The Caw Burn SUDS: performance of a settlement pond/wetland SUDS retrofit Kate Heal & Miklas Scholz University of Edinburgh Nigel Willby, University of.

Slides:



Advertisements
Similar presentations
SUDS Retrofits in Scotland
Advertisements

ENVE 420 Industrial Pollution Control EQUALIZATION Dr. Aslıhan Kerç.
An-Najah National University Civil Engineering Department
SUDS and Sustainability Kate Heal, University of Edinburgh Neil McLean, SEPA Brian D’Arcy, SEPA.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Northern Ireland Water QUESTOR Centre, QUB. Introduction: UK Water Industry 25 water companies in England & Wales 12 water and sewerage providers 13 water.
ADRICOSM-EXT PROJECT (ADRIatic sea integrated COastal areaS and river basin Management system pilot project - EXTension) WP2 – INTEGRATED CATCHMENT SIMULATOR.
Sovereign Waters Lake Management Plan Outcomes and Recommendations 9 May 2013.
Carnell. IEMA, Ireland Regional Event Are SUDS the Answer for Drainage? Dublin, 12th Dec 2007 “Filter Drains as a SuDS System” presented by Andrew Todd,
Treatment of Urban Water Runoff Biofiltration using a Bioswale Robert Ryan UC Santa Barbara 11/30/04.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Pond and Wetland BMPs, Retrofitting Detention Basins.
(Edinburgh-associated) Research Team Dr. Steve Wallis & Catherine Morgan (PhD student) (Heriot Watt University) Dr. Kate Heal & Alan Jones (PhD student)
Extensive culture: low intensity aquaculture providing only small increases over natural productivity. Extensive fish culture systems have low stocking.
Experience with SuDS in Dublin December 2007 Padraig Doyle Senior Project Manager Mott MacDonald Pettit IEMA Conference Are SuDS the answer for drainage?
Stevens-Rugg Brook: Diversion Structure Improvement Alternatives St Albans, Vermont.
26th Standing Conference on Stormwater Control, Dunfermline September 2004 Working Together - Implementing the DEX Drainage Master Plan Craig W Berry,
1 Water Services Planning J.McGowan Senior Engineer May 2014 Kildare County Council Water Services.
Channel Repair of Montezuma Creek in Coronado National Memorial following Fire and Flood Damage Stephanie Yard, P.E. & Allen Haden, Aquatic Ecologist Natural.
Constructed Farm Wetlands (CFWs) for remediation of farmyard runoff in Scotland: Water treatment efficiency, ecological value and cost-effectiveness Fabrice.
1 Massachusetts Wetlands Regulations and the MCP Rachel Freed Mass. Department of Environmental Protection Wetlands and Waterways Program Northeast Regional.
Constructed Wetlands for Feedlot Runoff Treatment MSAA Workshop February 2001.
Hydrologic Studies Unit Land and Water Management.
Wes Marshall, P.E. University of Connecticut May 2007 CE 276 Site Design Final Exam Outline.
SUDSNet Meeting 30 th November 2005 SEPA and SUDS Research Activities Neil McLean Brian D’Arcy.
Sanitary Engineering Lecture 16
Stormwater Infrastructure for Water Quality Management Dr. Larry A. Roesner, P.E. CE 394K.2 Surface Water Hydrology University of Texas, Austin April 8,
The situation in Norway concerning sediments/dredging Tore Lundestad, Port of Borg, Norway.
Ohau Channel Diversion Wall  Lake Rotorua experiences anoxic bottom waters and cyanobacterial blooms (Fig. 1A). Water from Lake Rotorua flows through.
Linking Sustainable urban Drainage Systems (SuDS) and ecosystem services: new connections in urban ecology Chunglim Mak 1, Philip James 1, and Miklas Scholz.
URBAN STORMWATER QUALITY AND LOAD ESTIMATION FROM URBAN RESIDENTIAL AREA IN SKUDAI, JOHOR, MALAYSIA Siti Nazahiyah Bte Rahmat Faculty of Civil and Environmental.
Low Flow Analysis & Water Use Plan Science & Community Environmental Knowledge Fund Forum June 10, 2004 Barry Ortman Diversified Technical Services Dawson.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
The Benefits of Storm Water Management and Design By Brian Tilley.
August 20th, CONTENT 1. Introduction 2. Data and Characteristics 3. Flood analysis 1. MOUSE 2. SOBEK 3. ARC-SWAT 4. Conclusions and suggestions.
Interim Headwater Drainage Feature Guideline: Protecting HDFs through Urbanization Laura C.R. Del Giudice, B.Sc., M.F.C., Senior Planning Ecologist.
Richard Jeffries and Roy Richardson Improving Scottish Rivers Proposals for delivery.
Stormwater 101 Ohio Lake Erie Commission Best Local Land Use Practices Kirby Date, AICP.
URBAN STREAM REHABILITATION. CASE STUDIES AESTHETICS SELECTION OF OBJECTIVES FOR REHABILITATION SCHEMES TECHNIQUES OF REHABILITATION SOCIAL APPRAISAL.
Standards for Ecologically Successful River Restoration Palmer et al., 2005, Standards for Ecologically Successful River Restoration Palmer et al., 2005,
Current condition and Challenges for the Future Report s (Scotland and Solway Tweed)
Oregon Case Studies Ryan Johnson. Studies  The response of impounded sediment to a culvert replacement project on Sutter Creek, a tributary of Honey.
NATURAL WASTEWATER TREATMENT  Pollutant removal by minimal energy utilisation and chemicals  Usage of natural processes (natural resources)  Low cost.
Urban Stormwater Retrofit Friendship Park – Winchester, VA K. Choi, K. Davis, and D. Laird Biological Systems Engineering, Virginia Tech Introduction Exposed.
Stormwater Retrofitting: The Art of Opportunity Prepared by the Center for Watershed Protection.
1 Evaluating and Estimating the Effect of Land use Changed on Water Quality at Selorejo Reservoir, Indonesia Mohammad Sholichin Faridah Othman Shatira.
Managing diffuse pollution from farmyards with wetlands: implications for water quality and ecology Caroline Coletto (now Enviros Consulting Ltd.) Kevin.
Stormwater Treatment and Flow-Control Requirements in Phase I and Phase II Municipal NPDES Permits Dan Cloak, Principal Dan Cloak Environmental Consulting.
Envirothon 2009 Spook Creek Area Presented By: Jakob, Will, Jamie, Meghan, and Teresa Spook Creek Area Presented By: Jakob, Will, Jamie, Meghan, and Teresa.
Developing a rapid assessment protocol for headwater drainage features Les Stanfield, Southern Science Information Section, MNR and Mari Veliz, Ausable.
- Aquatics - Presented by: Rick Pattenden Mainstream Aquatics Ltd.
Significant Water Management Issues (SWMI) – Update South Eastern River Basin District March 2007.
SANITARY ENGINEERING Planning, designing and installation of system for the collection, conveyance, treatment and disposal of the waste.
Current condition and Challenges for the Future Report s (Scotland and Solway Tweed)
URBAN HYDROLOGY. URBAN FABRIC RUNOFF PROCESSES AND DRAINAGE CHANNELS.
Providing Safe Waterfowl Feeding Habitat in Toxic Floodplains
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
Introduction to sustainable drainage
Georgia Agricultural Curriculum Office June 2011.
TRANSBOUNDARY WATERCOURSES IN THE UNECE REGION Guidelines to complete the information data sheet for transboundary rivers Finnish Environment Institute.
MELBOURNE HILL ROAD CATCHMENT DRAINAGE IMPROVEMENTS Reference Panel Meeting, 6 February 2014.
CWA AquaEnviro Conference (18-19 September 2012) An investigation in the hydraulic and treatment performance of vegetated SuDS Alexandros Tsavdaris (PhD.
Nwlpp Northumbrian Water Limited 9 October nwlpp Flooding - water company perspective Geoff Hartis Sewerage Operations Manager.
Hydrological changes resulting from dam construction
River Basin Planning & Flood Risk Management in Scotland
What is a rain garden? This presentation is designed to introduce the importance of rain gardens and explain how rain gardens function. Notes are included.
Welcome to the Stormwater & Sustainability Branch
15th of March 2006 Remediation of Agricultural Diffuse Water Pollution by Farm Ponds and Wetlands Fabrice Gouriveau PhD, School of GeoSciences Supervisors.
Stream Crossing Replacement Policy
Waterway Investment prioritisation
Presentation transcript:

The Caw Burn SUDS: performance of a settlement pond/wetland SUDS retrofit Kate Heal & Miklas Scholz University of Edinburgh Nigel Willby, University of Stirling Bess Homer, Scottish Water

Location of Caw Burn SUDS SUDS SEPA routine water chemistry monitoring site SEPA routine biological monitoring site Houston Industrial Estate Head waters of Caw Burn emerge from culvert To River Almond Edinburgh 20 km Acknowledgement: Digimap 1 km N

History of Caw Burn SUDS Early 1960s: work starts on Houston Industrial Estate Caw Burn headwaters culverted Diffuse urban pollution: oils, detergents, BOD, NH 4 -N Caw Burn = Class D river (Seriously Polluted) 1996: partnership agreement (Lothian Regional Council, East of Scotland Water, SEPA): –Caw Burn SUDS designed and constructed at cost of £50,000 –Sized to maximise land available –Discharge consent to East of Scotland Water 1997: SUDS operational Minimal maintenance

Caw Burn SUDS design Settlement pond 891 m 2 area; 600 mm max depth Min. retention time 24 minutes Coir booms Overland flow zone 4060 m 2 area; 800 mm max depth Min. retention time 12 minutes Gabion baffle wall (crushed rocks/concrete kerbstones

Caw Burn SUDS design: inlet 5 x 250 mm diameter pipes divert l s -1

Caw Burn SUDS design: outlet Caw Burn main channel Outlet swale from SUDS

Caw Burn Wetland & Catchment Improvements Project 2004 Stage 1: identify and cost structural & maintenance improvements in the Caw Burn SUDS likely to result in upgrading of water quality in Caw Burn to at least class B Specific objectives: –Comment on original design and current situation in relation to good practice guidelines, including CIRIA manual C521 –Assess nature and costs of maintenance needs and structural changes to wetland –Cost/benefit ratios for any suggested improvements to the wetland

Comparison of Caw Burn SUDS design with CIRIA guidelines

Dye tracer tests to determine current residence times 10 minutes 15 minutes 50 minutes

Current water retention times

Overflow from settlement pond Flow channelised in swale Preferential flow paths and overflows Short-circuiting from wetland into Caw Burn

Cawburn SUDS: water chemistry performance Meets conditions of discharge consent Mean water chemistry at SUDS outlet mainly class A2/B (Good/Fair)

Improvement in BOD in Caw Burn SUDS Class B Class C Class D

Improvement in biological quality of Caw Burn downstream of SUDS SUDS constructed Class B Class C Class D

Sedimentation and vegetation growth July 1998 May 2004 May 1998 Jan 2004

Sedimentation and sediment quality Sedimentation rate ~ 2 cm year -1 25% of settlement pond volume infilled with sediment since construction SEPA persistent pollutants urban rivers survey (2002): –PAH ratios indicate pollution source is oil spillages –total hydrocarbons highest in survey (3382 mg kg -1 dry weight) –sediment classified as Special Waste if excavated

Remedial work to the Caw Burn SUDS

SUDS extension Use rest of available land on valley floor New SUDS flooded to 1.5 m depth: Storage volume: 45 → 71 % of CIRIA guidelines Retention time: 3.1 → 5.0 % of CIRIA guidelines

Conclusions Caw Burn case-study highlights advantages & disadvantages of retrofit SUDS: –undersized (land area, cost, ownership (?) constraints) –significant benefits (water chemistry, improved diversity) Pragmatic, cost-effective measure Retrofit SUDS only one tool for addressing diffuse urban pollution Phase 2 of Caw Burn project: –reduce contaminant load to Caw Burn –Scottish Water has identified need for further investment