Bainbridge Island School District 303 September 2015 MASTER PLAN.

Slides:



Advertisements
Similar presentations
Bond Program Planning Imperatives Study Session October 12, 2004.
Advertisements

Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1.
FACILITY PLANNING October 1, :00 PM – Raymond School Tour 6:30 PM – Interactive Workshop Raymond Community Workshop.
Washtenaw County Strategic Space Plan Recommendations November 1, 2006.
Del Mar Union Schools Facilities Master Plan Update September 19, 2012.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
 Mechanical  Electrical  Safety/Security  Video surveillance  Fire safety  Access control  Enhanced Programming  Roofing/Structural/Site Work.
Remsenburg – Speonk Union Free School District Elementary School Bond Planning Presentation October 12, 2010 BBS Architects and Engineers and Triton Construction.
Glenbard Township High School District 87 Facility Master Plan Steering Committee July 20, 2011.
UNIT 5 REDISTRICTING COMMUNITY FORUM mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm.
Church Renovation/ Expansion Proposals Willowdale.
FBCLS Facilities Master Plan September 14, Future Planning Team Dave Esely Sheryl Franke Bud Hertzog Blake McKinney Wendell Shaffer Sara Taylor.
Proposed Budget Presentation APRIL 21, 2015.
BVUSD Facility Workshop September 17, Board Policy-BP 7110 The Board of Trustees recognizes the importance of long-range planning for school facilities.
Planning for Secondary Growth DIPBLE nvironments CCRCTEL earning 2014RISDF lexible September 22, 2014.
C APITAL I MPROVEMENT PROGRAM FY 2015/16 – FY 2020/21 August 14, 2014.
Long Range Facility Planning assisted by Silver Falls School District.
School district April 2013 Vision117 Community Presentation PHASE II Vision117.com school district.
2013 Bond Task Force Proposal Presentation & Proposal by Cory Baker Director Scottsdale Center for the Performing Arts 3 Vice President Scottsdale Cultural.
Congregational Informational Meeting May 23, 2011 Statesboro First United Methodist Church.
PISD High Schools: A Vision and Plan for the Future March 22, 2012 Board Presentation.
Missoula County Public Schools Overview of Planning January 2014.
Jan 31, 2005 Community Update. Jan 31, 2005 Thanks to the voters… Measure R passed with over 63% of the vote $3.87 billion for “the Safe and Healthy Neighborhood.
More Seats for Students History of Tuckahoe Capacity and APS Actions.
Torrance Unified School District Bond Measure Y Bond Measure Z Quarterly Construction Update September 30, 2009.
Our Summer Vacation Capital Projects Our Summer Vacation by Tamela, John, Dianne and Carrie Capital Projects Our Summer Vacation by Tamela, John, Dianne.
Recommended Actions for Statements of Interest Prioritized by School Districts Board of Directors Meeting November 28, 2007 Treasurer Tim Cahill, Chair.
Designing and Programming Schools As Community Learning Centers Firestone/Litchfield Community Learning Center Community Update September 27, 2011 Community.
High School Task Force DECATUR PUBLIC SCHOOLS 02/03/2009.
 2012 MAHLUM ARCHITECTS INC Bainbridge Island School District Master Plan Update 27 August 2015 School Board Meeting.
Carroll County Public Schools Board of Education Work Session August 27, 2014 FY 2016 Capital Budget and FY 2017 – FY 2021 Capital Improvement Program.
Kingsclear Consolidated School Parent / Community Meeting November 29, 2010.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
Eden Central School District Board of Education Meeting Eden CSD 2020 Project Update September 16, 2015.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
Sandusky City Schools’ Transformation Sub-Committee “The Future of School Facilities” Briefing Document for Community Forum.
TROY ISD Long Range Facilities Planning Committee Safety and Security.
Advocacy: Influencing Facility Development in Public Parks and Recreation Departments Tennis advocacy should occur year round through informal communications.
Successful Bond Programs (Community Engagement) Cathy Allen, Chief Operations Officer Facilities Support Services September 22,
Master Plan 2015 Bainbridge Island School District Master Plan :: Update 28 May 2015.
Master Plan Update February 4, 2015 Georgetown University Hoya Roundtable Student Engagement.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District January 23, 2012 EDUCATE  ENGAGE  EMPOWER 1.
Return site to its rightful glory with cleaner water and more enjoyable experience Propose appropriate additions and renovations to pool, buildings and.
Maintenance & Operations Replacement Levy and School Improvements Bond Election Day: February 9, 2016.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 14, 2011 EDUCATE  ENGAGE  EMPOWER 1.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
Photos by Susie Fitzhugh Bell Times Analysis Task Force Review, Update and Recommendation Subgroup 5/14/2015.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Palisades Middle School: Fitness Center Board Presentation April 20, 2016.
Lincoln Public Schools Lincoln, Nebraska Lincoln Public Schools Work Session 10-Year Facility and Infrastructure Plan Update October 22, 2013.
Wahoo Public School District Facility Planning Update April 18, 2016.
FY2017-FY2026 GDRSD Capital Plan-June 22, 2016 Jared Stanton, Director of Business and Finance.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education Update August 28,
MASON PUBLIC SCHOOLS Bond Committee Meeting #1 August 9, 2016.
Capital Facilities Program Update San Rafael City Schools
Proposed School Bond Referendum September 26, 2017
4 November 2013 LEHIGHTON AREA SCHOOL DISTRICT.
FIVE YEAR CAPITAL FACILITIES PLAN (Five Year Plan)
UNION GROVE ELEMENTARY REFERENDUM
Wauwatosa School District
Facilities Modernization Program
Update to Board of Trustees: November 9 FAC Meeting
Building & Property Committee
Capital Outlay Workshop
Pillager Public School District Community Survey Results
Master Facilities Committee Evaluation and Identification
Chimacum District Facility & Program Plan
Community Forum March 18, 2019.
Zumbrota-Mazeppa School District Community Survey Results
Presentation transcript:

Bainbridge Island School District 303 September 2015 MASTER PLAN

History: The Master Plan – Facility Master Plan (long range 15+ yr.) facility planning document Recommendations Address district-wide health, life-safety and infrastructure issues Address unhoused classroom and shortage of basic core facility needs at BHS Replace Wilkes Elementary School Replace Blakely Elementary School Replace BHS 100 Building including performance space Replace Ordway Replace Commodore 2006 – Capital Bond BHS 200 Building replacement Essential renovations district-wide (asset preservation and postpone, patch and repair) 2009 – Capital Bond Wilkes Elementary School replacement Essential renovations district-wide (asset preservation and postpone, patch and repair)

The Master Plan Update – Study and Survey conducted by Hutteball & Oremus Architects Findings: In accordance with OSPI methodology, four buildings were identified to be in poor condition: Blakely Elementary BHS 100 Building Ordway Elementary Commodore 2015 – Facility Master Plan update facilitated by Mahlum Architects Master Plan committee recommendations: Address district-wide health, life-safety and infrastructure issues Replace Blakely Elementary School Replace BHS 100 Building including performance space Replace Ordway Replace Commodore Spring 2015: 2015 Master Plan Committee presents report and recommendations to BISD Board of Directors, outlining facility needs, timeline estimates and cost implications. Summer 2015: BISD Board gives direction to engage community in discussion about options to replace Blakely Elementary and BHS 100 building.

Blakely Elementary Facts: Constructed in 1965; two additions in 1989 and ,505 sf (model program requires 65,150 sf) Summary of Study & Survey Findings: 50+ years old Limited opportunities for alternative educational delivery Mechanical, plumbing and electrical systems are beyond their useful life Limited natural daylighting Structurally overstressed; deficiencies in seismic-load handling capabilities Inadequate ADA/accessibility No sprinkler system Interior wall finishes, floors, ceilings and hardware are in need of replacement Conflicts between buses, loading and unloading and pedestrians Options: Short-term immediate need for Postpone, Patch and Repair (unsustainable): $3.95M (+ $1.5M in systems that cannot be physically supported with current structure) Modernize existing building: $38.15M New building: $38.96M

BHS 100 Facts: Constructed in ,509 sf (model program requires 19,929 sf classroom + 22,971 sf theater = 42,900 sf) Summary of Findings: 45+ years old Limited opportunities for flexibility in educational delivery Mechanical, plumbing and electrical systems are beyond their useful life Limited natural daylighting Structurally overstressed; deficiencies in seismic-load handling capabilities Inadequate thermal insulation/single-pane windows Roof is past its serviceable life and in need of replacement No sprinkler system Interior wall finishes, floors, ceilings and hardware are in need of replacement Water infiltration in below-grade areas LGI exterior canopy is beyond serviceable life Options: Short-term immediate need for Postpone, Patch and Repair (unsustainable): $7.18M (+$1.27M in structural upgrades that may not be feasible) Modernize existing building (unsustainable): $15.38M (+ $1.27M in work that may trigger additional costs due to structural deficiencies) New building option A: $27.02M(w/600 seat ¾ theater) New building option B: $24.3M (w/ seat ¾ theater) New building option C: $13.75M(w/black box seat)

2015 Master Plan Summary 4 buildings need replacement Blakely and BHS 100 initial focus Ordway and Commodore All bond requests will include funding for asset preservation and essential postpone, patch and repairs Several community forums will be held prior to board decision

Programming Meetings Blakely September 15 th - school tours September 16 th – school tours debrief September 17 th - staff update BHS 100 Building Programming Meetings Special Education Performing Arts CTE/100 Building Ordway and Commodore All bond requests will include funding for asset preservation and essential postpone, patch and repairs Several community forums will be held prior to board decision

BHS 100 :: Ed Spec Planning Session Special Ed 15 June 2015 Key Points of Discussion: Adjacency and grouping of SPED classrooms important considerations; goal is to be integrated not separated If the 100 Building is CTE-focused, should SPED be grouped in another building? When would a move be appropriate for SPED? Whatever the location, SPED should be permanent, not temporary space awaiting a final home SPED needs to feel included in process Conversations should continue to include additional staff participation

BHS 100 :: Ed Spec Planning Session Performing Arts 08 September 2015 Key Points of discussion: LGI is not appropriate for drama; need flexible space BHS would love to expand drama offerings, current facilities are inflexible LGI does not allow enough seating for a graduating class Theater equipment is in poor condition at best “Nothing about the current facility is a magnet for performing arts” Insufficient space for current Band enrollment—enrollment goal is nearly twice that amount—Band does not perform in LGI as it is inadequate in size, space or sound quality Adjacency to stadium causes sound and accessibility issues when both facilities are in use 600 seats is too large; a consensus of seat facility with flexibility to adjust to varying performances and audience sizes Consider adjacency to BHS Campus-transition between classes Future trend toward increased focus on video production arts versus live-performance arts

BHS 100 :: Ed Spec Planning Session CTE 09 September 2015 Key points of discussion: Large open and visible work spaces that can accommodate varying programs—not “my room” but “our facility” Adjacency to truck loading areas important to most programs Storage-storage-storage needed (large, medium and small scale) for all programs to allow flexibility and multiple uses Opportunities for community use of space Quality natural and artificial lighting Indoor air quality is important Potential connections to nature for a farm to table program-culinary arts Opportunities for flexible infrastructure and open spaces for diverse programs (robotics, painting, culinary arts, etc…) Adjacency and visibility to rest of campus, ”what are they doing over there”—inspire curiosity Opportunities to collaborate with Rotary and like with CTE programs Base design on current program and flexibility for future programs (sustainable design) Opportunities for community partnerships (internships) is limited compared to other communities; focus more on on-campus classes Complimentary program adjacencies

Community Forums Blakely September 21st ~ 7:00 p.m. BHS September 15 th ~ 7:00 p.m. September 30 th ~ 7:00 p.m. Community forums are currently being scheduled for: Commodore Ordway Woodward Sakai Wilkes