Research group on Logistics and International Business School of Economics and Management Sciences Universidad de La Sabana Chía, Colombia.

Slides:



Advertisements
Similar presentations
IGLS/1 © P. Pongcharoen Using Genetic Algorithms for Scheduling the Production of Capital Goods P. Pongcharoen, C. Hicks, P.M. Braiden, A.V. Metcalfe,
Advertisements

Algorithm Design Methods (I) Fall 2003 CSE, POSTECH.
CITY LOGISTICS “Is the process of totally optimising the logistics and transport activities by private companies in urban areas while considering the traffic.
Logistics Network Configuration
January 6. January 7 January 8 January 9 January 10.
Multi-Objective Optimization NP-Hard Conflicting objectives – Flow shop with both minimum makespan and tardiness objective – TSP problem with minimum distance,
] Real Costing Raul Morales Business Development.
CSE 460 Hybrid Optimization In this section we will look at hybrid search methods That combine stochastic search with systematic search Problem Classes.
1 Investing the LANCS Resources Edmund Burke Nottingham / Stirling Sanja Petrovic LANCS Initiative Scientific and Industrial Advisory Board November
Planning and Optimisation of a Complex Multinational Supply Chain – A Real-life Case Study Mr. Masoud Esmaeili RMIT University Dr. Behnam Fahimnia UniSA,
Integrated Decision Support and Optimization ICT Roadmap For Minerals & Energy Resources: Industry Roundtable - 16 Oct 2013 James Balzary.
END332E Operations Research II Y. İlker TOPCU, Ph.D
Master of Science in Management Science. MSc (Management Science) zThis degree will provide students with advanced skills in applied statistics, operations.
University of Minho School of Engineering Centre Algoritmi Uma Escola a Reinventar o Futuro – Semana da Escola de Engenharia - 24 a 27 de Outubro de 2011.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Genetic Algorithms for multiple resource constraints Production Scheduling with multiple levels of product structure By : Pupong Pongcharoen (Ph.D. Research.
Reporter : Mac Date : Multi-Start Method Rafael Marti.
A Comparative Study Of Deterministic And Stochastic Optimization Methods For Integrated Design Of Processes Mario Francisco a, Silvana Revollar b, Pastora.
Supply Chain Design Problem Tuukka Puranen Postgraduate Seminar in Information Technology Wednesday, March 26, 2009.
Better Ants, Better Life? Hybridization of Constraint Programming and Ant Colony Optimization Supervisors: Dr. Bernd Meyer, Dr. Andreas Ernst Martin Held.
© P. Pongcharoen ISA/1 Applying Designed Experiments to Optimise the Performance of Genetic Algorithms for Scheduling Capital Products P. Pongcharoen,
Production Planning (Aggregate Planning). SOM 464: Manufacturing Resource Planning Study of the efficient allocation of resources (material, equipment,
SCHEDULING AIRCRAFT LANDING Mike Gerson Albina Shapiro.
Metaheuristics Meta- Greek word for upper level methods
Models Physical: Scale, Analog Symbolic: Drawings Computer Programs Mathematical: Analytical (Deduction) Experimental (Induction)
Operations Research Models
Scheduling and Scheduling Philosophies By Nilesh Sivaramakrishnan For IEM 5303.
CSM6120 Introduction to Intelligent Systems Other evolutionary algorithms.
CRESCENDO Full virtuality in design and product development within the extended enterprise Naples, 28 Nov
European Network of Excellence in AI Planning Intelligent Planning & Scheduling An Innovative Software Technology Susanne Biundo.
Optimized Search Heuristics: a Survey Susana Fernandes Universidade do Algarve Faro, Portugal Helena Ramalhinho Lourenço Universitat Pompeu.
Funding Opportunities and Challenges at NSF Jesús M. de la Garza, Ph.D. Program Director Division of Civil and Mechanical Systems Directorate for Engineering.
Activités de recherche au LGI Céline Gicquel. Supply chain planning matrix ProcurementProductionDistributionSales Supply Network Design Master Planning.
Edward Tsang Research Business applications of Artificial Intelligence Constraint satisfaction & optimization research –A branch of combinatorial optimisation.
Supply Chain Management AN INITIATIVE BY: VAINY GOEL BBA 1 MODI COLLEGE.
Introduction to Design and Manufacture Supply Chain Analysis (K. Khammuang & H. S. Gan) A scientific approach to decision making, which seeks to.
Ant Colony Optimization Algorithms for TSP: 3-6 to 3-8 Timothy Hahn February 13, 2008.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Ant Algorithm and its Applications for Solving Large Scale Optimization Problems on Parallel Computers Stefka Fidanova Institute for Information and Communication.
ZEIT4700 – S1, 2015 Mathematical Modeling and Optimization School of Engineering and Information Technology.
Operations Research The OR Process. What is OR? It is a Process It assists Decision Makers It has a set of Tools It is applicable in many Situations.
Managerial Decision Modeling with Spreadsheets Chapter 1 Introduction to Managerial Decision Modeling.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #13.
Operations Research Models and Methods Advanced Operations Research Reference: Operations Research Models and Methods, Operations Research Models and Methods,
1 Revision Main textbooks: Operations Scheduling with Applications in Manufacturing and Services, Michael Pinedo and Xiuli Chao, McGraw Hill, Scheduling,
© P. Pongcharoen CCSI/1 Scheduling Complex Products using Genetic Algorithms with Alternative Fitness Functions P. Pongcharoen, C. Hicks, P.M. Braiden.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Production Planning (Aggregate Planning). SOM 464: Manufacturing Resource Planning Study of the efficient allocation of resources (material, equipment,
For hydrocarbons 1.
SIMULATION SIMULAND PURPOSE TECHNIQUE CREDIBILITY PROGRAMMATICS
Master of Science in Management Science
Structural Funds Programming Predeal, Romania
Supply Chain Management (SCM) Basics
IEEE CFETC Computational Finance and Economics Technical Committee
General Purpose Procedures Applied to Scheduling
Tomorrow’s logistics. We are finding the answers.
Dept. of MMME, University of Newcastle upon Tyne
END332E Operations Research II
Dept. of MMME, University of Newcastle upon Tyne
“Hard” Optimization Problems
Efficient Approaches to Scheduling
Planning and Scheduling in Manufacturing and Services
END332E Operations Research II
Proud As A Peacock! We are very proud of__________________
Dept. of MMME, University of Newcastle upon Tyne
Management Information Systems
2015 January February March April May June July August September
Presentation transcript:

Research group on Logistics and International Business School of Economics and Management Sciences Universidad de La Sabana Chía, Colombia

Objective Analysis and generation of new knowledge, socially responsible, applied to the design, analysis and evaluation of the set of processes that constitutes the physical and informational structures of the value chain

Members Group Director –Jairo R. Montoya Torres, Ph.D. Researchers –Elyn Solano Charris, M.Sc., PhD(c) –Carlos Quintero Araujo, M.Sc. –Ana Ximena Halabi Echeverry, M.Sc., PhD(c) –Vanessa Manotas Niño, M.Sc. –Catherine Pereira Villa, MA –Monica Hurtado Lozano, MA

Research lines Strategic Logistics Operations Management Sustainability International trade

Finished Projects September 2007 – March 2008 “Modeling of vehicle positioning problems” –Supported by Research funds from Universidad de La Sabana, Chia (Colombia). Grant number CEA –Total cost of project US$ Techniques: –Mathematical programming,,greedy heuristics –Simulation Results: –Integer linear programming formulation of the vehicle positioning problem in automated manufacturing systems: ILP formulation (tactical level) – ILP+Discrete event simulation (operational level)

Finished Projects September 2008 – August 2010 “Analogies between algorithms for solving Resources-constrained project scheduling, machine scheduling and other combinatorial optimization problems” –Supported by Research funds from Universidad de La Sabana, Chia (Colombia). Grant number CEA –Total cost of project US$ for 20 months. Techniques: –Mathematical programming, ACO, genetic & memetic algorithms, GRASP

Finished Projects Results: Deterministic machine scheduling with release times and sequence-dependent setups using random-insertion heuristics: Makespan between 2-6% of the optimal. Average deviation from bound (9,9% equal release time – 12,2% unequal release time) Project scheduling with limited resources using a genetic algorithm: Makespan value equal to optimum or best known heuristics for more than 50% of the studied instances Ant colony optimization algorithm for a Bi-criteria 2-stage hybrid flowshop scheduling problem: First procedure for bi- criteria (makespan ant total completion time of jobs) for hybrid flowshop configuration.

Finished Projects April 2009 – February 2010 “Conceptual framework of reverse logistics practices in Colombian enterprises”. –Supported as a Young researcher grant from COLCIENCIAS (Colombian Administrative Department of Science and Technology). Grant number –Total cost of project US$ for 12 months. Techniques: –Survey-based research Results: –A modeling framework of reverse logistics practices in the Colombian plastic sector: first exploratory study on the analysis of RL practices in Colombian enterprises

Ongoing Projects October 2010 – May 2012 “Multi-objective optimisation for complex hybrid flowshop scheduling systems using ant colony meta-heuristic”. –Supported by Re-search funds from Universidad de La Sabana, Chia (Colombia). Grant number CEA –Total cost of project US$ for 19 months. Techniques: –Multi-objective ACO procedure

Ongoing Projects January 2011 – March 2012 “Optimization tools for solving distribution problems to retail points in emerging markets”. –Supported by Research funds from Universidad de La Sabana, Chia (Colombia). Grant number ING –Total cost of project US$ for 14 months. Amount awarded: US$ Techniques: –Mathematical programming

Ongoing Projects 2011 – 2013 “Integrated optimization of the palm-oil supply chain management in Colombia”. –Supported by the Colombia Administrative Department of Science and Technology (COLCIENCIAS). –Total cost: US$ , Amount granted: US$ Techniques: –Mathematical programming

Ongoing Projects 2012 –2013 “Redesign of transport logistics operations of hazardous material through the development and evaluation of a portable prototype of a mobile autonomous hydro-washing machine” –Co-supported by the Colombia Administrative Department of Science and Technology (COLCIENCIAS) and by a Colombian enterprise INTERTANQUES. –Total cost: US$ , Amount granted: US$ for 18 months. Techniques to be used: –Mathematical programming, Simulation

Ongoing Projects 2011 – 2012 “Multi-objective optimization for the vehicle routing problem with load-balancing” –M.Sc. In Operations Management – Master’s Thesis Techniques to be used: –Mathematical programming, Taboo Search