Research and Development for The Auger Observatory Peter O. Mazur Director’s Review December 15, 2011 1.

Slides:



Advertisements
Similar presentations
1 | M. Sutter | IPE | KIT – die Kooperation von Forschungszentrum Karlsruhe GmbH und Universität Karlsruhe (TH) Michael Sutter H.-J. Mathes,
Advertisements

Investment Com. GIC To Enrich Life Through Communication.
IBM Software Group ® Integrated Server and Virtual Storage Management an IT Optimization Infrastructure Solution from IBM Small and Medium Business Software.
UNO R&D and  UNO Possible early use of Henderson Upper Campus UNO collaboration has submitted an R&D proposal covering Excavation R&D of large caverns.
Joint Research: UCI ISR-Boeing Anaheim Engineering Software Architecture-Based Development of Product Lines for the Software-Defined Radio Domain Richard.
The Pierre-Auger PMT Test Stand Chris Jillings Feb 6, 2002.
Stakeholder Meeting July 11, 2012 MSHA Headquarters Arlington, VA New Technologies For Mine Rescue.
LI Gain Curves Peter Litchfield Calibration Workshop, 6 th September 2005  Beginning to understand the LI system  Beginning to understand the software.
The Pierre Auger Observatory Nicolás G. Busca Fermilab-University of Chicago FNAL User’s Meeting, May 2006.
Future Plans at the Pierre Auger Observatory Lawrence Wiencke Colorado School of Mines Apr , Cambridge 1.
April 26, 2007 Rolf Nahnhauer IceCube Spring Meeting 1 IceCube Digital Optical Module Production R. Nahnhauer DESY.
Large Magellanic Cloud, 1987 (51.4 kparsec) SN 1987a after before 2006 Hubble.
Solving the Mystery of the Ultra-High Energy Cosmic Rays The Pierre Auger Observatory Pablo Bauleo Physics Department Colorado State University Fort Collins.
The Highest Energy Cosmic Rays Two Large Air Shower Detectors
CAD/CAM Design Process and the role of CAD. Design Process Engineering and manufacturing together form largest single economic activity of western civilization.
AN Surface Detector Communication Team 27 May, RT Lisboa Hard Real-Time Wireless Communication in the Northern Pierre Auger Observatory Roger.
Redesign of a Submersible Autonomous Data Collection and Transmission System (S.A.D.C.A.T.S.) Group Members: Matthew Rhoads BS ME (Lead) - Ballast, Hull.
Auger Project Management H. Glass Director’s Review15-Dec-2011 Fermilab (Technical Division) has hosted Auger Project Management office since collaboration.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Cooling Update (May 2011) Tim. Overview From last time – Estimate Power Loads Active components Extraneous heat sources – Develop methodology for exploring.
S. J. Sciutto (Auger Collaboration) - LISHEP2004, Rio de Janeiro, February International data management: The experience of the Auger Collaboration.
Solar Energy: The Ultimate Renewable Resource. What is Solar Energy? Originates from nuclear fusion reactions in the sun Originates from nuclear fusion.
Tank Insulation Requirements Some work was done in the past by the Thermal Modeling Subtask (Armando Ferrero and Bob Ristinen, leaders) but this needs.
PV System Components Advanced Engineering The Technology Landstown High School.
ACCESS CONTROL ExpansE - Distributed Access Control.
Experimental Facilities DivisionOak Ridge SNS INSTRUMENTS OVERVIEW R. K. Crawford Instrument Systems Senior Team Leader September 10, 2004 HYSPEC IDT Meeting.
Dominik Wermus (Virginia Military Institute, Lexington, VA 24450), Doug Higinbotham (Thomas Jefferson National Accelerator Facility, Newport News, VA,
Cosmic Rays: Ever Present and Useful Anthony Gillespie Denbigh High School Mentor: Dr. Douglas Higinbotham Cosmic Rays Using the Cosmic Rays Current Research.
Presented for Arnulfo Zepeda On behalf of the Mexican Collaboration Sep PHYSICS AND ASTROPHYSICS OF ULTRA HIGH ENERGY COSMIC RAYS BUAP CINVESTAV.
Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, WPM & HLS Status and Schedule Franz Peters, Georg Gassner.
Computer Engineering Department College of Computer Sciences and Engineering.
GEOGRAPHIC LOCATION OF THE PIERRE AUGER OBSERVATORY Northern Hemisphere: Millard County, Utah Southern Hemisphere: Malargüe Mendoza Province Argentina.
, A possible origin of ultra-high energy cosmic rays: collisions of two galaxies The main goal of the Pierre Auger Project is a detailed study of the energy.
CRISP & SKA WP19 Status. Overview Staffing SKA Preconstruction phase Tiered Data Delivery Infrastructure Prototype deployment.
CEDAR PMT Array DCS (Tim). Summary Summary of DCS monitored parameters based on original scheme – Major part of heat dissipation in electronics / PMTs.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
2010 Regional Intelligent Transportation Systems Plan: 2015 Progress Report on Implementation.
F DOE Annual Program Review Pierre Auger Project (E881) Peter O. Mazur.
Claudio Di Giulio University of Roma Tor Vergata, INFN of Roma Tor Vergata IDAPP 2D Meeting, Ferrara, May The origin and nature of cosmic rays above.
Energy Spectrum C. O. Escobar Pierre Auger Director’s Review December /15/2011Fermilab Director's Review1.
CEDAR Support Structure Peter Sutcliffe 24 th January 2011.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
Jan 16, 2004Tom Gaisser 1.3 Cost & schedule review The IceTop component of IceCube Area--solid-angle ~ 1/3 km 2 sr (including angular dependence of EAS.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
P.Auger, a major step: Need high statistics large detection area : 2 x3000 km² Uniform sky coverage 2 sites located in each hemisphere Argentina and USA.
1 US Cost & Schedule Summary W. R. Edwards US Project Manager CD-2/3a Review January 8, 2008 BNL.
David Seckel, IceTop Baseline Review, Madison, Dec. 4, 2003 IceTop Baseline Review Dec. 4, Madison WI.
Over 28 Years of Machine Tool Monitoring Expertise.
Pierre AUGER Observatory Jan Ridky Institute of Physics AS CR For Pierre Auger collaboration.
The Auger Observatory for High-Energy Cosmic Rays G.Matthiae University of Roma II and INFN For the Pierre Auger Collaboration The physics case Pierre.
Production PMT Testing and Work on Site with Prototype Tank University of California, Los Angles Department of Physics and Astronomy
Where do ultra-high energy cosmic rays come from? No one knows the origin of ultra-high energy cosmic rays. The majority of low-energy cosmic ray particles.
5 June 2002DOM Main Board Engineering Requirements Review 1 DOM Main Board Software Engineering Requirements Review June 5, 2002 LBNL Chuck McParland.
FPD STATUS Carlos Avila Uniandes/UTA 1. FPD overview 2. Roman pot and detector status 3. FPD readout integration status 4. Software status 5. Stand-alone.
Geant4 Simulation of the Pierre Auger Fluorescence Detector
September 16, 2005VI DOSAR – IFUSP/IFT – Philippe Gouffon Auger Project Computing Needs The Pierre Auger Observatory Auger data and processing Auger data.
David Nitz Michigan Technological University Instrumentation for the Northern Site of the Pierre Auger Observatory 1 1Instrumentation for the Northern.
Enhancements to the Observatory: HEAT and AMIGA Peter O. Mazur Director’s Review December 15,
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
R. Kluit Nikhef Amsterdam ET Nikhef Electronics Technology TGL Ruud Kluit 118-Apr-16.
TOF Emittance Emittance measurements with the TOFs Mark Rayner 4 December 2008.
LIU Wire Scanner Milestones June 2017
Pierre Auger Observatory Present and Future
Auger Northern Observatory
Enabling System Elements
The Cosmic Ray Observatory Project (CROP) in Nebraska
SD Manufacturing, Assembly and Deployment in SE Colorado
Use Case for controlling the Pierre Auger Observatory remotely
Colorado Space Grant Consortium
Presentation transcript:

Research and Development for The Auger Observatory Peter O. Mazur Director’s Review December 15,

The Research and Development Array (RDA) Begun to develop technologies for a possible Auger North. When Auger North became improbable, a substantial investment had already been made by many countries. The RDA was refocused to advance the goals of Auger in Argentina and prepare for possible future enhancements to it. Items exclusively valuable for Auger North were dropped, e.g., development of thermal insulation systems for the water tanks. 2

RDA Objectives Develop a new Communications system (most important) – A new Auger Comms system is required for the new Enhancements. Although Comms refinements are in progress for the Enhancements, this could provide a backup. – Provides a capability for other, newer options. Develop new electronics – New electronics for single PMT, with better dynamic range, faster ADC, better calibration software and hardware. Develop new SD with a single PMT – Tank designed with a central hatch. – Tank structure needs to support a taller mast for the RDA – New PMT enclosure, better seals for reduced corrosion probability Test new solar power system components – 12 V system – New VRLA-AGM type battery 3

The RDA in Southeast Colorado The RDA consists of: 10 tanks 7 standalone communications masts 4 towers, including a concentrator Deployment status All SDs deployed with power system Electronics tested on one tank Electronics ready at Mines All masts deployed with power system All towers deployed with power system 4

5 Surface Detector with three hatches for three PMTs. RDA Surface Detector For a single, central PMT

6 RDA Surface Detector. Note extra tall communications mast.

7

Fermilab Participation All involved in design and planning for the RDA. Peter Mazur and Carlos Escobar developed and procured tanks. (Made in Brazil.) Peter Mazur (and PPD FEA engineer and drafter) designed tanks, brackets and masts, standalone masts. POM also designed solar power system. Peter Mazur involved in assembly and deployment. Peter Kasper adapted Auger central data acquisition system for RDA use. Fermilab Group standing by to support RDA operations as needed. 8