Difficulties in Verification of a PoA: DOEs Perspective by Dr. Kaviraj Singh Workshop on Programme of Activities (PoA) under the CDM: Challenges and Road.

Slides:



Advertisements
Similar presentations
Requirement of New Rules for PoA: DOEs Perspective
Advertisements

1 Compliance Report WECC Board of Directors Meeting December 7-8, 2006 Steve Rueckert Director, Standards and Compliance.
The CDM Project Activity Cycle UNFCCC CDM joint workshop March 2003 Bonn Kai-Uwe Barani Schmidt UNFCCC/Cooperative Mechanisms
'Best practices in application of sampling under PoA framework: DOEs perspective' Workshop on Programme of Activities (PoA) under the CDM: Challenges and.
UNFCCC Complexities in demonstration of additionality of a POA: Perspective of a Project Developer 8 th May 2011 Gareth Phillips Chairman, Project Developer.
Summary of Public call for Inputs on PoA
Harmonized implementation of CDM Accreditation CDM-Accreditation Panel.
DNV Climate Change Services AS: Trine Kopperud 05 May 2011 DOEs perspective: DOE Liability in context of PoA Workshop on Programme of Activities under.
CONOR BARRY, Team Lead OSD UNFCCC Secretariat SDM programme Setting expectations of the workshop Bonn, 7- 8 May 2011 Workshop on Programme of Activities.
Presented by: Lex de Jonge Vice-Chair CDM Executive Board Clean Development Mechanism EB perspective on recent developments, with a focus on Registration.
Sampling approaches in monitoring and DOE work experience and expectations 8 th May 2011 Florian Zerzawy atmosfair gGmbH
UNFCCC Recent Challenges in Implementing PoAs from a Commercial Perspective 8 th May 2011 Mischa Classen Senior Project Manager Regulatory Affairs and.
Key provisions and institutional arrangements of the CDM Christine Zumkeller UNFCCC/Cooperative Mechanisms
PoA Challenges & Opportunities
PoA for CFL lighting (using AMS-II.C.) A Case Study - Cuidemos Mexico May 2011.
BASELINE STANDARD UNFCCC secretariat workshop
UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, March.
Durban Decisions on the Clean Development Mechanism DUAN Maosheng Chair of the CDM Executive Board First SDM Joint Coordination Workshop Bonn,
Regional Distribution
UNFCCC secretariat Karla Solís, Programme Officer Introduction to current decisions: Recurring issues Project and Entity Assessment Unit CDM Registration.
JI Governance – review of JI Guidelines
PoA AFTER Cancun - READY TO TAKE OFF NOW
Zertifizierung Project Cycle – Programme of Activities 7th CDM Joint Coordination Workshop Jun Wang; TÜV NORD CERT GmbH
UNFCCC secretariat, SDM Ronald Twesigye, Fellow A Case Study on The Uganda Municipal Solid Waste Compost Program The Seventh CDM Joint Coordination Workshop.
UNFCCC secretariat, Sustainable Development Mechanisms Programme Conor BARRY Improving and demonstrating efficiency in CDM processes 7 th Joint Coordination.
UNFCCC secretariat, programme Mayuresh Sarang, Team Lead - Accreditation Standards Team Module 2.2 Calibration regarding Accreditation Assessment Requirements.
Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25.
Validation and verification report templates
Fact and Figures on the CDM. Status of registration Status: 16 Nov For only 8 cases the Board undertook review: 6 were registered after corrections.
Defining Standardized Baseline: The role of DNAs Malin Ahlberg Co-Chair of the DNA Forum 13 March 2011, Bonn.
. CDM Project Cycle Calibration Melanie Eddis ERM Certification and Verification Services (ERM CVS) CDM Coordination Meeting UNFCCC, Bonn March 2012.
SDM programme, UNFCCC secretariat Wenxin Li, Programme Officer Overview of PoA Standards SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
Dhirendra KUMAR UNFCCC Secretariat, Sustainable Development Mechansims Programme New Registration and Issuance Procedures 7 th CDM Joint Coordination Workshop.
UNFCCC secretariat, Sustainable Development Mechanisms Programme Modalities and procedures for direct communication with stakeholders 3/CMP 6, para. 21,
UNFCCC secretariat, SDM Olof Bystrom, Programme Officer Module 1.4 JI Project Cycle - Status of Implementation 1st SDM Joint Coordination Workshop Bonn,
UNFCCC secretariat, programme Gyungae Ha, Programme Officer Ensuring sustainability in project assessment 7 th CDM Joint Coordination Workshop, Bonn, Germany,
T HE W ORLD B ANK C ARBON F INANCE U NIT Standardised Baselines Framework March 24-25, Bonn.
1 Validation and registration Verification and issuance Technical Workshop on CDM Paramaribo, 20 June 2008 Adriaan Korthuis.
“Workshop on PoA: Challenges and Road Ahead” Session 10: - Should liability be shared by DOE and PP/CME - Perspectives of DOEs DOE/AIE Forum | Werner Betzenbichler.
Validation and Verification of CDM Projects Climate Change Kiosk on CDM/DNA, COP9 December 6, 2003 Marco van der Linden SGS Climate Change Programme.
BLY CPA Verification- A DOE’ Perspective Archak Pattanaik New Delhi,
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
TÜV SÜD South Asia Programme of activities (PoA) - Requirements & Challenges in CPA inclusion By Vijayanand TÜV SÜD South Asia
UNFCCC Secretariat Overview of the CDM and the CDM project Cycle Training-Workshop to support the “Uganda Municipal Waste Compost Programme” Kampala, Uganda,
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
T HE W ORLD B ANK C ARBON F INANCE U NIT PoAs and liability – the issue P RESENTATION AT UNFCCC P O A WORKSHOP M AY 2011 BY F ELICITY S PORS (F
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O VERVIEW OF P ROGRAM AND CPA L EVEL M ONITORING, P REPARATION OF M ONITORING.
UNFCCC Secretariat Status of negociations on CDM Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America and the Caribbean,Bogota, (31 –
UNFCCC How to address DOE Liability in context of PoA: Perspective of a Project Developer 8 th May 2011 Gareth Phillips Chairman, Project Developer Forum.
UNFCCC Roles and structure of Designated National Authorities (DNAs) Fabiana Rodrigues, UNFCCC secretariat Regional Workshop - Latin America and the Caribbean.
· © 2012 Perspectives GmbH PoA Standards Courtney Blodgett Joint Coordination Workshop, Bonn 24 March 2012.
Presentation title Session 2: The CDM Project Cycle Post-registration changes Renewal of crediting period Training-Workshop to support the “Uganda Municipal.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
TÜV SÜD Industrie Service GmbH Workshop on PoA under the CDM: challenges and the road ahead - Bonn 8/9 May 2011 Session 9.1 „Application of Sampling in.
Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
CFL Lighting Scheme – Bachat Lamp Yojana CDM Requirements.
Module 1.2 – CDM Project Cycle Calibration Calibration through enhanced CDM-AP direct communication with stakeholders (DOEs/ATs) A. Ricardo J. Esparta.
SEAN-CC Regional Training Workshop: Building Capacity on Access to Funds for Climate Change Adaptation Initiatives NIE accreditation process Mozaharul.
Best Practices for Preparing PoA- DD and CPA-DD UNFCCC Workshop on PoAs, 7 May 2011 Dr. Christoph Sutter CEO, South Pole Carbon Asset Management Patrick.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
TÜV SÜD Industrie Service GmbH CDM JCW Bonn 12 March 2011 Module 1.2 „existing barriers within the current PoA rules” An analysis from a DOEs perspective.“
UNFCCC secretariat, Sustainable Development Mechanisms programme Nashib Kafle, Associate Programme Officer Session 3: The Concept of Programme of Activities.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
1 CDM institutional framework Maria Netto UNFCCC secretariat Addis Ababa 21 October 2003
“Workshop on PoA: Challenges and Road Ahead” Session 2: Challenges in implementation of PoA policy and procedures - Experiences and challenges from the.
Clean Development Mechanism
Theoretical differences between CDM and JI validation/determination
Small-Scale Projects Under JI
Presentation transcript:

Difficulties in Verification of a PoA: DOEs Perspective by Dr. Kaviraj Singh Workshop on Programme of Activities (PoA) under the CDM: Challenges and Road Ahead 07 th - 8 th, May 2011, Bonn Organised by UNFCCC Secretariat

2 Content Current status of PoAs: validation/verification Procedures: CDM PA vis-à-vis PoA Template availability Complexities in verification Further guidance from UNFCCC Questions

3 Current status of PoAs: Total PoAs registered: 08 Under verification: 01 (or more) Under validation : 164 (Webhosted for ISHC)

4 Verification Procedures: CDM PA vis-à-vis PoA ProceduresCDM PAPoA Interface for MR uploadingYesNot yet Interface for RFIYesNot yet Notifying and requesting changes from the project design YesNA Revising monitoring planYes Deviation from an approved methodologyYes Deviation prior to submitting RFIYes Requesting post registration change to the start date of the crediting period YesRequire clarity Withdrawal of request for issuanceYesRequire clarity Timelines for issuance (after RFI)YesRequire clarity

5 Change in project design? Change in the number of PA equipment installation Given the number in millions Robust monitoring of implementation Change in the rated capacity Minor & Major Implementation in different geographical areas than the ones mentioned in the registered PoA Municipalities Region within a country & Across the countries The impact of these changes: Additionality/Scale/Applicability

6 Revision in monitoring plan? PoA-DD not inline to applied methodology If PoA DD is reivsed, does it require to change in all CPAs? CPA-DD doesnt follow the applied methodology Is revision in affected CPA DD is acceptable? Only implemented CPA-DD doesnt follow the PoA-DD EB55 Annex 38, para 19 & 20: Once changes have been approved inline to the revised/replaced meth, does it require the existing CPAs (as default) to follow the new PoA?

7 Deviation from the registered PoA-DD & CPA-DD PoA-DD CPA-DD only Deviation from PoA as well as CPA-DD

8 Templates: PoA vis-à-vis CDM TemplatesCDMPoA Monitoring ReportYes (F-CDM-MR )Not available Revising monitoring plan (Form)Yes (F-CDM- REVMP) ? Deviation (Form) prior to submitted RFI Yes (F-CDM-DEV- ISS) ? Withdrawal of request for issuance Yes (F-CDM-WI )Require clarity Form to submit RFIYes (F-CDM- REQCERS) ?

9 Complexities in verification of PoAs Data Sampling Huge sets of data to be verified Assurance on information provided by third parties (for PP) Extra time and efforts (on site) required by DOE More clarity on issues (discussed later)

10 Data Sampling for monitored parameters Appropriateness of the sample size in the registered PoA DD Identification of the representative sample size for the monitored data More clarity required, within the PoA section in methodologies, on appropriate sampling plan requirements

11 Huge sets of data to deal with Number of project devices may be thousands/millions Significant time and efforts required Need of statistical expert in team Robust data processing systems for PPs Technical difficulties (size) in uploading the files

12 Assurance on hired third party No defined criteria (competency/accreditation) about the selection of third party Protocols to be used by third party for data collection and analysis should be made available in the PoA-DD Involved parties should have the accreditation from the government bodies or other authorized entities

13 Extra efforts of DOEs may require on site Requires more time and efforts (as compared to CDM projects) on site Complete assessment team shall visit the site Geographical and sociological constrains on site Need to increase the sample size if variations in collected data Economical constrains, on the required efforts, for DOEs

14 Further guidance from UN Response from UN on some project specific clarifications as exceptional case More clarity on procedures for change in project design/RMP/deviations cases Specific guidance for sampling of CPAs and data collection Availability of PoA specific templates and forms

15 Employed 59,000 people and operate a network of more than 1,000 offices and laboratories around the world Verification of 27.4% of the total projects got CER issued (still stands on top)* Validation of 10.9% of the total registered projects* Dr. Kaviraj Singh Regional Operation Manager (ME & SEAP) Phone: Mobile: Web: Questions? Thanks You *UNEP RISO ( March, 2011http://cdmpipeline.org/