Maritim Hotel Bonn Germany, 24-25 March 2012 Wrap-up session III and IV Module 4.3 – Governance of JI Mr. Wolfgang Seidel 1 st Sustainable Development.

Slides:



Advertisements
Similar presentations
Paulo Manso CDM EB September, 2011 Proceeder for Submission & Approval Standardized Baselines.
Advertisements

UNFCCC Recent Challenges in Implementing PoAs from a Commercial Perspective 8 th May 2011 Mischa Classen Senior Project Manager Regulatory Affairs and.
BASELINE STANDARD UNFCCC secretariat workshop
UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, March.
SDM programme, UNFCCC secretariat Kishor Rajhansa, Programme Officer STATUS AND WAY FORWARD ON STANDARDIZED BASELINES UNFCCC Joint coordination Workshop.
Durban Decisions on the Clean Development Mechanism DUAN Maosheng Chair of the CDM Executive Board First SDM Joint Coordination Workshop Bonn,
SDM Strategy SDM Joint Coordination Workshop
UNFCCC secretariat, Sustainable Development Mechanisms Verónica Colerio, Standard Setting Unit Standardized Baselines in the CDM: Decisions and Way Forward.
. Melanie Eddis ERM Certification and Verification Services (ERM CVS) CDM Coordination Meeting UNFCCC, Bonn March 2012 Materiality in the CDM Experiences.
JI Governance – review of JI Guidelines
Key recent developments in the CDM and JI Joint Coordination Workshop Bonn, Germany, March 2012 Andrew Howard, UNFCCC secretariat.
The CDM Policy Dialogue Margaret Mukahanana-Sangarwe Member, High-level Panel on the CDM Policy Dialogue FIRST SDM JOINT COORDINATION WORKSHOP Bonn, Germany,
GUIDELINES ON: (A) COMMON PRACTICE (B) ADDITIONALITY OF FIRST-OF-ITS KIND SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
UNFCCC secretariat, Sustainable Development Mechanisms Programme Conor BARRY Improving and demonstrating efficiency in CDM processes 7 th Joint Coordination.
UNFCCC secretariat Enhanced Interactions and Direct Communication – Policy matters First SDM Joint Coordination Workshop Bonn, Germany, March 2012.
Wrap-up session for Module 2.1 (Additionality) Presenters: UNFCCC secretariat, MP member, PD Forum, and TÜV SÜD 1 st Sustainable Development Mechanisms.
Wrap-up session : Global and Local Stakeholder Consultation Process 1 st Sustainable Development Mechanisms Joint Coordination Workshop Maritim Hotel Bonn.
Wrap-up session 1 st Sustainable Development Mechanisms Joint Coordination Workshop Maritim Hotel Bonn Germany, March 2012.
Validation and verification report templates
Transitional measures for Joint Implementation Benoît Leguet, Member of the JISC March 25, 2012.
Wrap-up session 1 st Sustainable Development Mechanisms Joint Coordination Workshop Maritim Hotel Bonn Germany, March 2012.
Motoharu Yamazaki UNFCCC secretariat (SDM Programme) Alignment of CDM and JI accreditation processes 1 st Sustainable Development Mechanisms Joint Coordination.
Wrap-up session III Module 3.2 – Alignment of the Accreditation Procedures 1 st Sustainable Development Mechanisms Joint Coordination Workshop Maritim.
Wrap-up session IV Module 4.1, Extension of simplified modalities for demonstration of additionality Mr. Peer Stiansen, CDM EB member 1 st Sustainable.
UNFCCC secretariat, Sustainable Development Mechanisms Programme Conor BARRY Update on the Nairobi Framework Partnership 1 st SDM Coordination Workshop.
Presentation title 1st Sustainable Development Mechanisms Joint Coordination Workshop Module 2.4 Materiality Bonn, Germany, 24–25 March 2012 Marsha Cheddi.
. CDM Project Cycle Calibration Melanie Eddis ERM Certification and Verification Services (ERM CVS) CDM Coordination Meeting UNFCCC, Bonn March 2012.
CCS – OVERVIEW OF THE MODALITIES AND PROCEDURES AND THEIR IMPLEMENTATION SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
SDM programme, UNFCCC secretariat Wenxin Li, Programme Officer Overview of PoA Standards SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
Implementation of the Suppressed Demand Guidelines in New and Existing SSC Methodologies Carolyn Luce, Small Scale Working Group Member FIRST SDM JOINT.
UNFCCC secretariat, Sustainable Development Mechanisms Programme Modalities and procedures for direct communication with stakeholders 3/CMP 6, para. 21,
UNFCCC secretariat, programme Fleur Newman, Programme Officer Breakout session 4.2 Procedure on significant deficiencies CMP & EB Mandates and 2012 Process.
UNFCCC secretariat, SDM Olof Bystrom, Programme Officer Module 1.4 JI Project Cycle - Status of Implementation 1st SDM Joint Coordination Workshop Bonn,
Maritim Hotel Bonn Germany, March 2012 Wrap-up session I Module Regional Distribution/Nairobi Framework Mr. Giza Martins, Co-Chair of the DNA.
Direction générale de lénergie et du climat Standing challenges for JI First SDM Joint Coordination Workshop 24 – 25 March Bonn Dimitar Nikov.
SDM programme UNFCCC secretariat Current status of the implementation of Guidelines on the consideration of suppressed demand in CDM methodologies FIRST.
Wrap-up session 1 st Sustainable Development Mechanisms Joint Coordination Workshop Maritim Hotel Bonn Germany, March 2012.
Wrap-up session: Suppressed Demand Gajanana Hegde, UNFCCC Secretariat Carolyn Luce, SSC WG Anja Kollmuss, CDM Watch Steve Thorne, SouthSouthNorth Steve.
SDM programme UNFCCC secretariat Implementation of new procedures, standards, tools and guidelines 1 st Sustainable Development Mechanisms Joint Coordination.
Wrap-up session 1 st Sustainable Development Mechanisms Joint Coordination Workshop Maritim Hotel Bonn Germany, March 2012.
Seite First Sustainable Development Joint Coordination Workshop Module 4.3 Governance of JI Governance and revision of JI guidelines Traude.
Preparatory work on JI in Bulgaria Milya Dimitrova Ministry of Environment and Water, Bulgaria UNFCCC Technical Workshop on Joint Implementation
CDM EB Experience and lessons for JI Mr. LU Xuedu March 8-9, 2006 Bonn, Germany.
Ms. Daniela Stoycheva Chair of the JISC COP/MOP 2, Nairobi 14 November 2006 JI Track 2 procedure and its role in JI Track 2 projects UNFCCC Side Event.
Revision of key attributes and transitional measures relating to possible changes in the JI guidelines Wolfgang Seidel, Chair of the Joint Implementation.
1 Georg B ø rsting Chair of the JI Supervisory Committee Joint Implementation 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop on means to.
Accreditation of Independent entities under JI - Status of JISC work Georg B ø rsting UNFCCC Technical Workshop on Joint Implementation, 9-10 March 2006.
The role of European standards and guidelines for the development of the national system of independent assessment of the quality of higher education Seidakhmetova.
1 Andrew Howard Climate Change Secretariat Emissions trading and project-based mechanisms 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop.
CDM National Authorities : an Example Prepared for the National Workshop on Capacity Development for Clean Development Mechanism (CD4CDM) March 2003,
Status of Joint Implementation and Green Investment Scheme Vlad Trusca Ministry of Environment and Sustainable Development Romania - Annual meeting of.
Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
Cooperative Mechanisms UNFCCC secretariat JI under UNFCCC - An overview -
Björn Zapfel UNFCCC secretariat JI small-scale projects Fourth meeting of the Joint Implementation Supervisory.
Markets & Mechanisms Developments inside and outside the UNFCCC negotiations. Building and Urban Methodologies Workshop UNFCCC, Bonn, March 2014.
Introduction of information note Compilation and analysis of available information on the scope, effectiveness and functioning of the flexibility mechanisms.
Verónica García Malo UNFCCC secretariat SDM / PEA Module 3.2 Alignment of CDM and JI accreditation processes 1st SDM Joint Coordination Workshop Bonn,
JI Project Cycle Status and observations Morten Prehn Sorensen FIRST SDM JOINT COORDINATION WORKSHOP Maritim Hotel Bonn, Germany March 2012.
JISC work on Small Scale JI Projects UNFCCC Technical Workshop on Joint Implementation Bonn 9 th March 2006 By: Fatou Ndeye Gaye and Evgeny Sokolov.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Francisco Arango UNFCCC secretariat JI section Joint Implementation State of Play UNFCCC Technical Workshop on.
African Centre for Statistics United Nations Economic Commission for Africa Session 2 How to meeting countries needs: What has been done and way forward.
JISC – work accomplished and challenges ahead
1st Sustainable Development Mechanism Bonn, 24 March 2012 Future of JI – Business Perspectives Hanna-Mari Ahonen IETA.
Introduction to VCS Version 4 Consultation
Presentation title Maritim Hotel Bonn Germany, March 2012
JISC from COP/MOP 1 to COP/MOP 2 UNFCCC Technical Workshop on JI
Carbon Finance at EBRD: IGOs’ perspectives
Development of determination and verification manual (DVM)
Joint implementation programmes of activities (JI PoA)
Presentation transcript:

Maritim Hotel Bonn Germany, March 2012 Wrap-up session III and IV Module 4.3 – Governance of JI Mr. Wolfgang Seidel 1 st Sustainable Development Mechanisms Joint Coordination Workshop

Break-out session III and IV, Module 4.3, JI Governance Main issues discussed CMP 7 requested the JISC to draft revised set of key attributes and transitional measures dealing with possible changes to JI guidelines. CMP will consider this draft at CMP8 with a view to develop revised JI guidelines for adoption at CMP9 Current JISC roles and JISC recommendations on adjusting the role, membership and composition of the proposed new JI regulatory body External challenges for JI (Demand, Potential Host Countries, Scope, Competition with other mechanisms) Internal challenges for JI (project cycle, governance, moving beyond offsetting) Challenges for DFPs (Baseline choice, Additionality) Alignment of Accreditation Procedures between the mechanisms Synergies and interaction between the mechanisms have to be reflected in the proposed new governance structure for JI

Action points / Recommendations Governance structure needs to follow the requirements of a revised JI – need to define characteristics of the mechanism first International guidance and oversight of a new governing body under the autority of the CMP – functions need to be changed compared to current status It is important to clarify as soon as possible how and when post-2012 emission reductions will be accounted for the CP2 and be credited Break-out session III and IV, Module 4.3, JI Governance