PoA AFTER Cancun - READY TO TAKE OFF NOW

Slides:



Advertisements
Similar presentations
Requirement of New Rules for PoA: DOEs Perspective
Advertisements

Regional Policy Draft Guidance on ex-ante conditionalities Ad hoc expert meeting 6 March
UNFCCC Complexities in demonstration of additionality of a POA: Perspective of a Project Developer 8 th May 2011 Gareth Phillips Chairman, Project Developer.
Difficulties in Verification of a PoA: DOEs Perspective by Dr. Kaviraj Singh Workshop on Programme of Activities (PoA) under the CDM: Challenges and Road.
CDM Executive Board – status of work Q&A sessions at UNFCCC COP/MOP2 – November 2006 Mr. José Domingos Miguez Chair of the CDM Executive Board.
The Integration of PoA and NAMA; how can one support the other Ingo Puhl South Pole Carbon Asset Management Ltd. Bonn, 8. May 2011 Prepared by South Pole.
DNV Climate Change Services AS: Trine Kopperud 05 May 2011 DOEs perspective: DOE Liability in context of PoA Workshop on Programme of Activities under.
CONOR BARRY, Team Lead OSD UNFCCC Secretariat SDM programme Setting expectations of the workshop Bonn, 7- 8 May 2011 Workshop on Programme of Activities.
UNFCCC Recent Challenges in Implementing PoAs from a Commercial Perspective 8 th May 2011 Mischa Classen Senior Project Manager Regulatory Affairs and.
PoA Challenges & Opportunities
PoA for CFL lighting (using AMS-II.C.) A Case Study - Cuidemos Mexico May 2011.
T HE W ORLD B ANK C ARBON F INANCE U NIT I MPROVING SMALL SCALE TRANSPORTATION METHODOLOGIES : L ESSONS FROM E GYPTIAN VEHICLE SCRAPPING P O A. P RESENTATION.
BASELINE STANDARD UNFCCC secretariat workshop
UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, March.
Durban Decisions on the Clean Development Mechanism DUAN Maosheng Chair of the CDM Executive Board First SDM Joint Coordination Workshop Bonn,
Regional Distribution
Transparency and promotion of the CDM
TÜV NORD Calibration regarding project assessment requirements 7th CDM Joint Coordination Workshop 2011 Bonn,
UNFCCC secretariat, Sustainable Development Mechanisms Verónica Colerio, Standard Setting Unit Standardized Baselines in the CDM: Decisions and Way Forward.
JI Governance – review of JI Guidelines
A Project Developers view on lessons learned and challenges with PoAs (module 2.2) 24 March 2012 Mischa Classen Executive Committee, Project Developer.
Key recent developments in the CDM and JI Joint Coordination Workshop Bonn, Germany, March 2012 Andrew Howard, UNFCCC secretariat.
The CDM Policy Dialogue Margaret Mukahanana-Sangarwe Member, High-level Panel on the CDM Policy Dialogue FIRST SDM JOINT COORDINATION WORKSHOP Bonn, Germany,
Zertifizierung Project Cycle – Programme of Activities 7th CDM Joint Coordination Workshop Jun Wang; TÜV NORD CERT GmbH
GUIDELINES ON: (A) COMMON PRACTICE (B) ADDITIONALITY OF FIRST-OF-ITS KIND SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
UNFCCC secretariat, SDM Ronald Twesigye, Fellow A Case Study on The Uganda Municipal Solid Waste Compost Program The Seventh CDM Joint Coordination Workshop.
UNFCCC secretariat, Sustainable Development Mechanisms Programme Conor BARRY Improving and demonstrating efficiency in CDM processes 7 th Joint Coordination.
· © 2011 Perspectives GmbH Programme of Activities Lessons learnt & PoAs as a chance for CDM Host Countries UNFCCC.
UNFCCC, SDM/Standard Setting Unit Janak Shrestha, Programme Officer Current Status- Extension of simplified modalities for demonstration of additionality.
UNFCCC secretariat, programme Mayuresh Sarang, Team Lead - Accreditation Standards Team Module 2.2 Calibration regarding Accreditation Assessment Requirements.
CDM Regional Distribution Ensuring Broader Participation in the CDM Presented by: Albert Altarejos MAGALANG DNA Forum Chairing Committee.
Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25.
UNFCCC secretariat, Sustainable Development Mechanisms Programme Motoharu Yamazaki, Programme Officer, Process Management Unit REVISION OF VALIDATION AND.
Validation and verification report templates
Wrap-up session IV Module 4.1, Extension of simplified modalities for demonstration of additionality Mr. Peer Stiansen, CDM EB member 1 st Sustainable.
Presentation title 1st Sustainable Development Mechanisms Joint Coordination Workshop Module 2.4 Materiality Bonn, Germany, 24–25 March 2012 Marsha Cheddi.
Defining Standardized Baseline: The role of DNAs Malin Ahlberg Co-Chair of the DNA Forum 13 March 2011, Bonn.
SDM programme, UNFCCC secretariat Wenxin Li, Programme Officer Overview of PoA Standards SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
Dhirendra KUMAR UNFCCC Secretariat, Sustainable Development Mechansims Programme New Registration and Issuance Procedures 7 th CDM Joint Coordination Workshop.
UNFCCC secretariat, Sustainable Development Mechanisms Programme Modalities and procedures for direct communication with stakeholders 3/CMP 6, para. 21,
UNFCCC secretariat, SDM Olof Bystrom, Programme Officer Module 1.4 JI Project Cycle - Status of Implementation 1st SDM Joint Coordination Workshop Bonn,
UNFCCC secretariat, programme Gyungae Ha, Programme Officer Ensuring sustainability in project assessment 7 th CDM Joint Coordination Workshop, Bonn, Germany,
T HE W ORLD B ANK C ARBON F INANCE U NIT Standardised Baselines Framework March 24-25, Bonn.
“Workshop on PoA: Challenges and Road Ahead” Session 10: - Should liability be shared by DOE and PP/CME - Perspectives of DOEs DOE/AIE Forum | Werner Betzenbichler.
BLY CPA Verification- A DOE’ Perspective Archak Pattanaik New Delhi,
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
TÜV SÜD South Asia Programme of activities (PoA) - Requirements & Challenges in CPA inclusion By Vijayanand TÜV SÜD South Asia
CDM PoA CPA. What is a Programme of Activities? Definition: A programme of activities (PoA) is a voluntary coordinated action by a private or public.
T HE W ORLD B ANK C ARBON F INANCE U NIT PoAs and liability – the issue P RESENTATION AT UNFCCC P O A WORKSHOP M AY 2011 BY F ELICITY S PORS (F
UNFCCC Secretariat Status of negociations on CDM Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America and the Caribbean,Bogota, (31 –
UNFCCC How to address DOE Liability in context of PoA: Perspective of a Project Developer 8 th May 2011 Gareth Phillips Chairman, Project Developer Forum.
T HE W ORLD B ANK C ARBON F INANCE U NIT Extension of simplified modalities for demonstration of additionality to EE and RE projects.
· © 2012 Perspectives GmbH PoA Standards Courtney Blodgett Joint Coordination Workshop, Bonn 24 March 2012.
TÜV SÜD Industrie Service GmbH Workshop on PoA under the CDM: challenges and the road ahead - Bonn 8/9 May 2011 Session 9.1 „Application of Sampling in.
Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
UNFCCC Secretariat From PoA to NAMAs - Co-existence (opportunities and challenges) Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America.
Practical Experience with Small-scale Projects: Issues and Suggestions Johannes Heister, Lasse Ringius Carbon Finance Unit, World Bank Bonn, 9-10 March.
Best Practices for Preparing PoA- DD and CPA-DD UNFCCC Workshop on PoAs, 7 May 2011 Dr. Christoph Sutter CEO, South Pole Carbon Asset Management Patrick.
TÜV SÜD Industrie Service GmbH Workshop on PoA under the CDM: challenges and the road ahead - Bonn 8/9 May 2011 Session 8.1 „Additionality in the context.
Introduction of information note Compilation and analysis of available information on the scope, effectiveness and functioning of the flexibility mechanisms.
E:\The Carbon Market and Small Producers.ppt The Carbon Market and Small Producers 18 July, 2007 STRICTLY PRIVATE & CONFIDENTIAL.
TÜV SÜD Industrie Service GmbH CDM JCW Bonn 12 March 2011 Module 1.2 „existing barriers within the current PoA rules” An analysis from a DOEs perspective.“
UNFCCC secretariat, Sustainable Development Mechanisms programme Nashib Kafle, Associate Programme Officer Session 3: The Concept of Programme of Activities.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM-CAM) National Workshop on Capacity Development for the Clean Development.
“Workshop on PoA: Challenges and Road Ahead” Session 2: Challenges in implementation of PoA policy and procedures - Experiences and challenges from the.
Standardized baselines
CDM Activity Cycle under the Marrakech Accords
Joint implementation programmes of activities (JI PoA)
Presentation transcript:

PoA AFTER Cancun - READY TO TAKE OFF NOW Presentation title PoA AFTER Cancun - READY TO TAKE OFF NOW SEVENTH CDM JOINT COORDINATION WORKSHOP Bonn, Germany 12 - 13 March 2011 Massamba THIOYE, Manager of the Standard Setting Unit UNFCCC secretariat, programme

THE CMP MANDATE Requests the Executive Board to reassess its existing regulations related to PoA in order to: (a) Further clarify the application of existing rules regarding the demonstration of additionality to PoAs and the definition of eligibility criteria for the CPA inclusion in a PoA; and

DEFINITION A PoA is a voluntary coordinated action by a private or public entity which coordinates and implements any policy/measure or stated goal, via an unlimited number of CDM project activities (CPAs)

WHAT IS A PoA CDM rules 10 independent projects 10 independent PPs 10 PDDs developed 10 validations 10 registrations by UNFCCC to get in the CDM 10 verifications each year to generate CERs 5 kT 5 kT CDM rules 5 kT 5 kT 5 kT 5 kT 5 kT 5 kT 5 kT 5 kT 5 kT 5 kT 5 kT

WHAT IS A PoA CDM rules PoA PoA rules 01 PoA 01 Coordinator, unlimited number of participants Unlimited number of CPAs not identified ex ante During 28 years in the boundary 01 validation to get the PoA with 01 CPA in the CDM 09 validations to get the CPAs in the PoAs 01 verification each year to generate CERs based on sampling 5 kT PoA rules 5 kT CDM rules PoA 5 kT 5 kT 5 kT 5 kT 5 kT 5 kT 5 kT 5 kT 5 kT 5 kT 5 kT 5 kT

ADDITIONALITY OF THE PoA Demonstration that in the absence of the CDM either: the proposed voluntary measure would not be implemented, or the mandatory policy/regulation would be systematically not enforced, or that the PoA will lead to a greater level of enforcement of the existing mandatory policy /regulation No guidance on how to establish that a voluntary measure would not be implemented without CDM

ADDITIONALITY OF THE PoA Approaches for additionality demonstration: The project is not attractive; or The project might be attractive but faces barriers; or The project is attractive but there is another more attractive option of investment; or The performance of the measure is higher than a benchmark performance - Measure is not meant to be attractive - Option 4 more suitable but not always applicable

ADDITIONALITY CRITERIA What is to be demonstrated at the PoA level is: the policy/measure leads to performances that are higher than a benchmark if relevant under the specific conditions of the PoA, a CPA that meet the criteria of inclusion in the PoA, meet the general criteria for additionality demonstration A PoA DD is a standard for additionality demonstration. The PoA has to establish that compliance with its eligibility criteria ensures compliance with the general requirements for additionality demonstration

INCLUSION CRITERIA OF CPAs Presentation title INCLUSION CRITERIA OF CPAs The eligibility criteria, shall allow for demonstration that the CPA is an activity that: Is triggered by the implementation of the policy/measure and would not occur in the absence of the PoA; or Is triggered by the enforcement of the mandatory policy/regulation and would not occur in the absence of the PoA

INCLUSION CRITERIA OF CPAs They are translations of the general requirements in the CDM standards into simpler requirements specific to the PoA For additionality, the PoA could translate the general requirements for additionality demonstration into inclusion criteria Additionality is to be demonstrated/assessed at the CPA level against the inclusion criteria

EXAMPLES Feed-in tariff for renewable If the most important parameters for the attractiveness of a wind farm are the power capacity P and the average wind speed S, the criteria for inclusion of a wind farm CPA might be related to P and S The PoA can establish that for values of P and S below defined thresholds, the IRR of a CPA will be lower than the benchmark

EXAMPLES P Not Additional Additional S Demonstrating additionality of a CPA consists of showing that the (P,S) values of the CPA is below the limit curve

EXAMPLES For the diffusion of small appliances (e.g. ICS), an investment analysis is not necessarily the most relevant approach The penetration rate of the appliance might be one criteria for inclusion of a CPA in the PoA that addresses the additionality issue Only CPAs in regions where the penetration rate is lower than a threshold can be eligible for inclusion in the PoA Only CPAs that leads to performance higher than a threshold defined in the PoA are eligible

LIABILITY ISSUE Clarification of what is meant by erroneous inclusion of CPA: Inclusion of a CPA that does not meet the eligibility criteria of the registered PoA. Risk = Probability of occurrence *Impact

THANK YOU FOR YOUR ATTENTION