25 October 2005A.Ciocio - SCTSG1 Type IV Cables and PP3 Status & Plan.

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
27 September 2005A.Ciocio - ID Week1 SCT Service Installation Overview Status of Type IV Cable Installation Type II/III Cable Installation Plan for the.
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
SCT Power Supply Installation Schedule Jan Bohm, Prague AS, 4 th November 2005 The SCT Power Supply System will be installed in 22 LV&HV racks situated.
Walls crates cables gas chambers electronics CERN adb.
31 January 2006A.Ciocio - SCTSG1 Type IV cables and PP3 Installation Type IV installation Connector in situ work Status of PP3 Testing.
29 November 2005A.Ciocio - SCTSG1 Type IV Cables and PP3 Status of Type IV installation Connector in situ work Status of PP3 Testing.
Upgrade developments in Clermont-Ferrand Romeo Bonnefoy and François Vazeille Tilecal upgrade meeting (CERN, 13 June 2014) ● Handling tools ● Deported.
Preparation of SPD Cabling Calo comissioning meeting – 19th July 2006 – CERN I.Status of cables II.Cable reels III.Labelling IV.Cabling inside a VFE box.
14 February 2006A.Ciocio - ID Week1 SCT Services Procurement & Installation Type IV PP3 Type II-III and PP1 Fibres Heaters DCS Testing MTF Workpackage.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
ID week - 26 September 2006 A. Ciocio1 SCT Services Installation SCT Cables Web page
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Electrical and Optical Cables Installation at P5 What When How H. Breuker
Pippa Wells25 October Procurement and manpower for service installation Services readiness dates Planning for type ii/iii Fibre installation dates.
Activities Status and Plan for the week D. Giugni / INFN Milano D. Giugni Monday Meeting
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
8 June 2006A.Ciocio - SCTSG1 SCT Services Installation Type IV PP3 Type II-III and PP1 Testing & Installation Plan Workpackage
CMX Production Status Presented to the L1Calo Meeting on Monday 22-Sept-2014 by Dan Edmunds for the CMX Group.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
14 December 2005A.Ciocio - SCTSG1 Services and Patchpanels Installation Type IV installation Connector in situ work Status of PP3 Type II/III Testing.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Status of Glasgow module production Richard Bates The University of Glasgow K.Smith, R. Bates, A. Cheplakov, V. O’Shea W. Bell, J. Melone, F. Doherty,
Status of NA62 straw electronics Webs Covers Services Readout.
EMCal Status ALICE Technical Board November 20, 2008 News Schedule.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
7 March 2006A.Ciocio - SCTSG1 SCT Services and Patch Panels Type IV PP3 Type II-III and PP1 Fibres Heaters DCS Testing Workpackage
9 May 2006A.Ciocio - SCTSG1 SCT Services Installation Type IV PP3 Type II-III and PP1 Fibre Cables DCS Testing & Installation Plan Workpackage
13 September 2005A.Ciocio - SCTSG1 Type IV Cables and PP3 Delivery Installation Connector work Testing Summary.
SCTSG - 17 October 2006 A. Ciocio1 SCT Services Installation Update Recent Full Report: September ID week SCT Cables Web page:
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting September 21, 2004.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
25 October 2005A. Ciocio - SCTSG1 Type II/III Cables and PP1 Status & Plan.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
V. Bobillier1 Cable installation status.
31 January 2006A.Ciocio - SCTSG1 Type ii-iii and PP1 Production Timescale for installation Plan PP1and Testing.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
PIXEL CAEN Installation Status
Cabling for LHCb Upgrade
HF Test station at P5 A.Mestvirishvili.
Mini-drawers, FE-ASIC , Integrator
Nearly the end of a long story...
Pierluigi Paolucci - I.N.F.N. Naples
TileCal ROD Commissioning Counting Room Installation
Presentation transcript:

25 October 2005A.Ciocio - SCTSG1 Type IV Cables and PP3 Status & Plan

25 October 2005A.Ciocio - SCTSG2 PP3 Racks in UX15 (US15 side) Y.52-4.X7, Y.53-4.X7 Y.52-1.X6, Y.46-1.X6 Y.43-1.X6, Y.34-1.X6 Y.51-2.X2, Y.52-2.X2 Y.53-2.X2

25 October 2005A.Ciocio - SCTSG3 PP3 Racks in UX15 (USA15 side) Y X8 Y X8 Y X8 Y X5, Y X5 Y X2, Y X2 Y X1

25 October 2005A.Ciocio - SCTSG4 PP3 Racks Dummy PP3 Racks on Level 6 US side

25 October 2005A.Ciocio - SCTSG5 Status of Type IV cables Type IV cables are delivered in double lengths with connectors installed at the PP3 end and pulled between the UX15 cavern and the US(A) halls US side completed USA side installation started this week Delivery of harness has been very slow –Vacation and QA problems in the summer –Connectors quality –Delay of components delivery from CERN to company –Bobbins damage –Production stopped for 3 weeks Delivery restored this week with expected rate of 150 double harness/week Expected complete delivery of harnesses by the end of the year Installation of type IV might be interrupted by installation of type ii/iii UX side US(A ) side PP3Power Supply

25 October 2005A.Ciocio - SCTSG6 Mapping Mapping/layout subject to frequent adjustements to accommodate changes in routing or discrepancies with original expected routing Endcap mapping issue –In the present mapping, six PS crates from each cavern are shared between the two endcaps –The endcap interlock scheme requires four matrix cards per cavern –The full set of interlock signals from one quadrant will be connected to one matrix card –the present mapping may be accommodated by the interlock hardware by routing signals between matrix cards –PS channel skipping to better match the interlock modularity of 4 to the modularity of the cooling system –Revision of the DCS system to accommodate modules from multiple partitions within one PS crate

25 October 2005A.Ciocio - SCTSG7 US(A) racks

25 October 2005A.Ciocio - SCTSG8 In US15 Cut cables and connectors on the power supply side installed in situ First rack (200 cables/connectors) completed early in July –Work performed by SEDELEC (subcontract of KontaktSysteme that provides the double length cables - Many mistakes –~15 connectors have been repaired (mechanical) –Several label mismatch still to be fixed –~10 need serious repair (electrical) –They raised the cost significantly for future connector work New Plan –TC help with connector attachment –Nicolas Massol joined TC in September. One of his tasks is to organize connector activity –Work with Petr Kubik (Prague) to discuss technical aspects and qualify samples made by other companies being contacted –Meanwhile all cables are being cut to some extra length and ~ all tooling has been purchased to make prototypes –Qualification of one company (CPE/Italy) in progress –Work might start soon Plan for testing with cables plugged in PS crate Prague is going to design feedtrough board

25 October 2005A.Ciocio - SCTSG9 Rack Scheme for PP3

25 October 2005A.Ciocio - SCTSG10 Status of PP3 Cables are plugged in a few dummy Patch Panels during installation to be placed in the right (final) position and are tightened to horizontal bars Cables will have to be all removed from the current position and plugged in by groups/rows when the installation of the real PP3 will occur Big shipment of rack railing, PP3 housing crates, horizontal bars has been received (827 Kg) Ashley French currently at CERN has been dressing all the USA racks First 100 PP3 units are under preparation 60 units will arrive at CERN next week for burn-in and 40 will be burnt in at Melbourne The hold up so far has been the HV inserts Following a successful test, the company will be given the go-ahead for the remaining 4000 units. Expected production time is 2-3 weeks We’ll work on a scheme for shipment that agrees with the schedule Shaun Roe and Igor Ilyashenko with the help from Pamela Ferrari and Ewa Stanecka will set up testing and burn-in – Duration of tests to be decided Ashley F. and Scott Moncrieff should arrive at CERN on 14 November and will stay for four weeks Estimated installation of 200 units per day but more people will be needed to help on US side racks

25 October 2005A.Ciocio - SCTSG11 Testing Tester designed and provided by Ljubljana (Gregor, Erik) –2 Test box + 2 Laptops + test cables –Need upgrade of test cables which are decaying after so much use –Lots of problems lately Test steps: –Cables are tested at reception (acceptance test) –After being pulled from UX15 to US(A)15 (uncut-double length) –After they are cut in the US side at connectors are installed Shift planner (developed by D. Robinson) works very well for planning the activities and have people to sign up –(and contact me because of unexpected changing in rate delivery/testing problems) What is needed to be able to take a shift: 1)take the safety training course (at the pompiers station) 2)make the access request on EDH 3)get your safety boots & helmet (or borrow them)

25 October 2005A.Ciocio - SCTSG12 Current Shift Counts per Institute InstituteTotalCompletedPending Prague40373 Geneva36351 Bergen19190 Valencia11110 UC Santa Cruz1091 Wisconsin990 MPI880 CERN770 Ioffe550 Okayama440 Ljubljana440 LBL330 Kyoto330 UCL220 KEK220 Cracow220 Lancaster110

25 October 2005A.Ciocio - SCTSG13 Summary Installation on US side completed –Cables delivered and tested –Cables routed and tested –Cables cut to extra length Installation on USA side started –Delivery of double length harnesses restored –If rate of 150/w expected installation completion at the end of year unless interrupted by type ii/iii installation Connector work –Qualification of company in progress PP3 –First 100 unit will be at CERN soon (60 next week) –Remaining 4000 hopefully early in December –Installation of PP3 units 100 in November – then gradually in December Testing –Good presence of SCT collaborators – need to continue