Business Success Through Safety Excellence Jeffrey D. Mousseau, P.E. President and General Manager Bechtel BWXT Idaho.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

1 Transuranic Waste Processing Center Karen Deacon, Deputy Federal Project Director Oak Ridge Office of Environmental Management.
1 Integration of EMS and ISMS at the Idaho Cleanup Project Kliss McNeel November 1, 2006.
1 Status of DOE Cleanup in Idaho Presentation to the “LINE Commission” By Rick Provencher Manager, DOE Idaho Operations Office April 7, 2012 Idaho Falls,
1 Best Practices for Risk-Informed Remedy Selection, Closure, and Post-closure Control for DOE’s Contaminated Sites October 30, 2013.
Progress on Cleanup of the INL Site for the INL Retired Employees Association Bob Iotti, President and CEO September 2008.
1 EM Update and Perspective David Huizenga Senior Advisor for Environmental Management 2012 DOE Project Management Workshop April 3, 2012.
To protect the health and environment of all Kansans by promoting responsible choices. Immunization Program 2009 H1N1 Adventure Governor’s Child Health.
SLAC ES&H Overview Craig Ferguson March Operating Model ES&H Mission Critical Issues Challenges Path forward Topics October 2008.
1 Waste Management David Nickless Environmental Management Los Alamos Field Office March 3, 2015.
Center for Health Care Quality Licensing & Certification Program Evaluation 1 August 2014 rev.
Developing a Chemical Risk Management Program
Environmental Health and Safety Radiation Control and Radiological Services.
TRU Waste Processing Center Culture and Successful Implementation of an ISO Certified Environmental Management System Presented at the DOE ISM Conference.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
U.S. Department of Energy’s Consolidated Audit Program (DOECAP) U.S. Department of Energy’s Consolidated Audit Program (DOECAP) Dr. Todd L. Hardt DOECAP.
Remote-Handled Transuranic Waste Disposition Discussion Meeting of the National Governors’ Association April 12, 2001 U. S. Department of Energy.
1Managed by UT-Battelle for the Department of Energy Doing Business with Oak Ridge National Laboratory Presented to the SBTDC Opportunities 2008 Will Minter,
GWS SMS INTRODUCTION MSM Manual. 3. MISSION STATEMENT AND CORE VALUES OF THE COMPANY  MISSION  Our Mission is to provide expertise in the fields of.
Second Nature Strategic Framework Second Nature is the supporting organization of the American College & University Presidents’ Climate Commitment Board.
Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013.
Tank Operations Contract 1 Presenters: Fred Beranek Everett Gray Results of EFCOG/DOE Safety Culture Pilot Focus Group Assessment DOE ISMS Conference August.
Environmental Health and Safety (EH&S) Supplier Awareness Training ISR Systems Danbury, CT 2011.
ISMS Best Practices Workshop Integration of New Safety Initiatives into ISMS Continuous Improvement September 12-13, 2006.
ISMS Best Practices Workshop Initial Steps to Integrate HPI into ISMS Continuous Improvement CH2M HILL Hanford Group, Inc. September 12-13, 2006.
1 D D O C U M E N T A T I O N & I N F O R M A T I O N S E R V I C E S 1 Achieving and Maintaining High Reliability through Human Performance.
Safety Culture: Taking ISMS to the Next Level. Traci Hempen-Potter Bio Traci Hempen-Potter joins us from Restoration Services, Inc. (RSI) in Oak Ridge.
1 Idaho Cleanup Project Extension Work Transportation Accomplishments M. Shawn Tigue July 2015.
Integrating ISMS Safety Concepts and Tools into the Design of CH2M HILL’s Demonstration Bulk Vitrification System September 12-13, 2006.
1 SEAB Task Force on EM Technology Development Gerald Boyd Task Force Member September 29, 2015.
11 Presented by: Kevin Smith, Manager September 29, 2015 ORP’s Path to Reinvigorating Technology Development DOE National Cleanup Workshop EM Technology.
River Corridor Closure Project 1 Safety Teamwork Disciplined Operations Integrity River Corridor Closure Project Safety Teamwork Disciplined Operations.
At Lewis Field Glenn Research Center 0530 Safety Directors Meeting Glenn Safety Office Manuel B. Dominguez March 6, 2001.
1 AMWTP Employee Safety Video Contest. 2 James Gouldthorpe Bio Site Project Manager Designee for Bechtel BWXT Idaho on the Advanced Mixed Waste Treatment.
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
Retrieval and Treatment of Problematic MLLW Streams Renee Echols Senior Vice President CTMA Partners in Progress, July 7, 2015.
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Colette Broussard, DOE-HQ Office of Quality Assurance Policy.
ISM Annual Review and Declaration Lessons Learned CH2M HILL Hanford Group John McDonald.
Safety Culture in Cooperative Agreements Prepared by Tom Williams Office of the Senior Advisor for ES&H August, 2009.
EM Budget--- Past/Present/Future Mark W. Frei U.S. Department of Energy October 14, 2005.
C O N T R A C T O R I N F O R M A T I O N E X C H A N G E LashCIE Presentation 1/98 1 Recent Accomplishments and Future Directions Dan Giessing U.S. Department.
Do Work Safely DOE Hanford Site Recovery Act Support to New Workers Ted Giltz Hanford Site Recovery Act Project Manager
DOE ASSET MANAGEMENT PLAN
Ray Karol Collider-Accelerator Department ESSHQ Division Head August 19, 2009 Human Performance Initiative at Collider-Accelerator Department.
Monitoring the Long-Term Effectiveness of Integrated Safety Management System (ISMS) Implementation Through Use of a Performance Dash Board Process Mike.
Transformation of a National Laboratory: ISMS Component Beth Streeper ISMS Program Manager Integrated Safety Management Workshop 2007 Brookhaven National.
TRU Waste Processing Center VPP Star Status in Two Years Dr. Anthony Buhl, PE President EnergX, LLC August 27, 2009.
The Challenge of Getting What You Asked For Integrated Safety Management Summit Knoxville TN August 24-27, 2009 Presented By: Patrice McEahern HNF
Strategic Planning Deanna Herwald Vice President-Quality Management Systems.
DoD Lead Agent: Office of the Assistant Secretary of the Army (Installations and Environment) Department of Defense Voluntary Protection Programs Center.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
DoD Lead Agent: Office of the Assistant Secretary of the Army (Installations and Environment) Department of Defense Voluntary Protection Programs Center.
DoD Lead Agent: Office of the Assistant Secretary of the Army (Installations and Environment) Department of Defense Voluntary Protection Programs Center.
Meet your Regulator Workshop with FANR licensees October 2011 Dr. John Loy Director, Radiation Safety Federal Authority for Nuclear Regulation.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
EFCOG Safety Working Group (SWG) Status June 7, 2016 EFCOG Working Group Coordination Meeting Washington, DC John McDonald, SWG Chair.
1 The Department of Energy And Electronics Stewardship : How DOE Attained “Green Status” on the OMB Environmental Scorecard Federal Environmental Symposium.
Low Level Radioactive Waste Forum, Fall 2014 Meeting
Shipping to WIPP Travis R. Myers 5/24/17 GV ppt.
Overview of Waste Disposition Activities Fall 2017 LLW Forum Meeting
CR3 and Crystal River Energy Complex
Waste Management’s Role in Safely Consolidating, Accelerating, and Delivering the Idaho Cleanup Project Core Mission Bruno Zovi, AMWTP LLW/MLLW Program.
Environmental Health and Safety (EH&S) Supplier Awareness Training
Oak Ridge Office of Environmental Management Update
Logistics Solutions for the Warfighter
From INPO AFI to Top Performer
LL Forum Meeting Richland Washington
LLWR Ltd: Continuing to Make Safety Our Top Priority
Northeast High-Level Radioactive Waste Transportation Task Force
Trending Requirements and Results
Presentation transcript:

Business Success Through Safety Excellence Jeffrey D. Mousseau, P.E. President and General Manager Bechtel BWXT Idaho

Jeffrey Mousseau Bio Jeffrey D. Mousseau, P.E. President and General Manager Bechtel BWXT Idaho Advanced Mixed Waste Treatment Project Jeff is the President and General Manager of the Advanced Mixed Waste Treatment Project, managed and operated for the U.S. Department of Energy by an affiliate of Bechtel National, Inc. Located at the Department’s Idaho site, the Advanced Mixed Waste Treatment Project (AMWTP) mission is to safely and compliantly retrieve and treat some 65,000 cubic meters of legacy plutonium contaminated mixed waste and safely ship it out of Idaho. The majority of waste will be shipped to the Waste Isolation Pilot Plant in Carlsbad New Mexico for disposal. Prior to this assignment Mr. Mousseau served as Vice President and Plant Manager of AMWTP. In this capacity, he consistently and successfully worked with DOE’s Idaho Operations and Carlsbad Field Offices to facilitate difficult compliance requirements and shipping schedules. His leadership was also instrumental in AMWTP obtaining DOE’s Integrated Safety Management System validation which has helped AMWTP to compile one of the DOE’s best safety records. Mr. Mousseau’s background includes 20 years of progressive responsibilities at the Idaho National Laboratory. In total, he has more than 28 years experience working and managing environmental cleanup and plant operations including compliant disposition of radioactive and hazardous waste for both commercial and federal customers. An engineering graduate of the University of Idaho, Mr. Mousseau is licensed as a professional engineer in mechanical engineering in the state of Idaho. For the past two years he has served on the Leadership Board of the State of Idaho Board of Directors of the American Red Cross, and recently served as co-Chair of the United Way of Idaho Falls and Bonneville County. Mr. Mousseau is also on the Board of Directors of the YMCA of Idaho Falls.

Challenge Bechtel BWXT Idaho is committed to safely, compliantly, and efficiently managing and operating the Advanced Mixed Waste Treatment Project to retrieve, characterize, process, package and ship 65,000 cubic meters of historically managed stored transuranic nuclear waste for shipment to permanent disposal sites outside of Idaho and also support the receipt and treatment of transuranic waste from other DOE sites for shipment to the Waste Isolation Pilot Plant.

Hazardous Work Radiological, chemical, physical, environmental, and other Physical hazards Organic, inorganic, PCB, Be Radiological contamination Environmental hazards Unexpected hazards

Commercial TSD Nevada Test Site WIPP Disposal Options AMWTP Process Flow 65,000 m 3 Transuranic Waste Inventory Characterization Assay Radiography Head gas sampling Storage/ Retrieval Treatment Supercompaction Liquids treatment Sizing Payload/ Shipping TRU waste MLLW waste

AMWTP Aerial

Customer Expectations Customer Safety Expectations –Must provide a safe and secure work environment –Must remain the top priority and never be compromised by other priorities –Must maintain the highest safety standards –Must be integrated into all work –Must have an unwavering commitment to the protection of workers and zero accidents/incidents –Must establish a safe workplace culture CPOF, DEAR –Payment of fee dependent upon, “…worker safety and health, including performance under an approved Integrated Safety Management System…” –If contractor does not meet…ES&H…fee may be unilaterally reduced by the contracting officer –Up to 100 percent of earned fee may be lost

Contractor Performance Assessment Report –Worker safety and health key consideration –Completed report cards used for source selection –Poor report card = reduced opportunities Bechtel BWXT Idaho fee earned based on production performance –Performance is safety based –Poor safety performance = lower production performance = production delays Safety Performance Affects Bottom Line

Financial Results st Period May 2005 through April

AMWTP Safety Committee formed Implemented maintenance work order system based on ISMS core functions BBWI assumes AMWTP Contract Implemented all-hands employee meetings May 2005 Implemented Employee Communications Program HPI training and error precursors Began use of direct-reading dosimeters Implemented AMWTP United Way participation May 2005 June 2005 July 2005 August 2005 Established reduced radiation dose goals through employee ALARA Committee Safety Committee reformed into the Employee Safety and Improvement Team Upgraded work order system to MAXIMO, significantly enhancing integration and data recording capabilities January 2006 February 2006 Conduct of Operations handbook issued to all employees Issued AMWTP Project Values Conduct of Operations improvements Phase I September 2005 October 2005 December M Safe Hours 3M Safe Hours Rem 33 6,470 m 3 TRU / 732 m 3 MLLW Total Recordable Case Rate for this contract period was 0.71 with 6 actual cases

Financial Results st Period May 2005 through April nd Period May 2006 through April

4M Safe Hours 5M Safe Hours 59 Rem 44 18,536 m 3 TRU / 2,319 m 3 MLLW 6M Safe Hours BBWI awarded two-year contract extension Began implementation of DOE orders in List B requirements Began ISMS implementation Implemented Keys Behavior-based Safety Program Implemented an enhanced systems engineering program May 2006 June 2006 July 2006 Received ISMS Phase I approval by DOE Map to Safety published Formalized pre/post-job briefings for all maintenance work Began labeling and isolation of higher dose containers September 2006 October 2006 December 2006 Implemented senior supervisory watch program for higher risk work activities Approval and implementation of our 10 CFR 851 H&S plan for worker safety Started Safety Bucks Campaigns Safety leadership training initiated ISMS Phase II implementation approved by DOE-ID May 2007 July 2007 October 2007 Total Recordable Case Rate for this contract period was 1.16 with 19 actual cases Implemented HPI analysis of all ORPS events, recordables, and first aids ALARA successes reduce overall dose by 50% ESIT elections BBWI awarded one-year contract extension January 2008 April 2008 May 2008

Financial Results st Period May 2005 through April nd Period May 2006 through April rd Period May 2008 through April

Implemented winter safety plan Safety emphasis on low-hazard activities Implement personal safety plans for all employees October 2008 November 2008 December 2008 Total Recordable Case Rate for this contract period was 0.77 with 6 actual cases KEYS observations focus on winter safety and recurrent injuries Employee safety video contest announced Implemented on-shift HPI mentors Employee safety video judging completed December 2008 February 2009 March 2009 May M Safe Hours 8M Safe Hours 33.7 Rem 18 23,855 m 3 TRU / 4,042 m 3 MLLW

Financial Results st Period May 2005 through April nd Period May 2006 through April rd Period May 2008 through April th Period May 2009 through September 2009 ~1.0 TBD

Total Recordable Case Rate for this contract period was 0 with 0 actual cases (current reporting rate from August 2008 through July 2009 is 0.62 with 5 cases) Million hours without OSHA recordable VPP Star status Approaching 9 million hours without lost time accident July 2009 Anticipate September M Forecast 9/09 7 Rem 5 25,455 m 3 TRU / MLLW Work Part of ARRA.77.62

Financial Results st Period May 2005 through April nd Period May 2006 through April rd Period May 2008 through April th Period May 2009 through September ~1.2 5th Period October 2009 through January 2010 TBD

Safety Excellence 8.8 million hours without a lost time accident

Active Employee Participation Active and engaged workforce KEYS – Keep everyone and yourself safe Employee communications Integrated ISM

Baseball nights Breakfast at the plant Ice cream celebrations Celebrating VPP Celebrating Working Safely Recognizing Human Performance excellence Safety is an inherent part of our culture, which we celebrate throughout the year:

The Bottom Line, Safety Pays AMWTP employees gather to raise the VPP Star site flag on Tuesday, July 28, 2009