UN Climate Change Secretariat, SDM Dhirendra Kumar MODULE 3.1 DIRECT COMMUNICATION ON CASE SPECIFIC ISSUES 1 st SDM Joint Coordination Workshop Bonn, Germany 25 th March 2012
PCP Requirements on Direct Communication Direct Communication – Issues of Editorial Nature Direct Communication – Clarifications on issues Outline of the presentation
PCP Requirements on Direct Communication Process / Stages CC (Editorial)IRC (Editorial) IRC (Clarification) Review / SN Clarifications RegistrationPCP (61)PCP (64)PCP (67)PCP (78) IssuancePCP (139)PCP (190)PCP (193)PCP (204) DeviationPCP (40)--- PCP (44) Approval of changes PCP (187)--- PCP (143)
Direct Communication – Issues of Editorial Nature For issues of editorial nature identified during the Completeness Checks (CC) or Information & Reporting Check (IRC), Secretariat will try their best to notify the DOE within defined timeline (7 days for CC & 23 days for IRC). For cases for which similar issues are identified by Secretariat in the last two days of the CC / IRC timeline, at least the notification will be sent to the DOE within defined timeline. For such exceptional cases (as above), the conclusion of CC / IRC is expected to be delayed by 1 or 2 days than the defined timelines. Secretariat will make public the list of issues of editorial nature for Completeness Check and Information & Reporting Check by 1st May Missing documents would be treated in line with the current practice.
Direct Communication – Clarifications on issues Secretariat will make public the dedicated address for this communication before 1st May To simplify the screening of s meant for direct communication, the subject line of the will be communicated before 1 st May Secretariat will notify the DOE or PP/CME about the date of the telephone call appointment within 3 days of such request received and subsequently the teleconference will be organized on the mutually agreed date and time slot in future. Any authorized person from a DOE can be the contact point for the teleconference. The contact point from a PP/CME for the teleconference shall either be the project specific focal point itself or the person authorized by the project specific focal point.
For more information: Enquiries can be sent to: Thank you!