Current status Arkadiy Klebaner November 21, 2012
ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Heat load study of cryomodule in STF
ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.
CRYOGENICS FOR MLC Cryogenic Cooldown Scheme Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
The ESS Cryogenics System J. G. Weisend II, P. Arnold, J Fydrych, W. Hees, J. Jurns, A. Lundmark, X. T. Su, X.L. Wang June 2015.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
CRYOGENICS FOR MLC Cryogenic Piping in the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
05 Novembre 2003Chamonix XIV Workshop, January How to deal with leaks in the QRL and magnet insulation vacuum Paul Cruikshank for AT/VAC Germana.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
1 ESS Cryogenic regulation loops proposal  Thermal shield  Power Couplers double-wall  CM cool down  Stand by and nominal operation  CM warm up Bertrand.
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
AT-ACR B. VULLIERMECSOC Meeting 29 September Cryogenics for LHC Test Benches Safety Aspects Overview of the Test Station Overview of the Operation.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
ESS Cryogenic Distribution System for the Elliptical Linac CDS Heat Loads Calculations Preliminary Design Review Meeting. 20 May ESS. Lund. Sweden.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
Overview of Main Linac Cryomodule (MLC)
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
General overview of WU : Cryogenic Distribution for Elliptical Linac Jarosław Fydrych Cryodistribution Project Engineer Preliminary Design Review,
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
PXIE Cryogenics Concept Arkadiy Klebaner Session 5 / WG1 (CW Linac and PXIE) October 26 th, 2011.
Modeling of the Cryogenic Distribution System Riccard Andersson (Part of) Master’s Thesis AD and ICS Retreat December 11, 2013.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Page 1 CRYOMODULE 650 (TESLA Style) Stand Alone Tom Peterson and Yuriy Orlov Collaboration Meeting 25 Jan 2011.
Overview of the ESS Linac Cryogenic Distribution System
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Chapter Editor: John Weisend TDR Chapter 6 Cryogenic System, Vacuum System & Test Stands.
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
ESS | Helium Distribution | | Torsten Koettig Linac – Helium distribution 1.
ESS Cryogenic Distribution System for the Elliptical Linac SV calculation approach Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J.
SIS 100 Vacuum chamber Recooler String system Components
Vishy Ravindranath LCLS-II 2 K Cold Box FDR March 9, 2017
LCLS-II Technical Requirements
Cryomodule test stand at ESS site
M Chorowski, H Correia Rodrigues, D Delikaris, P Duda, C Haberstroh,
IT-4189 Supply and installation of a cryogenic distribution system
at STFC Daresbury laboratory
HFM Test Station Main Cryostat
Proximity Cryogenics P&IDs meeting
Mechanical calculations of the CDS key elements
update on UT cooling system
The HIE—ISOLDE Cryogenic System, its Infrastructure and Considerations for Phase 3 O. Pirotte (TE/CRG)
2K Cold Box Process Design
Mathew C. Wright October 2016
ESS elliptical cryomodule
Jaroslaw Fydrych SHC Lead Engineer
Cryostats Some ideas for the new Q1 to Q3 Hi-Lumi WP3 meeting
Helium collector CFD analysis
CEPC-650MHz Cavity Cryomodule
Design of the cryogenic system of the CBM magnet
ESS elliptical cryomodule
WP11: CDS-SL CDR Overview
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
Overview of the TARGET Monolith Rough Vacuum
Presentation transcript:

ESS Cryogenic Distribution System for the Elliptical Linac MBL/HBL - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski

CDS-HBL-L4-010 The CDS for the elliptical linac (HBL and MBL) shall consist of a four-channeled vacuum- insulated cryogenic transfer line and cryogenic distribution line as well as four auxiliary process lines. The cryogenic distribution line shall include 30 valve boxes (21 for high beta cryomodules and 9 for medium beta cryomodules) CTL Aux. Lines Valve Box

CDS-HBL-L4-010 The CDS for the elliptical linac (HBL and MBL) shall consist of a four-channeled vacuum- insulated cryogenic transfer line and cryogenic distribution line as well as four auxiliary process. The cryogenic distribution line shall include 30 valve boxes (21 for high beta cryomodules and 9 for medium beta cryomodules) CTL Cold Box - ACCP

CDS-HBL-L The CDS for the elliptical linac shall allow for warming up and cooling down a single cryomodule, while keeping the rest of the system at cryogenic temperatures. 1.Usage of the CV05 and the CV62 valve for providing the warm helium during warm-up phase of the single CM 2.Usage of the CV06 and the CV63 valve for by- passing the helium vapor/gas return during warm-up and cool-down phases of the single CM

CDS-HBL-L The CDS valve box shall allow for transferring the required cooling power from the main headers to the cryomodule. 1.Requirement of the specific helium flow (up to 130 g/s) at the inlet to the CDS MC line from the ACCP side - ACCP-CDS-L4-070, 2.Limitation of the heat flux to the CDS MC process line by thermo- mechanical optimization of the pipe supports design and thermal insulation system design, 3.Specified helium mass flow from the CDL to the CM – 6.6 g/s for cooling down, 3.3 g/s for nominal operation 4.Requirement of the max. temperature in the BC Line as 5.2K – CDS-HBL-L4-050

CDS-HBL-L The CDS valve box shall allow for separating a related cryomodule from the cryogenic distribution line. 1.Dismountable design of the jumper connection, 2.Using of the cut- off valve at the lines connecting the CDS with the CM, 3. Application of the vacuum barrier in the jumper connection.

CDS-HBL-L Maximum temperature in the helium supply main and branch lines shall not exceed 5.2 K 1.Requirement of 4.5K temperature helium inlet to the He Supply line from the ACCP side ACCP-CDS-L Limitation of the heat flux to the CDS MC process line by the mechanical optimization of the pipe support system, 3.Thermo-mechanical optimization of the supports design and appropriate thermal insulation system design. 4.Requirement of the specific helium flow at the inlet to the CDS MC line from the ACCP side.

CDS-HBL-L , 070, 080, 090 Maximum allowable heat loads to the helium supply line including the main header and side pipes shall not be higher than 81.4 W Maximum allowable heat loads to the Very Low Pressure (VLP) line including the main header and side pipes shall not be higher than W Maximum allowable heat loads to the Thermal Shield (TS) supply line including the main header and side pipes shall not be higher than 42.7 W Maximum allowable heat loads to the Thermal Shield (TS) return line including main headers and side pipes shall not be higher than 2282 W See separate presentation

CDS-HBL-L4-100 Maximum allowable pressure drop in the Very Low Pressure (VLP) line including the main header and side pipes shall be not higher than 2.0 mbar at the total flow rate of 113 g/s at 28 mbar of operating pressure and 4.0 K of average operating temperature Calculation of the required cross-section area (diameter) of the VLP line with respect of allowed flow pressure drop.

CDS-HBL-L4-100 q m from SPK – 26 g/s q m from each CM – 2.9 g/s T in – 4.0K p out – 28 mabr CDL VLP size – DN200 CTL VLP size – DN250

CDS-HBL-L4-110, 120 The helium leak rate across the valve seat of each process valve shall not exceed 1*10E-4 mbar*l/sec at design pressure and room temperature against vacuum The helium leak rate across the valve seat of each safety valve shall not exceed 1*10E-4 mbar*l/sec at operating pressure and room temperature against ambient pressure He leak test certificate from the manufacturer

CDS-HBL-L4-130 All materials and components of the CDL placed in the linac tunnel shall tolerate the radiation dose of 5*10E5 Gy. 1.Appropriate material selection, 2.Teflon will be avoided, 3.The EDPM rubber gasket will be used for the warm vacuum flange connections

CDS-HBL-L4-140 Under cryogenic operating conditions, the measured integral helium leak rate into the insulation vacuum shall not exceed 5*10E-7 mbar*l/sec 1.Appropriate welding technique, 2.Non-destructive (X-ray, leak tightness) test after the weld realization

CDS-HBL-L4-150 Insulation vacuum pressure at ambient temperature with active pumping shall be not higher than 5*10E-3 mbar after a pumping time not longer than 96 hours 1.The CDS line supports design with respect of the gas molecular flow resistance lowering, 2.Selection of the main vacuum pump appropriative pumping speed, 3.Using the temporary vacuum pumps, if necessary, 4.Collaboration with ESS vacuum group in this task is agreed.