ICARUS Cold Vessels Thermal insulation Project progress report.

Slides:



Advertisements
Similar presentations
Dr. Ruth Collins TrinityHaus
Advertisements

Structural Steel Construction
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
Brief Introduction of 3D Construction System
Competency: Draw Wall Sections
Floors construction After the foundations have been completed and the external walls constructed the construction of the floors commences.
Ground-Supported Slabs • Exterior Flatwork
Lecture 2 SANDWICH COMPOSITES
The development of floors After the foundations have been completed and the external walls constructed the construction of the floors commences. There.
Tray Tools, Materials & Processes. The Pillar Drill can be used to drill wood, metal, and plastic. As a general rule the larger the hole you are trying.
Rosier Ph. – IPNO – Detector Dpt. – 27/05/2011APRIME HPS collaboration meeting 1/24 1- Vacuum chamber proposal 1.1- Stainless steel chamber design and.
Chapter 20 Cladding with Masonry & Concrete
Skilled Trades 1201 Floor Framing
Competency: Draw wall sections and details. Objective: Apply concepts of wood sill and floor construction.
 Building Walls  Wood Framed Walls  Precast Concrete Walls  Steel Framed Walls  Sustainable Walls.
Walls: Materials, Location, Load Bearing, Non-Load Bearing
Man-made Soft Wall Finishes Zainab Jhuthi B02/0895/2012 Naomi Wangari B02/52775/2012.
Floor Systems and Foundation Support
Prefabricated Timber Frame Construction
Foundations Mr. O’Rourke Construction. Definition the first piece of a home to be constructed and creates a base for the rest of a home's components.
Metals. In the Construction Industry we use metals in the many areas such as; Structural Claddings Architectural Systems Building Service.
Chapter 25 Framing Methods. 2 Links for Chapter 25 Balloon Framing Platform Framing Post-and-Beam Framing Related Web Sites Steel Construction Concrete.
Chapter 32 Floor Systems and Foundation Support. 2 Links for Chapter 32 Slab Construction Reinforcing Concrete Crawl Spaces.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
IPC-SM-782 Soldermask vs. Lands Only
UPDATE ON THE CRYOSTAT DESIGN AND INSTALLATION SEQUENCE.
Chapter 23: Structural Drafting
Possible types of module Si/W CALORIMETER CONCEPT Si/W CALORIMETER CONCEPT G.Bashindzhagyan Moscow State University June 2002 Internal structure (not in.
Albany Medical Center Patient Pavilion Albany, Ny Thomas J. Kleinosky – Structural Senior Thesis 2012 | Advisor: Dr. Hanagan.
FLOORS CONSTRUCTION After the foundations have been completed and the external walls constructed the construction of the floors commences.
Increase of the T600 maximum drift distance and preliminary considerations for larger aluminum vessels Claudio Montanari INFN-Pavia, Italy 1ICARUS Meeting.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
Unit 6: Building Technology in Construction Learning Outcome Understand the techniques used in the construction of superstructures for low-rise domestic.
Learning Outcome Lesson Objective
Learning Outcome Lesson Objective
Competency: Draw wall sections and details
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Glass Patio 51 Full glass balcony system
European cryogenic days Membrane cryostats for large volume neutrino detectors June 9 th, GENEVA.
Cavity Wall Construction
Leads Institute of Technology & Engineering
Common Components of a Traditional Wood Framed Building
Foundation – jay Desai.
Warm-up 9/20/16 What is the underlayment called below the shingles?
Common Components of a Traditional Wood Framed Building
OBJ: SWBAT create a CAD Rendering of a Utility shed.
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
BUILDING TECHNOLOGY IN CONSTRUCTION
Service channels between Tracker and PP1
Types of ground floors.
Contact Details EZ SIPS Corporation
Introduction Used for covering spaces in the form of roof or floor
Common Structural Forms
Competency: Draw wall sections and details
WELCOME.
EHN1 Neutrino Installation Plans
Warm-up 9/19/16 What template are we using?
Competency: Draw wall sections and details.
Facade Panes Dealers in UAE
Competency: Draw wall sections and details
Common Components of a Traditional Wood Framed Building
MATERIALS AND CONSTRUCTION I
Common Components of a Traditional Wood Framed Building
Direct Bond – Dry Lining to Masonry Backgrounds
Common Components of a Traditional Wood Framed Building
Neutron guide Shielding Concept
Common Components of a Traditional Wood Framed Building
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Work Unit AIK 11.2 CDR of the CDS-SL Mechanics
What We Do Hillphoenix, a leading industry innovator has dedicated the necessary resources to develop a new Walk-Ins Division. The result, Hillphoenix.
Presentation transcript:

ICARUS Cold Vessels Thermal insulation Project progress report

The Cold Vessels and thermal insulation of ICARUS, which is running (successfully) to day in LNGS, will not be re-used at CERN for several (good) reasons. These fundamental parts of the detector are designed ex-novo by external specialists. Mechanic structures: A. Castellani Thermal Insulation: GTT The good integration of their projects and the technical performances control is crucial and is our job.

Typical vessel transversal section (1-1).

Wall and corner aluminium alloy extruded shapes.

Corner assembly.

Top wall.

Removable end cap.

CONFIDENTIAL Stainless steel corrugated membrane 304 L – 1.2 mm Primary Barrier Plywood Reinforced polyurethane foam Composite material Secondary Barrier Concrete wall covered with a moisture barrier Mastic Plywood Standard components Industrially pre-fabricated by independent suppliers One block Pre- fabricate d panels Pre- fabricated membrane sheets Insulation in TPS (1) areaInsulation above 5m height (1) Thermal Protection System Containment Detailed Description

CONFIDENTIAL Plywood boards 1m wide by 3m long Typical range of thicknesses : between 250 to 350mm Insulation layer Secondar y barrier Metallic component onto which the primary barrier is welded Plywood boards Flat panel with TPS* Flat panel without TPS* *Thermal Protection System Modular Insulating Panels

CONFIDENTIAL Tight Secondary Barrier Tight Primary Barrier Continuity of the Secondary Barrier by bonding Closed primary space Closed secondary space Design Concept at TPS Level

CONFIDENTIAL Liquid tight Primary Barrier Primary space (Only one space) Design Concept Above TPS level

ICARUS

Conclusion Last Monday we met at CERN representative of both Parts and we organised together with them the future work, based on the present results. The principal open problem was the mechanical project of the supporting system of vessels into the thermal insulation, ensuring the requested rigidity, but reducing thermal bridges. Another important option was the definition of the thickness of the insulating material vs the requested performances (10 W/m2); such a value will be guaranteed with 60 cm thickness on the bottom and 40 cm elsewhere.