is only authorised to carry out the activities specified in table 2.1 of the permit 7 of 16

7. Waste Acceptance Typical condition 2.2 Waste acceptance procedures must be written into the management system. This is found in Hills’ EMOP 09 - HRCs waste acceptance procedure Records must be kept of all wastes received on site in the form of a Waste Transfer Note (WTN) or Consignment Note (HWCN) (for Hazardous Waste if permitted). A WTN must be kept for two years A HWCN must be kept for three years 8 of 15 TBT 14: Permit Compliance

8. Operating Techniques Typical condition 2.3 The activities shall only be operated using the techniques and in the manner described in the permit. Specific to the activities stated. You can only carry out the activities listed in the permit. 9 of 15

TBT 14: Permit Compliance 9. The Site Typical condition 2.4 The green line on the site plan indicates what? Other criteria need to be met 10 of 15

TBT 14: Permit Compliance 10. Emissions and monitoring Typical condition 3.0 Sets out conditions relating to point source emissions Other typical emissions where limits may be set (usually requires a bespoke permit) include: VOCs, bio-aerosols, particulates, odour and noise, landfill gas, stack emissions. All should be monitored at regular intervals and controlled via management plans, if this is deemed necessary by the permit condition. 11 of 15

TBT 14: Permit Compliance 11. Information Typical condition 4.0 – broken into three sub-headings Records Typical condition 4.1 Records include site inspection forms, WTN/CN and those written in conjunction with Hills document control procedure/record procedure (EMCP 07 and 12). Reporting Typical condition 4.2 Quarterly and annual reports as specified in the permit. Amount and types of waste accepted/ transferred, monitoring results 12 of 15

TBT 14: Permit Compliance Notifications Typical condition 4.3 As per permit. Certain events need to be reported to EA within stipulated timeframes. Hills use procedure EMOP 06 – Schedule 6 and other Notifications to ensure these are undertaken appropriately. 14 of 15

TBT 14: Permit Compliance 12. Revision 1. What is an Environmental Permit? 2. When does it apply? 3. Types of Permit 4. Condition 1.1 – General Management 5. Management Plan Structure 6. Condition 2.1 – Permitted Activities 7. Condition 2.2 – Waste Acceptance 8. Condition 2.3 – Operating Techniques 9. Condition 2.4 – The Site 10. Condition 3.0 – Emissions and Monitoring 11. Condition 4.0 – Information including records, reporting and notifications 15 of 15

TBT 14: Permit Compliance Statistically, waste management and recycling has a very high accident rate Do NOT walk on by! Report accidents, incidents & near-misses! “See it – sort it” Do NOT become a statistic! HILLS’ ETHOS: IMPROVEMENT ENGAGEMENT PREVENTION ACCOUNTABILITY PROGRESSIVE FRONT FOOT ROLES AND RESPONSIBILITIES