GUIDELINES ON: (A) COMMON PRACTICE (B) ADDITIONALITY OF FIRST-OF-ITS KIND SDM JOINT COORDINATION WORKSHOP Bonn, Germany, 24-25 March 2012.

Slides:



Advertisements
Similar presentations
1 Accessibility Forum Projects Bill Hetzner Jim Kindrick.
Advertisements

Paulo Manso CDM EB September, 2011 Proceeder for Submission & Approval Standardized Baselines.
CDM Executive Board – status of work Q&A sessions at UNFCCC COP/MOP2 – November 2006 Mr. José Domingos Miguez Chair of the CDM Executive Board.
CONOR BARRY, Team Lead OSD UNFCCC Secretariat SDM programme Setting expectations of the workshop Bonn, 7- 8 May 2011 Workshop on Programme of Activities.
Presented by: Lex de Jonge Vice-Chair CDM Executive Board Clean Development Mechanism EB perspective on recent developments, with a focus on Registration.
UNFCCC Recent Challenges in Implementing PoAs from a Commercial Perspective 8 th May 2011 Mischa Classen Senior Project Manager Regulatory Affairs and.
T HE W ORLD B ANK C ARBON F INANCE U NIT I MPROVING SMALL SCALE TRANSPORTATION METHODOLOGIES : L ESSONS FROM E GYPTIAN VEHICLE SCRAPPING P O A. P RESENTATION.
BASELINE STANDARD UNFCCC secretariat workshop
UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, March.
SDM programme, UNFCCC secretariat Kishor Rajhansa, Programme Officer STATUS AND WAY FORWARD ON STANDARDIZED BASELINES UNFCCC Joint coordination Workshop.
Durban Decisions on the Clean Development Mechanism DUAN Maosheng Chair of the CDM Executive Board First SDM Joint Coordination Workshop Bonn,
Regional Distribution
Additionality - Module 2.1 Challenges of the new Additionality Tool 6.0 and related questions 24 th March 2012 Dr. Sven Kolmetz Executive Committee Member,
TÜV NORD Calibration regarding project assessment requirements 7th CDM Joint Coordination Workshop 2011 Bonn,
JI Governance – review of JI Guidelines
PoA AFTER Cancun - READY TO TAKE OFF NOW
Key recent developments in the CDM and JI Joint Coordination Workshop Bonn, Germany, March 2012 Andrew Howard, UNFCCC secretariat.
The CDM Policy Dialogue Margaret Mukahanana-Sangarwe Member, High-level Panel on the CDM Policy Dialogue FIRST SDM JOINT COORDINATION WORKSHOP Bonn, Germany,
UNFCCC secretariat, Sustainable Development Mechanisms Programme Conor BARRY Improving and demonstrating efficiency in CDM processes 7 th Joint Coordination.
UNFCCC secretariat Enhanced Interactions and Direct Communication – Policy matters First SDM Joint Coordination Workshop Bonn, Germany, March 2012.
UNFCCC, SDM/Standard Setting Unit Janak Shrestha, Programme Officer Current Status- Extension of simplified modalities for demonstration of additionality.
UNFCCC secretariat, programme Mayuresh Sarang, Team Lead - Accreditation Standards Team Module 2.2 Calibration regarding Accreditation Assessment Requirements.
Wrap-up session for Module 2.1 (Additionality) Presenters: UNFCCC secretariat, MP member, PD Forum, and TÜV SÜD 1 st Sustainable Development Mechanisms.
Wrap-up session : Global and Local Stakeholder Consultation Process 1 st Sustainable Development Mechanisms Joint Coordination Workshop Maritim Hotel Bonn.
Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25.
UNFCCC secretariat, Sustainable Development Mechanisms Programme Motoharu Yamazaki, Programme Officer, Process Management Unit REVISION OF VALIDATION AND.
Wrap-up session 1 st Sustainable Development Mechanisms Joint Coordination Workshop Maritim Hotel Bonn Germany, March 2012.
Validation and verification report templates
Motoharu Yamazaki UNFCCC secretariat (SDM Programme) Alignment of CDM and JI accreditation processes 1 st Sustainable Development Mechanisms Joint Coordination.
Wrap-up session III Module 3.2 – Alignment of the Accreditation Procedures 1 st Sustainable Development Mechanisms Joint Coordination Workshop Maritim.
Wrap-up session IV Module 4.1, Extension of simplified modalities for demonstration of additionality Mr. Peer Stiansen, CDM EB member 1 st Sustainable.
Presentation title 1st Sustainable Development Mechanisms Joint Coordination Workshop Module 2.4 Materiality Bonn, Germany, 24–25 March 2012 Marsha Cheddi.
UNFCCC secretariat, SDM Verónica García, Team Lead of Entity Assessment ASSESSMENT TEAMS 7 th CDM Joint Coordination Workshop Bonn, Germany March 12, 2011.
. CDM Project Cycle Calibration Melanie Eddis ERM Certification and Verification Services (ERM CVS) CDM Coordination Meeting UNFCCC, Bonn March 2012.
CCS – OVERVIEW OF THE MODALITIES AND PROCEDURES AND THEIR IMPLEMENTATION SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
SDM programme, UNFCCC secretariat Wenxin Li, Programme Officer Overview of PoA Standards SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
Implementation of the Suppressed Demand Guidelines in New and Existing SSC Methodologies Carolyn Luce, Small Scale Working Group Member FIRST SDM JOINT.
CDM METHODOLOGIES IMPROVEMENT 7 th CDM Joint Coordination Workshop th March 2011, Bonn, Germany Anne-Sophie Zirah - March 2011.
Dhirendra KUMAR UNFCCC Secretariat, Sustainable Development Mechansims Programme New Registration and Issuance Procedures 7 th CDM Joint Coordination Workshop.
Maritim Hotel Bonn Germany, March 2012 Wrap-up session III and IV Module 4.3 – Governance of JI Mr. Wolfgang Seidel 1 st Sustainable Development.
UNFCCC secretariat, Sustainable Development Mechanisms Programme Modalities and procedures for direct communication with stakeholders 3/CMP 6, para. 21,
UNFCCC secretariat, programme Fleur Newman, Programme Officer Breakout session 4.2 Procedure on significant deficiencies CMP & EB Mandates and 2012 Process.
UNFCCC secretariat, SDM Olof Bystrom, Programme Officer Module 1.4 JI Project Cycle - Status of Implementation 1st SDM Joint Coordination Workshop Bonn,
SDM programme UNFCCC secretariat Current status of the implementation of Guidelines on the consideration of suppressed demand in CDM methodologies FIRST.
Wrap-up session: Suppressed Demand Gajanana Hegde, UNFCCC Secretariat Carolyn Luce, SSC WG Anja Kollmuss, CDM Watch Steve Thorne, SouthSouthNorth Steve.
SDM programme UNFCCC secretariat Implementation of new procedures, standards, tools and guidelines 1 st Sustainable Development Mechanisms Joint Coordination.
Wrap-up session 1 st Sustainable Development Mechanisms Joint Coordination Workshop Maritim Hotel Bonn Germany, March 2012.
UNFCCC secretariat, programme Firstname Lastname, Job Title PoAs: Applications, Current developments, revised standards, innovative approaches 7 th Joint.
IPCC Good Practices Guidance and the electronic reporting of GHG inventory tables: useful tools for improving the quality of national GHG inventories of.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
UNFCCC Secretariat SDM programme Wrap-up Session: Key Issues Identified and Proposals discussed Practitioners’ workshop on Standardized baselines Bonn,
UNFCCC Secretariat Status of negociations on CDM Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America and the Caribbean,Bogota, (31 –
Task Force on National Greenhouse Gas Inventories Tier 3 Approaches, Complex Models or Direct Measurements, in Greenhouse Gas Inventories Report of the.
Reporting on SD co-benefits using the new CDFM SD Tool and opportunities for monitoring to enhance the profile of CDM projects and CER price: what the.
Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
Björn Zapfel UNFCCC secretariat JI small-scale projects Fourth meeting of the Joint Implementation Supervisory.
Module Calibration regarding accreditation assessment requirements Calibration through enhanced CDM-AP direct communication with stakeholders (DOEs/ATs)
1 Second Regional Workshop Capacity Development for the Clean Development Mechanism (CD4CDM) 23 March 2004 Siem Reap, Cambodia Review and Future Plan of.
1 NATIONAL SYSTEMS UNFCCC Workshop on National Systems under Article 5, paragraph 1, of the Kyoto Protocol 11–12 April 2005 Wissenschaftszentrum, Bonn,
Verónica García Malo UNFCCC secretariat SDM / PEA Module 3.2 Alignment of CDM and JI accreditation processes 1st SDM Joint Coordination Workshop Bonn,
JISC work on Small Scale JI Projects UNFCCC Technical Workshop on Joint Implementation Bonn 9 th March 2006 By: Fatou Ndeye Gaye and Evgeny Sokolov.
Standardized baselines
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
FIRST SDM JOINT COORDINATION WORKSHOP
Q&A sessions at UNFCCC SB26
Presentation title Maritim Hotel Bonn Germany, March 2012
Enhanced Interaction and Direct Communication
Development of determination and verification manual (DVM)
Work Accomplished by JISC
Presentation transcript:

GUIDELINES ON: (A) COMMON PRACTICE (B) ADDITIONALITY OF FIRST-OF-ITS KIND SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012

2 Background The CMP requested the Board to develop guidance on First of its kind and Common practice Draft guidelines were developed and, following a call for public inputs, adopted by EB63 in September 2011 EB65 revised the Additionality tool and the Combined tool to incorporate the provisions contained in the guidelines CMP7 requested the Board further improve the guidelines on the use of first-of-its-kind and the assessment of common practice, on the basis of the application of those guidelines to project activities

3 Guidelines on common practice (EB 63, Annex 12) Define the terms Applicable geographical area, Measure, Output, and Different technologies. Identify all plants in the applicable geographical area which have a capacity in the range defined by the project plant capacity 50% (N ALL ) Out of these plants, identify the plants that apply different technologies from the project technology (N DIFF ) Calculate the share of similar technologies: F = 1 – N DIFF /N ALL The project activity is common practice if (i) F > 0.2, and (ii) N ALL – N DIFF > 3

4 Guidelines First-of-its-kind project activities (EB 63, Annex 11) Define the terms Applicable geographical area, Measure, Output, and Different technologies. A project activity is First-of-its-kind if: (i) it is the first in the applicable geographical area; (ii) applies a different technologies from other activities that deliver the same output and that had started commercial operation before the start date of the project; and (iii) opts for a crediting period of a maximum of 10 years with no option of renewal A proposed project activity that is First-of-its-kind is additional (i.e. it does not require barrier analysis, financial analysis or common practice analysis).

5 Concerns raised by stakeholders (1) The new guidelines on common practice, instead of clarifying the steps of existing common practice analysis, introduce a completely new approach The data to apply the concept is not always publicly available Registered CDM projects may in the future be included for the purpose of defining the common practice threshold The strict criterion of first does not recognise barriers faced by the early adopters of new technologies; if there is more than one plant using a technology, it does not mean that the barriers are not there. The concept of first of its kind should not be linked to a 10 year crediting period

6 Concerns raised by stakeholders (2) The term measures is used in two different ways in the revised combined tool and additionality tool which allows for two interpretations The definition of different technologies fails to encourage development of new technologies. For example, a switch from biomass combustion to biomass gasification would require the adoption of a new technology but according to the definition it would not be different since the fuel remains the same. The definition of applicable geographical area is less clear than before

7 Next steps The Board and the UNFCCC secretariat will evaluate the comments from stakeholders and the practical application of the concept in project activities An information is planned to be prepared for EB69 Revised tools, improving the concept, are planned to be adopted at EB70