DNV Climate Change Services AS: Trine Kopperud 05 May 2011 DOEs perspective: DOE Liability in context of PoA Workshop on Programme of Activities under.

Slides:



Advertisements
Similar presentations
Requirement of New Rules for PoA: DOEs Perspective
Advertisements

The CDM Project Activity Cycle UNFCCC CDM joint workshop March 2003 Bonn Kai-Uwe Barani Schmidt UNFCCC/Cooperative Mechanisms
UNFCCC Complexities in demonstration of additionality of a POA: Perspective of a Project Developer 8 th May 2011 Gareth Phillips Chairman, Project Developer.
Summary of Public call for Inputs on PoA
Difficulties in Verification of a PoA: DOEs Perspective by Dr. Kaviraj Singh Workshop on Programme of Activities (PoA) under the CDM: Challenges and Road.
CONOR BARRY, Team Lead OSD UNFCCC Secretariat SDM programme Setting expectations of the workshop Bonn, 7- 8 May 2011 Workshop on Programme of Activities.
Presented by: Lex de Jonge Vice-Chair CDM Executive Board Clean Development Mechanism EB perspective on recent developments, with a focus on Registration.
Workshop on Programme of Activities under CDM, Bonn, 7-8 May 2011
Sampling approaches in monitoring and DOE work experience and expectations 8 th May 2011 Florian Zerzawy atmosfair gGmbH
UNFCCC Recent Challenges in Implementing PoAs from a Commercial Perspective 8 th May 2011 Mischa Classen Senior Project Manager Regulatory Affairs and.
PoA Challenges & Opportunities
PoA for CFL lighting (using AMS-II.C.) A Case Study - Cuidemos Mexico May 2011.
T HE W ORLD B ANK C ARBON F INANCE U NIT I MPROVING SMALL SCALE TRANSPORTATION METHODOLOGIES : L ESSONS FROM E GYPTIAN VEHICLE SCRAPPING P O A. P RESENTATION.
Michael Lehmann, DNV 12 March 2011 DOE view on the Validation and Verification Standards (VVS) Improve objectivity in the CDM - 7th CDM Joint Coordination.
Durban Decisions on the Clean Development Mechanism DUAN Maosheng Chair of the CDM Executive Board First SDM Joint Coordination Workshop Bonn,
Regional Distribution
UNFCCC secretariat Karla Solís, Programme Officer Introduction to current decisions: Recurring issues Project and Entity Assessment Unit CDM Registration.
A Project Developers view on lessons learned and challenges with PoAs (module 2.2) 24 March 2012 Mischa Classen Executive Committee, Project Developer.
PoA AFTER Cancun - READY TO TAKE OFF NOW
Zertifizierung Project Cycle – Programme of Activities 7th CDM Joint Coordination Workshop Jun Wang; TÜV NORD CERT GmbH
GUIDELINES ON: (A) COMMON PRACTICE (B) ADDITIONALITY OF FIRST-OF-ITS KIND SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
UNFCCC secretariat, SDM Ronald Twesigye, Fellow A Case Study on The Uganda Municipal Solid Waste Compost Program The Seventh CDM Joint Coordination Workshop.
UNFCCC secretariat, Sustainable Development Mechanisms Programme Conor BARRY Improving and demonstrating efficiency in CDM processes 7 th Joint Coordination.
· © 2011 Perspectives GmbH Programme of Activities Lessons learnt & PoAs as a chance for CDM Host Countries UNFCCC.
UNFCCC secretariat, programme Mayuresh Sarang, Team Lead - Accreditation Standards Team Module 2.2 Calibration regarding Accreditation Assessment Requirements.
Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25.
Defining Standardized Baseline: The role of DNAs Malin Ahlberg Co-Chair of the DNA Forum 13 March 2011, Bonn.
CCS – OVERVIEW OF THE MODALITIES AND PROCEDURES AND THEIR IMPLEMENTATION SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
SDM programme, UNFCCC secretariat Wenxin Li, Programme Officer Overview of PoA Standards SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
Significant deficiencies in validation, verification and certification reports 25 th March 2012 Gareth Phillips Chair, Project Developer Forum Chief Climate.
Dhirendra KUMAR UNFCCC Secretariat, Sustainable Development Mechansims Programme New Registration and Issuance Procedures 7 th CDM Joint Coordination Workshop.
UNFCCC secretariat, Sustainable Development Mechanisms Programme Modalities and procedures for direct communication with stakeholders 3/CMP 6, para. 21,
UNFCCC secretariat, programme Gyungae Ha, Programme Officer Ensuring sustainability in project assessment 7 th CDM Joint Coordination Workshop, Bonn, Germany,
Wrap-up session 1 st Sustainable Development Mechanisms Joint Coordination Workshop Maritim Hotel Bonn Germany, March 2012.
Best Practices on PoA Development Dr. Oscar Coto II National CDM Workshop Belize August 2011.
T HE W ORLD B ANK C ARBON F INANCE U NIT Standardised Baselines Framework March 24-25, Bonn.
“Workshop on PoA: Challenges and Road Ahead” Session 10: - Should liability be shared by DOE and PP/CME - Perspectives of DOEs DOE/AIE Forum | Werner Betzenbichler.
BLY CPA Verification- A DOE’ Perspective Archak Pattanaik New Delhi,
1 Rajesh Kumar Sethi Chair of the CDM Executive Board Clean Development Mechanism 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop on means.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
TÜV SÜD South Asia Programme of activities (PoA) - Requirements & Challenges in CPA inclusion By Vijayanand TÜV SÜD South Asia
CDM PoA CPA. What is a Programme of Activities? Definition: A programme of activities (PoA) is a voluntary coordinated action by a private or public.
Programmatic CDM Joergen Fenhann DFC 9. August 2011.
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
T HE W ORLD B ANK C ARBON F INANCE U NIT PoAs and liability – the issue P RESENTATION AT UNFCCC P O A WORKSHOP M AY 2011 BY F ELICITY S PORS (F
UNFCCC Secretariat Status of negociations on CDM Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America and the Caribbean,Bogota, (31 –
UNFCCC How to address DOE Liability in context of PoA: Perspective of a Project Developer 8 th May 2011 Gareth Phillips Chairman, Project Developer Forum.
1st Sustainable Development Mechanisms Joint Coordination Workshop Significant Deficiencies in Validation, Verification and Certification Reports Risk.
· © 2012 Perspectives GmbH PoA Standards Courtney Blodgett Joint Coordination Workshop, Bonn 24 March 2012.
Lima, Perú, October 22 nd, 2009 Programme of Activities: Challenges and Opportunities IV Seminario Internacional: Mercado del Carbono Presented by Alberto.
TÜV SÜD Industrie Service GmbH Workshop on PoA under the CDM: challenges and the road ahead - Bonn 8/9 May 2011 Session 9.1 „Application of Sampling in.
Tor Svensen DNV-GL merger: increased safety focus Nor-Shipping press conference,
Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
CFL Lighting Scheme – Bachat Lamp Yojana CDM Requirements.
Module 1.2 – CDM Project Cycle Calibration Calibration through enhanced CDM-AP direct communication with stakeholders (DOEs/ATs) A. Ricardo J. Esparta.
UNFCCC Secretariat From PoA to NAMAs - Co-existence (opportunities and challenges) Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America.
Edwin Aalders 24 March 2012 Materiality Applying Materiality in the Flexible Mechanism.
Best Practices for Preparing PoA- DD and CPA-DD UNFCCC Workshop on PoAs, 7 May 2011 Dr. Christoph Sutter CEO, South Pole Carbon Asset Management Patrick.
Validation of Scenario Analysis and Control Group Baselines World Bank/PCF Workshop Delhi, Oct. 22, 2002 Trygve Roed-Larsen Det Norske Veritas (DNV)
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
TÜV SÜD Industrie Service GmbH Workshop on PoA under the CDM: challenges and the road ahead - Bonn 8/9 May 2011 Session 8.1 „Additionality in the context.
TÜV SÜD Industrie Service GmbH CDM JCW Bonn 12 March 2011 Module 1.2 „existing barriers within the current PoA rules” An analysis from a DOEs perspective.“
Five Year Forward View: Personal Health Budgets and Integrated Personal Commissioning Jess Harris January 2016.
UNFCCC secretariat, Sustainable Development Mechanisms programme Nashib Kafle, Associate Programme Officer Session 3: The Concept of Programme of Activities.
7th Joint Coordination Workshop “Improving efficiency in the operation of CDM” - DOE Viewpoints DOE/AIE Forum | Werner Betzenbichler | March 2011.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
1 CDM institutional framework Maria Netto UNFCCC secretariat Addis Ababa 21 October 2003
“Workshop on PoA: Challenges and Road Ahead” Session 2: Challenges in implementation of PoA policy and procedures - Experiences and challenges from the.
ET-CAC Report Kevin ALDER Agenda item 6-3 (1)
Presentation transcript:

DNV Climate Change Services AS: Trine Kopperud 05 May 2011 DOEs perspective: DOE Liability in context of PoA Workshop on Programme of Activities under CDM, Bonn, 7-8 May 2011

© Det Norske Veritas AS. All rights reserved. DOE's View on PoA Matters Thursday, 07 April The Context I am working in CDM as a DOE, validating PoAs …. it is very interesting I heard it is a lot of uncertainties about liability ? Yes, it is one of the challenges, the liability is unlimited….. I would run away pretty fast if I were you….

© Det Norske Veritas AS. All rights reserved. DOE's View on PoA Matters Thursday, 07 April There is a need to create incentives for DOEs Even after the most recent revisions of the underlying procedure, DOEs being engaged for the inclusion of CPAs still face the unquantifiable liability risk for erroneous inclusion - DOE Liability is still dependent on checking eligibility criteria (which is not clearly defined) - The liability risk is disproportional to the revenue that DOEs can obtain with PoA work The existing guidance is still unclear at specific aspects In summary, the recent set-up does not deliver any incentive for DOEs spending much efforts in extending their staff or their staffs skills in order to be enabled in offering more validation and verification services to PoAs. UNLIMITED LIABILITY - WHAT TYPE OF BUSINESS WOULD LIVE WITH SUCH CONDITIONS ?

© Det Norske Veritas AS. All rights reserved. DOE's View on PoA Matters Thursday, 07 April How is DNV handling the DOE liability related to PoAs? We only accept PoAs where inclusion criteria for CPAs will be strictly defined, DNV specific, and leave in our opinion no room for ambiguity and erroneous inclusions. We limit the number CPA included to a manageable amount of CERs We will refrain from validating a PoA in the event that the criteria defining the inclusion of CPAs as proposed by the coordinating/managing entity are not to our satisfaction. For the CPAs to be included, DNV will perform site visits for all CPAs and not only a sample thereof until clear sampling standard are made available by the CDM EB THE CURRENT SET-UP HINDER GROWTH IN THE DEVELOPMENT OF POAs

© Det Norske Veritas AS. All rights reserved. DOE's View on PoA Matters Thursday, 07 April What do we want to achieve? Avoiding erroneous inclusion of a CPAs There is established a simplified system for POAs compared to CDM large/small scale by direct inclusion without check of each CPA by the CDM Secretariat/EB However NO CHECK - resulted in giving unlimited liability to DOEs THERE IS A NEED TO BALANCE THE LEVEL OF CHECK AND THE SIZE OF LIABILITY

© Det Norske Veritas AS. All rights reserved. DOE's View on PoA Matters Thursday, 07 April Solutions to remove barriers (1) Liability risk has to be reduced to a level that DOEs can manage Introduce a cap on liability in terms of size of liability and the time period after inclusion of a CPA Introduce of penalty clauses similar to other PoA type of Certification programmes (i.e. in the event that DOE identifies system failure within a sample will lead to no validation /verification for the whole group to be included in PoA or whole PoA) Recognise the concept that the managing entity is taking some responsibility of the DOEs and as such also some of the liability needs to be transferred. - CDM EB / MOP to introduce transfer of liability to PP with introduction that DOE need to validate & verify PPs liability insurance or the introduction of a insurance buffer at x% of PoA CER volume If assessments of samples are accepted for CPA inclusion or verification, the acting DOE has to be released of any responsibility for issues occurring outside the scrutinized samples

© Det Norske Veritas AS. All rights reserved. DOE's View on PoA Matters Thursday, 07 April Solutions to remove barriers (2) Revision of review procedure EB 55 Annex 37 should be considered At present review can be requested 1 year after the inclusion or within 6 month after the first issuance of CERs - Propose to limit the period for request for review to 6 months after inclusion - During this period: - Secretariat could do sampling to check for erroneous inclusion - No issuance should be allowed during this time period for request for review - Review should not be allowed after issuance of CERs - DOEs liability to be limited to significant deficiencies only, i.e. fraud, malfeasance or gross negligence Para 10 – Another DOE is requested to assess if the inclusion was erroneous and the DOE that accepted the inclusion will be held liable - The challenge is availability of DOEs – the work load for DOEs is now high and it will be difficult to provide a qualfiied team within the time indicated in the procedure IMPLEMENTING THESE PROPOSED CHANGES COULD BE A WAY FORWARD

© Det Norske Veritas AS. All rights reserved. DOE's View on PoA Matters Thursday, 07 April THANK YOU !

© Det Norske Veritas AS. All rights reserved. DOE's View on PoA Matters Thursday, 07 April Safeguarding life, property and the environment