15 Sept 2009G. Rakness (UCLA)1 Paper progress On the Analysis Review Committee for the paper: “Performance of the CMS Cathode Strip Chambers with Cosmic.

Slides:



Advertisements
Similar presentations
Andrey Korytov July 2, Data Quality TB 2004 Andrey Korytov.
Advertisements

24 April 2007G. Rakness (UCLA) 1 Power cuts at Green Barracks/SX5 False fire alarms from the central fire alarm system (incendie central) cut power to.
22 May 2007G. Rakness (UCLA) 1 At minus-side slice test… Complete description of how to bring back slice test all the way from (power=off) to (local run=physics.
TMB-RAT Software Update USCMS Slice Test Rice University August 16, 2004 Martin Von der Mey / Yangheng Zheng* University of California, Los.
US FAST site EMU CSC test results – a global view from ROOT N. Terentiev (Carnegie Mellon University) Fermilab July 23, 2004.
CSC Synchronization Procedure and Plans CMS Endcap Muon FNAL October 29, 2004 Jay Hauser* / Martin Von der Mey / Yangheng Zheng University of.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
Preliminary Results from Structured Beam Test CMS Trigger Meeting June 3, 2003 Brian Mohr UCLA Dept. of Physics.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
TMB and RAT Status Report Endcap Muon OSU June 6, 2004 Martin von der Mey University of California, Los Angeles  Previous Status (OSU, April)
S. Durkin, USCMS-EMU Meeting, Oct. 21, 2005 Critical Data Errors S. Durkin The Ohio State University USCMS EMU Meeting, FNAL, Oct. 20, 2005.
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
20 Oct 2009G. Rakness (UCLA)1 Powering on… Last week: CMS off to give evaporation time to dry out the experiment Monday – Tuesday: Began powering on CSCs.
13 March 2007G. Rakness (UCLA) 1 Minus side slice test status Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
Debugging of M2-M5 G. Passaleva. 11/02/2009 Muon System mini review G. Passaleva 2 outline Short summary of Muon readout channel organization Connectivity.
Gregory PawloskiAugust 22, 2002 MPC Testing Progress.
Status of the CSC Track-Finder Darin Acosta University of Florida.
Update on the new reconstruction software F. Noferini E. Fermi center INFN CNAF EEE Analysis Meeting - 14/09/20151.
September 8-14, th Workshop on Electronics for LHC1 Channel Control ASIC for the CMS Hadron Calorimeter Front End Readout Module Ray Yarema, Alan.
Track-Finder Trigger at the Beam Test Results and Features Darin Acosta, Rick Cavanaugh, Victor Golovtsov, Lindsey Gray, Khristian Kotov, Alex Madorsky,
28 Jan 2009G. Rakness (UCLA)1/15 Overview of What Was Done Last Week… Worked with Alex M. to measure ALCT turn-on curves –See next slides… Obtained values.
Cover for special hardcover edition of Phys. Lett. B featuring CMS+ATLAS Higgs results 31 July 2012G. Rakness (UCLA)1 The articles were submitted today.
UCLA Group Meeting May 01, 2014 Andrew Peck Shayan Rastegari 1 Updates from Lab Andrew Peck & Shayan Rastegari May 01, 2014.
CSC Synchronization documentation Step-by-step procedure to… – Read out a chamber – Synchronize triggers from many chambers (and read out data) Description.
Since last meeting, no collisions LHC has been working towards increasing the intensity in single bunches towards achieving the 2011 integrated luminosity.
Various Wrote Run Coordination job description – Found this exercise to be useful as CSC Operations guy, so decided to do it as Deputy Run Coordinator…
Collisions… … with “non-stable beams” maybe on Thursday –Got experts to converge on goal and how to do it … to check timing, using L1 = zero-bias seeding.
Draft of talk to be given in Madrid: CSC Operations Summary Greg Rakness University of California, Los Angeles CMS Run Coordination Workshop CIEMAT, Madrid.
10/06/09 UCLA Meeting Hauser 1/14 really Various updates Update on LHC schedule: Beam to Alice starts ~Oct. 24. Not all sectors are cold. Circulating beam.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
CMS Latency Review, 13th March 2007CSC Trigger 1 Latency and Synchronization update.
Over the Last Couple of Weeks Gave talk at CMS Run Coordination Workshop –See Jay’s talk Two CSC Online computers have been replaced in the past two weeks…
13 March 2007G. Rakness (UCLA) 1 RPC efficiency in RAT Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
Andrew Peck 1 CSC OTMB Firmware Meeting February 21, 2014 ALCT/TMB/RAT Test Stand at CERN Setting up complete duplicate of the ALCT-TMB-RAT test stand.
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
22 Sept A slight reformulation of (ALCT) muonic timing… In terms of brass tacks.
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #12  PROGRESS  Connectorized RX, Connectorized TX, & TX/RX Combo tested using 100m cable  Unconnectorized.
CMS livetime during last week’s runnin 11 Sep 2012G. Rakness (UCLA)1 Fills  1.02/fb delivered, 0.98/fb recorded 96.1% live ~2.4% not running.
3 Nov 2009G. Rakness (UCLA)1 Weekend of 24 – 25 October Loaded all TMB firmware –Version 15 Oct 2009 XML file created using Jay’s muonic timing constants.
US AFEB timing in CSCs in splash events, run N. Terentiev, CMU CSC Synchronization meeting Nov. 16, 2009, CERN.
Recall: CFEB inefficiencies Collision Run June 2010G. Rakness (UCLA)1 validation/run135445/ExpressPhysics/Site/PNGS/hORecHits.png.
LHC CMS Detector Upgrade Project RCT/CTP7 Readout Isobel Ojalvo, U. Wisconsin Level-1 Trigger Meeting June 4, June 2015, Isobel Ojalvo Trigger Meeting:
10/20/09 UCLA Meeting Hauser 1/9 Various updates Update on LHC/CMS schedule: First shots into collimator: Nov. 7 and 8! Circulating beam ~Nov. 18, less.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
Introduction to Arduino A very basic intro to Arduino, the IDE and the Servos class.
111 State Management Beginning ASP.NET in C# and VB Chapter 4 Pages
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
Muon Trigger Performance Run12 PP510GeV Sanghwa Park (SNU/RIKEN)
Status at CERN 8 fills  ~500/pb since last Tuesday – ~5.3/fb delivered, ~4.8/fb recorded, … SEU workshop on Friday – Different detectors have different.
6 April 2007G. Rakness (UCLA) 1 CSC runs at minus side slice test 27 Mar – 5 Apr Color scheme: Successes Problems/questions Greg Rakness University.
Update on “Muonic Timing” of CSC Electronics
Recall: CSC TF Halo rate spikes during run (23 May)
904 Status Recall last Group Meeting…
Timing/Synchronization Status
CSC Synchronization Procedure and Plans
University of California Los Angeles
University of California, Los Angeles Endcap Muon Purdue
“Golden” Local Run: Trigger rate = 28Hz
Overview: Introduction to LHC Overview of CMS
University of California Los Angeles
Darin Acosta University of Florida
Analysis of Oct. 04 Test Beam RPC Data
Motifs across 4 heraldry books (More results)
CSC Turn ON Status Report by Fred B.
CSC Electronics Problem Report CSCE I&C
Presentation transcript:

15 Sept 2009G. Rakness (UCLA)1 Paper progress On the Analysis Review Committee for the paper: “Performance of the CMS Cathode Strip Chambers with Cosmic Rays” –Ugo Gasparini (chair) –Alberto Benvenuti –Greg Rakness Each member independently read the paper and sent comments to the committee –Many of the comments were common across ARC members –Today agreed on the set of comments to send to editors  comments to go out tomorrow…

15 Sept 2009G. Rakness (UCLA)2 New xml parameters added or moved Moved the following xml communication parameters within TMB code… alct_[rx,tx]_clock_delay, cfeb[0-4]delay –moved from DDD chip channels to phase shifter registers alct_posneg (this is functionally alct_rx_posneg) –moved from alct_stat_adr to phase shifter register Added the following parameters to the xml file… communication parameters: –alct_tx_posneg –cfeb[0-4]_rx_posneg TOF delay parameters –alct_tof_delay –cfeb_tof_delay –cfeb[0-4]_tof_delay Verified that they all get set at hard reset…

15 Sept 2009G. Rakness (UCLA)3 CFEB rx delay with new firmware Setting cfeb[0-4]_rx_posneg=0, cfeb_tof_delay=0 TimeDelay CFEB Id= CFEB Id= CFEB Id= CFEB Id= CFEB Id= Best value is cfeb0delay = 12 Best value is cfeb1delay = 11 Best value is cfeb2delay = 12 Best value is cfeb3delay = 13 Best value is cfeb4delay = 11 Good window width = 11nsec It works with CFEB pulsing

15 Sept 2009G. Rakness (UCLA)4 cfeb_tof_delay to cfeb[0-4]delay cfeb_tof_delay ddd_steps 12 nsec Relationship 2 ddd_steps ~ 4 nanoseconds, as expected...

15 Sept 2009G. Rakness (UCLA)5 Relation of cfeb[0-4]_tof_delay to cfeb[0-4]delay Now set... cfeb_tof_delay = 0 cfeb0_tof_delay = 0 cfeb1_tof_delay = 2 cfeb2_tof_delay = 5 cfeb3_tof_delay = 8 cfeb4_tof_delay = 11 Get best values of… cfeb0delay = 12  12 (TOF=0 value) + 0 nsec, as expected cfeb1delay = 15  nsec, as expected cfeb2delay = 22  is nsec, as expected cfeb3delay = 3  expected (13 + 8*4) % 25 = 10.. hmm, not quite. cfeb4delay = 8  is nsec, as expected

15 Sept 2009G. Rakness (UCLA)6 Relation of alct_tof_delay to alct_[rx/tx]_clock_delay Setting (alct_rx_posneg/alct_tx_posneg) = (0,0) alct_tof_delay alct_rx_clock_delay alct_tx_clock_delay ddd_steps 3 nsec 18 nsec Looks like the expected slope of 2 steps in alct_tof_delay ~ step of 4 nanoseconds... except for from alct_tof_delay 4  10. Are we running into funny business with the posneg here? There are some oddities about the looks of these windows.

15 Sept 2009G. Rakness (UCLA)7 Summary of communication windows vs. alct_tof_delay For the same cable length, different values of alct_tof_delay requires different combinations of (alct_rx_posneg,alct_tx_posneg) to get a large communication window (~90 spots). The value of pipe_depth where the data is OK depends on these posneg values. I would like to break apart the dependency of BC0 return on posnegs and the tof_delay.

15 Sept 2009G. Rakness (UCLA)8 Plan to check dependency on (rx,tx) posnegs… If the BC0 return delay is correlated to the value of pipe_depth (where the data is correctly looped back from the ALCT)… At 904: if we use tof_delay=0 and look at different combinations of (rx,tx) posnegs, the value of pipe_depth goes from 11 to 13. (2bx difference)  Should be visible in the bc0 delay…

15 Sept 2009G. Rakness (UCLA)9 Dependency on TOF… How about (rx_posneg,tx_posneg)=(1,0)? Let's see if we can measure rx,tx with a decent window size for all tof values... alct_tof rx tx pipe_depth window_size (rx x tx) x x x x x x x x x x x x x 9 Big enough size, but not much difference in pipe_depth… 

15 Sept 2009G. Rakness (UCLA)10 To do Dependency of BC0 delay on previous two slides… Write DPF contribution RPC efficiency in RAT …

15 Sept 2009G. Rakness (UCLA)11 Backup slide (scans with old firmware) Using May 2009 ALCT firmware 4 June 2009 TMB firmware

15 Sept 2009G. Rakness (UCLA)12 ALCT rx/tx scan Result (tx vs. rx) tx ----> ==== ==== ==== ==== ==== ==== ==== ==== ==== ==== ==== ==== ==== rx = rx = rx = rx = rx = rx = rx = rx = rx = rx = rx = rx = rx = Best value is alct_rx_clock_delay = 2 Best value is alct_tx_clock_delay = 12 Best value is alct_posneg = 0

15 Sept 2009G. Rakness (UCLA)13 CFEB delay scan *************************** Find cfeb[0-4]delay: *************************** TimeDelay CFEB Id= CFEB Id= CFEB Id= CFEB Id= CFEB Id= Best value is cfeb0delay = 6 Best value is cfeb1delay = 7 Best value is cfeb2delay = 7 Best value is cfeb3delay = 7 Best value is cfeb4delay = 8