Risto Päivinen NEFIS 15 November 2004. Project Timetable.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

§ 1.10 Properties of the Real Number System. Angel, Elementary Algebra, 7ed 2 Commutative Property Commutative Property of Addition If a and b represent.
Slide 1 Insert your own content. Slide 2 Insert your own content.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 1 Embedded Computing.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 3.1 Chapter 3.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Quest ion 1? A.) answer B.) answer C.) correct answerD.) answer L C.) correct answer F.
Combining Like Terms. Only combine terms that are exactly the same!! Whats the same mean? –If numbers have a variable, then you can combine only ones.
Counting On Wendy Pallant 2002.
NEFIS (WP5) Evaluation Meeting, November 2004 Evaluation Data Rights Aljoscha Requardt, University of Hamburg Response Rate: 91% - 10 of 11 partners.
IUFRO International Union of Forest Research Organizations Eero Mikkola Results of WP2 – Report Introduction to the work of WP2: Metadata, Keywords and.
NEFIS Meeting, Hamburg, November 15-16, 2004 WP6 Links with Commission Services Dissemination of results Follow-up activities Status and plan.
Work plan – Evaluation - General Aspects - NEFIS – mid-term, WP2 and WP3 Meeting, Vienna March 2004 University of Hamburg, Aljoscha Requardt WP 5:
Hamburg NEFIS WP5 GT & Tim R 1 NEFIS Evaluation Meeting WP3 Report Tim Richards (EFI) Moh Ibrahim (Greenwich University) University of Hamburg.
Andreas Schuck WP4 Data preparation and provision NEFIS Project Meeting Joint Research Centre, Ispra, Italy.
2/22/2014 E U R O P E A N F O R E S T I N S T I T U T E The general objectives of NEFIS are maximising the value of existing data and databases by: coordinating.
Network for a European Forest Information Service -NEFIS NEFIS Knowledge Base Current Status Nguyen Thanh Binh IUFRO Vienna.
Network for a European Forest Information Service WP 4 Data preparation and data provision.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
0 - 0.
ALGEBRAIC EXPRESSIONS
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Teacher Name Class / Subject Date A:B: Write an answer here #1 Write your question Here C:D: Write an answer here.
Addition Facts
Understanding Standards 1 NQ Administration Annotation of Marking ITFM – Int 2.
CS4026 Formal Models of Computation Running Haskell Programs – power.
Empty Box Problems Subtraction = 3 If you start on 6 and jump back 3 spaces you land on
Problem # Problem #
Richmond House, Liverpool (1) 26 th January 2004.
© Richard A. Medeiros 2004 x y Function Machine Function Machine next.
5Min 5-4 1) Evaluate 3 × (4 + 7) – 5 × 4. 2) Evaluate × 5 3) Evaluate 13 squared. 4) Evaluate 9 cubed. Warm Up.
O X Click on Number next to person for a question.
© S Haughton more than 3?
8/16/2014 E U R O P E A N F O R E S T I N S T I T U T E  To ensure that the objectives of NEFIS are reached and activities completed in accordance with.
Report on WP 4 status NEFIS mid-term and work package 2/3 meeting Vienna Andreas Schuck.
Risto Päivinen, Andreas Schuck and Tim Green NEFIS - Network for a European Forest Information Service QLK5-CT JRC Ispra - 29 June 2005.
European Forest Institute 1 Network for a European Forest Information Service (NEFIS) WP 4 Data preparation and data provision Solsona, Andreas.
NEFIS Knowledge Base Nguyen Thanh Binh IUFRO Vienna.
IUFRO International Union of Forest Research Organizations Eero Mikkola Description of WP2 – NEFIS Metadata and Controlled Vocabularies Standards - work.
5.9 + = 10 a)3.6 b)4.1 c)5.3 Question 1: Good Answer!! Well Done!! = 10 Question 1:
1 Directed Depth First Search Adjacency Lists A: F G B: A H C: A D D: C F E: C D G F: E: G: : H: B: I: H: F A B C G D E H I.
10/5/2013Multiplication Rule 11  Multiplication Rule 1: If a > b and c > 0 then a c > bc Examples If 7 > 3 and 5 > 0 then 7(5) > 3(5) If 2x + 6 > 8 then.
Linking Verb? Action Verb or. Question 1 Define the term: action verb.
Equivalent Fractions: Addition
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Limits (Algebraic) Calculus Fall, What can we do with limits?
Properties of Exponents
Chapter 5 Test Review Sections 5-1 through 5-4.
1 ENGLISH – LEVEL VI Week 10 – Lesson UNIT 9 – Import Export LISTENING.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
Click your mouse to move the card ahead! Work with a buddy using two Abacuses. First click and follow along using your abacus. After each click talk about.
11 = This is the fact family. You say: 8+3=11 and 3+8=11
1.Name the quadrant a. (-5, 1)b. (6, -4) c. (5, 8) d. (-8, -1) e. (7, 2)f. (-9, 4)
Week 1.
We will resume in: 25 Minutes.
1 Ke – Kitchen Elements Newport Ave. – Lot 13 Bethesda, MD.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
FIND THE AREA ( ROUND TO THE NEAREST TENTHS) 2.7 in 15 in in.
O X Click on Number next to person for a question.
What we know (and don’t know) about MC supplies. Steve Gesuale PSI PEPFAR MC Partners Meeting May 2009.
NEFIS Evaluation Meeting (WP5) Aljoscha Requardt, University of Hamburg NEFIS (WP5) Evaluation Meeting, November 2004  Metadata  VTK Workshop Topics.
Presentation transcript:

Risto Päivinen NEFIS 15 November 2004

Project Timetable

WP 5: Evaluation of (1) metadata standards, (2) process of data provision and (3) the advanced GFIS/EFIS system Partner: 4, 1, 5, 10 Advanced GFIS/EFIS WP 1: Management Partner 1, 2, 3, 4 Data available from multiple sources on the Internet GFISEFIS WP 3: UML description and establishment of a NEFIS and GFIS KnowledgeBase Partner: 3, 1, 4, 5, 6, 10 Refining the work plan and agreement on data input WP 2: NEFIS Metadata and Controlled Vocabularies Standards Partner 3, 1, 4,5, 6, 7, 8, 9 10, 11, 12, 13 WP: 6 Links with Commission Services, dissemination of results and follow-up activities Partner: 2, 1, 3, 4, and 10 Background WP 4: Data preparation and provision Partner 1, 4, 6, 7, 8, 9, 11, 12, 13 Provider 1 Provider 2 Provider 3 Provider n