UNFCCC secretariat Karla Solís, Programme Officer Introduction to current decisions: Recurring issues Project and Entity Assessment Unit CDM Registration.

Slides:



Advertisements
Similar presentations
Paulo Manso CDM EB September, 2011 Proceeder for Submission & Approval Standardized Baselines.
Advertisements

The CDM Project Activity Cycle UNFCCC CDM joint workshop March 2003 Bonn Kai-Uwe Barani Schmidt UNFCCC/Cooperative Mechanisms
Difficulties in Verification of a PoA: DOEs Perspective by Dr. Kaviraj Singh Workshop on Programme of Activities (PoA) under the CDM: Challenges and Road.
CDM Executive Board – status of work Q&A sessions at UNFCCC COP/MOP2 – November 2006 Mr. José Domingos Miguez Chair of the CDM Executive Board.
CONOR BARRY, Team Lead OSD UNFCCC Secretariat SDM programme Setting expectations of the workshop Bonn, 7- 8 May 2011 Workshop on Programme of Activities.
Presented by: Lex de Jonge Vice-Chair CDM Executive Board Clean Development Mechanism EB perspective on recent developments, with a focus on Registration.
4 basic approaches to determining energy efficiency benefits (savings) 1.Stipulated or deemed savings 2.Individual Building Metering – Measurement and.
BASELINE STANDARD UNFCCC secretariat workshop
UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, March.
Michael Lehmann, DNV 12 March 2011 DOE view on the Validation and Verification Standards (VVS) Improve objectivity in the CDM - 7th CDM Joint Coordination.
TÜV NORD Calibration regarding project assessment requirements 7th CDM Joint Coordination Workshop 2011 Bonn,
UNFCCC secretariat, Sustainable Development Mechanisms Verónica Colerio, Standard Setting Unit Standardized Baselines in the CDM: Decisions and Way Forward.
PoA AFTER Cancun - READY TO TAKE OFF NOW
Fact and Figures on the CDM. Status of registration Status: 16 Nov For only 8 cases the Board undertook review: 6 were registered after corrections.
CDM METHODOLOGIES IMPROVEMENT 7 th CDM Joint Coordination Workshop th March 2011, Bonn, Germany Anne-Sophie Zirah - March 2011.
Dhirendra KUMAR UNFCCC Secretariat, Sustainable Development Mechansims Programme New Registration and Issuance Procedures 7 th CDM Joint Coordination Workshop.
UNFCCC secretariat, Sustainable Development Mechanisms Programme Modalities and procedures for direct communication with stakeholders 3/CMP 6, para. 21,
UNFCCC secretariat, programme Gyungae Ha, Programme Officer Ensuring sustainability in project assessment 7 th CDM Joint Coordination Workshop, Bonn, Germany,
1 Sustainable Development Assessment of CDM projects in Georgia Mariam Ubilava Istanbul, Turkey January, 2008.
CDM Basics Marcos Castro, World Bank Institute CFCB Sao Paulo Workshop São Paulo City Hall, 4 May 2010.
CERUPT The Experiences so far Reginald Hernaus Ministry of Housing, Spatial Planning and the Environment.
1 Validation and registration Verification and issuance Technical Workshop on CDM Paramaribo, 20 June 2008 Adriaan Korthuis.
CDM – LULUCF Project Cycle Winrock International Sandra Brown Training Seminar for BioCarbon Fund Projects.
Validation and Verification of CDM Projects Climate Change Kiosk on CDM/DNA, COP9 December 6, 2003 Marco van der Linden SGS Climate Change Programme.
Module 1: Introduction and recap M1. M1. Introduction and recap This first workshop covers all the following contents – as per work plan: CDM modalities.
Eva Filzmoser, CDM Watch First SDM Joint Coordination Workshop March 2012, Bonn Global and Local Stakeholder Consultation.
1 Rajesh Kumar Sethi Chair of the CDM Executive Board Clean Development Mechanism 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop on means.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
CDM PoA CPA. What is a Programme of Activities? Definition: A programme of activities (PoA) is a voluntary coordinated action by a private or public.
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
Conducting Carbon Projects Presented by Adam Shepherd Regional Workshop on Legal, Institutional and Financial aspects of Carbon Finance Istanbul, Turkey.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth COP 9 5 th December 2003.
Joint Implementation & Gas Flaring Reduction Projects Alexandrina Platonova-Oquab Carbon Finance Unit, World Bank.
UNFCCC Roles and structure of Designated National Authorities (DNAs) Fabiana Rodrigues, UNFCCC secretariat Regional Workshop - Latin America and the Caribbean.
Presentation title Session 2: The CDM Project Cycle Post-registration changes Renewal of crediting period Training-Workshop to support the “Uganda Municipal.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
TÜV SÜD Industrie Service GmbH Workshop on PoA under the CDM: challenges and the road ahead - Bonn 8/9 May 2011 Session 9.1 „Application of Sampling in.
How to develop a Carbon Finance project?. Assessment of tool - Is this landfill project feasible? Source:
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
Calibration regarding project assessment requirements - RIT Perspectives Vinay Deodhar, RIT Module th JCW Bonn, March 2011.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
WB Carbon Finance Project Cycle and Role of Key Players Introduction to Carbon Finance March 10, 2004.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
CDM - PDD- Thu duc Plant Sep., 11, 2003 Preliminary findings of PDD– CDM model project for Thuduc fuel switching plant Master Nguyen Thi Kim Lien International.
Roundtable on Validation and Verification Issues in LULUCF Projects The World Bank, Washington DC August 24-25, 2009 Issues in Validation of A/R Projects.
UNFCCC Secretariat Utilizing the existing CDM institutional arrangements for NAMAs Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth Accra, Ghana 7 th and 8 th November 2005.
Module Calibration regarding accreditation assessment requirements Calibration through enhanced CDM-AP direct communication with stakeholders (DOEs/ATs)
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
1 Second Regional Workshop Capacity Development for the Clean Development Mechanism (CD4CDM) 23 March 2004 Siem Reap, Cambodia Review and Future Plan of.
TÜV SÜD Industrie Service GmbH CDM JCW Bonn 12 March 2011 Module 1.2 „existing barriers within the current PoA rules” An analysis from a DOEs perspective.“
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Capacity Development for CDM Cairo, March 31 & April 1,
UNFCCC secretariat, Sustainable Development Mechanisms programme Nashib Kafle, Associate Programme Officer Session 3: The Concept of Programme of Activities.
Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Capacity Development for the CDM (CD4CDM) First National Workshop - SURINAM Host Country Institutional Issues Miriam Hinostroza UNEP.
1 CDM institutional framework Maria Netto UNFCCC secretariat Addis Ababa 21 October 2003
Clean Development Mechanism
Standardized baselines
Q&A sessions at UNFCCC SB26
Operationalizing Export Certification and Regionalization Programmes
Work Accomplished by JISC
Presentation transcript:

UNFCCC secretariat Karla Solís, Programme Officer Introduction to current decisions: Recurring issues Project and Entity Assessment Unit CDM Registration Team Bonn, 11 March 2011

Outline of the presentation Assessment at registration stage: Additionality: Prior consideration Investment analysis Baseline identification Assessment at issuance stage: Changes of PPD

Prior consideration issue: Real and continuing actionsRegistration Requirements: VVM v1.2, paragraph 102.b …(b) Reliable evidence from PPs that must indicate that continuing and real actions were taken to secure CDM status for the project in parallel with its implementation. Evidence to support this should include, inter alia, contracts with consultants for CDM services, ERPAs or other documentation related to the sale of CERs, evidence of agreements or negotiations with a DOE for validation services, submission of a new methodology to the CDM EB, publication in newspaper, interviews with DNA, correspondence with the DNA/UNFCCC. EB 49, Annex 22, paragraphs 7, 8. b: …(b) the gap between documented evidence is greater than 2 years and less than 3 years, the DOE may validate that continuing and real actions were taken to secure CDM status for the project activity and shall justify any positive or negative validation opinion based on the context of the evidence and information assessed;…

Example of an assessment: The prior consideration was based on a CDM letter of intent between the PP and CDM consultancy, 11 Sep The starting date is 21 October 2004 when the construction contract was signed. The continuous actions were confirmed through the CDM consultancy contract (3 Jun 2007) and validation started on 8 January The PDD/VR do not show CDM actions after the project starting date and the start of the CDM consultant. It is not clear how the DOE validated the continuous and real actions taken to secure CDM during the gap of almost 3 years between the project start date and the CDM consultancy contract. Prior consideration issue: Real and continuing actionsRegistration

Requirement: VVM, v1.2, paragraph 111 To verify the accuracy of financial calculations carried out for any investment analysis, the DOE shall: (a) Conduct a thorough assessment of all parameters/assumptions used in calculating the relevant financial indicator, and determine the accuracy and suitability of these parameters using the available evidence and expertise in relevant accounting practices; (b) Cross-check the parameters against third-party or publicly available sources, such as invoices or price indices; … Example of an assessment: The investment costs assumed in the IRR calculation is based on a feasibility report, finalised in April These costs are validated as follows: The total investment costs of 30.4 million US$ (1,700 US$/kW, 21 MW hydro turbine) was compared to three similar (20-36 MW capacity) registered CDM projects in the region with a range of 1,100-1,250 US$/kW. The DOE justified that the higher unit investment cost of the proposed project is because it has a long dam (287.02m). However the DOE did not cross-check the investment costs with a third party source. Investment analysis: Input valuesRegistration

Baseline identification: ACM0001Registration Requirement: VVM, v1.2, paragraph 85 The DOE shall determine whether all applicable CDM requirements have been taken into account in the identification of the baseline scenario for the proposed CDM project activity, including relevant national and/or sectoral policies and circumstances. Drawing on its knowledge of the sector and/or advice from local experts, the DOE shall confirm that all relevant policies and circumstances have been identified and correctly considered in the PDD, in accordance with the guidance by the CDM Executive Board. Example of an assessment: ACM0001: The baseline is continuation of venting the landfill gas. The DOE validated the implementation of the existing regulation (introduced in January 2006) to flare landfill gas is not applied in the country. The validation was carried out by a letter from the flaring technology supplier which confirms that the regulation is not being implemented due to lack of monitoring/supervising procedures. However, it is not clear if the approach of this validation is appropriate.

Project implementation as per the PDD Issuance Requirements: VVM paragraph The DOE shall identify any concerns related to the conformity of the actual project activity and its operation with registered PDD The DOE shall verify by an on-site visit all physical features… and that the project participants has operated the project activity as per the PDD… In case of any changes, a notification or request for approval should be submitted to the Board. Example of an assessment: Changes of biomass used in the thermal plant can affect additionality due to price changes in biomass types. [AMS-I.C and ACM0006] Changes of the capacity, number of units and configuration of equipments to be installed E.g. wind turbines Plant load factor as compared to estimate in PDD. E.g. biomass plants.

References Prior consideration Additonality tool: tool-01-v5.2.pdfhttp://cdm.unfccc.int/methodologies/PAmethodologies/tools/am- tool-01-v5.2.pdf Guidelines on investment analysis, v3: Guidelines on barrier analysis Validation and Verification Manual Methodologies:

Discussion Your questions?

Thank you for your attention !