Experience with an introduction of IPPC Directive in an AC IMPEL member country Czech Republic Czech Enviromental Inspectorate.

Slides:



Advertisements
Similar presentations
© European Communities, 2007 Purpose The European Integrated Pollution Prevention and Control Bureau (European IPPC Bureau) of the JRC/IPTS was set up.
Advertisements

EU FORMAL REGULATION – TYPES OF STANDARDS ENVIRONMENTAL QUALITY OBJECTIVES ENVIRONMENTAL QUALITY STANDARDS.
HR 09 IB EN 02 – German Proposal, Zagreb, 10 June 2011 Page 1 April 12, Strengthening the Ministry of Nature Protection of the Republic of Armenia.
Industrial Pollution Control and Risk Management: IPPC Neil Emmott Environment Directorate-General 7 April 2006.
Law approximation and implementation in Hungary Ministry for Environment Department of Integrated Pollution Control Nicosia, May 2001 Andrea Nám, desk.
BULGARIAN COMPETENT AUTHORITIES IN THE FIELD OF IPPC Kalin Iliev Ministry of Environment and Water Bulgaria.
Practical use of newly developed BAT conclusions Valts Vilnītis.
Grupowa Oczyszczalnia Ścieków Łódzkiej Aglomeracji Miejskiej Fot: U. Czapla Practical aspects of compliance with the Integrated Permit requirements based.
ECENA 4 th Exchange Programme Cluj Napoca, October, 2005 National Updates in the Transposition and Implementation of IPPC directive Ministry of Environment.
Supervision of the quality of water intended for human consumption by State Sanitary Inspection bodies Małgorzata Kedzierska Environmental Hygiene Dept.
Authorities role in the assessment of energy efficiency Marianne Lindström, Conference on Energy Efficiency in IPPC Installations, Vienna
The IPPC Directive and EPER Iksan van der Putte. Objectives of IPPC (Integrated Pollution Prevention and Control) To prevent or minimise emissions To.
European Commission - Environment Directorate-General 8 June 2004 Trends and experience so far in implementing the IPPC Directive.
The Sevilla process for supporting the implementation of the IPPC Directive Michael Parth Tallinn – Estonia 27 – 28 March 2008.
Workshop, 12/3/2004 Banska Bystrica – SLOVAC REPUBLIC “INTEGRATED LICENCE PROCEDURE (Greek case)” Katerina Iakovidou-Anastasiadou Hellenic Ministry for.
Berlin, Joint -Meeting, 28. Sept Helmut Döhler IPPC / IED Directive and Seville-Process.
Current state on Harmonisation and Implementation/Enforcement of Environmental Legislation - Industrial Pollution Control in SLOVENIA Barbara Bernard Ministry.
IPPC Directive state of play and future developements
Croatian Report on new Environmental Protection Law Josipa Blažević-Perušić, B.Sc. Arch. State Secretary Anita Pokrovac-Patekar, B.Sc. Pharm. Senior Environmental.
Implementation of IPPC and its application to sectors in different industrial scales – Experience of Czech Republic Jan Slavík, IPPC Unit - MoE of Czech.
EPER reporting process in Hungary with emphasis on the experiences Edina Gampel Counsellor National Inspectorate for Environment, Nature and Water Budapest,
The IPPC Directive and its implementation Alexandre Paquot European Commission Environment Directorate-General Phare Capacity.
Ministry of Waters and Environmental Protection, ROMANIA 1 BERCEN 1 st Exchange program – November 2002 Croatia PROBLEMS AND SOLUTIONS IN COOPERATION.
European IPPC Bureau Workshop on the implementation of BAT under new Directive 2010/75/EU – Ankara, 20 July, Implementation of best available techniques.
1 Permitting of industrial facilities in Croatia.
ROMANIA INTEGRATED POLLUTION PREVENTION AND CONTROL - IPPC MINISTRY OF ENVIRONMENT AND WATER MANAGEMENT PRAHA June 2004 Iuliana Chidu EU Counsellor.
ECENA First Plenary Meeting January, 2006 Zagreb, Republic of Croatia Forthcoming obligation related to implementation and enforcement of EU legislation.
IPPC transposition and experience with its implementation in the Czech Republic ?? …!! AjPíPíSí ??
AйПиПиСи ?? IPPC implementation - experience from new EU member countries & changes brought by Industrial Emissions Directive Monika Přibylová Kiev, 10.
4 th Exchange Programme Cluj Napoca, October, 2005 REPUBLIC OF CROATIA Updates in the Transposition and Implementation of IPPC directive Updates.
1 Workshop on the Directive 96/61/EC concerning (IPPC) Integrated pollution prevention and control INFRA Public participation & access to environmental.
Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic.
Energy Efficiency in IPPC Installations, Wienna Oct/2004 Petr Honskus (SPF Group) Chairman of EE TWG CR Vladimíra Henelová, Monika Přibylová Members.
1 st Program of Experience Exchange INSPECTION – PLANNING AND REPORTING (CURRENT SITUATION IN THE REPUBLIC OF CROATIA IN CORRELATION WITH IPPC) Brijuni,
The conception of Information System on Integrated Pollution Prevention and Control (IS IPPC) Ing. Blanka Kapustová, PhD. Slovak Environmental Agency Centre.
Republic of Serbia BENCHMARKING AND SETTING ENVIRONMENTAL COMPLIANCE AND ENFORCEMENT INDICATORS Ministry of Science and Environmental Protection Directorate.
Consultant: CMDC Joint Venture EIA, IPPC and SEVESO Links.
PERMIT ISSUANCE SYSTEM IN CROATIA ENVIRONMENTAL REVIEW Authors: Jasna Paladin-Popović Iva Milić Štrkalj Renata Sinovčević Brijuni, 27 November /21/02Croatia.
Strengths and weaknesses of the permitting system and enforcement process in RIEW – Veliko Turnovo Regional Inspectorate of Environment and Water - Veliko.
ECENA 4 th Exchange Programme Cluj Napoca, October, 2005 Update on the IPPC directive transposition and implementation in Republic of Serbia Directorate.
Recommendation of the European Parliament and of the Council of 4 April 2001 providing for Minimum Criteria for Environmental Inspections in the Member.
SEA in the Czech Republic Prague, 24 September 2008.
Iuliana CHIDU European integration counsellor Ministry of Environment and Water Management Prague - CZECH REPUBLIC April 2005 DIRECTIVE 96/61/EC.
Twinning project ENEA – ENforcing Environmental Acquis Skopje, 19 th of November, 2015.
How to start with the implementation of IPPC Directive Czech Republic Czech Environmetal Inspectorate.
Page 1 Annexes of the Directive 96/61/ES on IPPC Agency on Integrated Prevention Ms. Lucie Svobodová Integrated and Planned Enforcement of Environmental.
1 Short overview of the implementation of IPPC, LCP, Seveso II, Waste Landfill and Incineration directives Short overview of the implementation of IPPC,
CROATIA Country Report IPPC Directive: implementation, problems, constraints, open questions,… Anita Pokrovac Patekar, B. Sc. Pharm. Ministry of Environmental.
Consultant: CMDC Joint Venture Czech experience - Use of BREFs and national BAT notes, role of IPPC Agency, Czech TWG Multi-Country Workshop June 8th,
Achievements in IPPC Directive Implementation: problems and constraints Albania Ministry of Environment 3 rd BERCEN Exchange Programme for the Environmental.
The current legal situation
European Commission - Environment Directorate-General 14 February 2003 Developments in the framework of the IPPC Directive Magnus.
Workshop on Introducing integrated pollution control system – Kiev, 25 – 26 January, European IPPC Bureau Main conditions for forming the integrated.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 6 – Company Law Bilateral screening:
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment Bilateral screening:
BERCEN plenary meeting Budapest, September Agenda item 4 National key achievements in environmental enforcement and compliance, and proposals on.
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 1 The IPPC Directive Introduction to the philosophy Rob Kramers.
IPPC A general overview Nigel Barraclough Policy Adviser Industrial Pollution Control Branch Air and Environment Quality Division. Taiwanese Environmental.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment Bilateral screening:
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment and Climate Change.
Introduction to the philosophy
MONITORING Mr. Jan Prášek IPPC Agency.
Annexes of the Directive 96/61/ES on IPPC
INTEGRATED PERMITTING PROCEDURE IN THE CZECH REPUBLIC
INTEGRATED PERMITTING IPPC DIRECTIVE: BEST PRACTICE
Mr. Nepimach Czech Ecological Institute
EU Food Safety Requirements: - Hygiene of Foodstuffs -
Industrial Emissions Directive Targeted stakeholder survey
WFD CIS Working Group Meeting Brussels, 4/4/2019
Presentation transcript:

Experience with an introduction of IPPC Directive in an AC IMPEL member country Czech Republic Czech Enviromental Inspectorate

European Community Council Directive 96/61/EC on IPPC Czech Republic Act No. 76/2002 Coll. on IPPC

Act on IPPC in the CR - 1. January 2003

Installations in operation – 30. October 2007 New installations – 1. March 2003 –Integrated pollution register IPR –Agency of integrated prevention AIP changes in 10 Czech Acts

35 days What has been achieved so far? applications and simulation decisions are ready BREF translations Agency of Integrated prevention What is missing? implementing law regulations the list of authorized persons people and financial sources in regions

IPPC  application of Best Available Techniques /BAT/  integrated permitting /in contradiction to sectoral permitting/  public access to information

System for Exchange of Information EU EC – DG XI. Forum European IPPC Office Technical Working Groups CR MoE Czech IPPC Forum Czech IPPC Office Czech Working Group

Institutions of Czech exchange system: The National IPPC Forum The National IPPC Office National Working Groups

Institutions of state administration –Ministry of Environment –Ministry of Industry and Trade –Ministry of Agriculture –Ministry of Health –Regions –Czech Environmental Inspectorate –Regional Hygiene Officer

Procedure on granting an integrated permit EIA receiving of the application to check all prescribed requirements disclosure of the application to the public statement of participation of other authorities discussing the objections final decision on the application

Permitting procedure - Preparing an application of the integrated permit from a company Summary of environmental aspects Selection of important aspects and setting the final values of indicators Analysis of production processes from the point of view of raw material and energy flows Draft of possible solutions to prevent the origins of waste production and the sources pollution (BAT) Evaluation of possibilities and suggestion of integrated solution in production technologies Draft of end technologies in a case of prevention of the sources pollution wasn´t achieved Draft of the whole solution and the description of the emission monitoring

Permitting Procedure - Granting the Integrated permit The company submits the application Disclosure of information about submission of the application Evaluation of the suggested measures Preparation of decision and discussion with the operator of the installation about permission requirements and about the best solution Disclose the decision draft Comments from the public Granting the integrated permit, which includes justification of public comments

Operating the installation monitoring and reporting controls and disclosure of monitoring results renewal of the integrated permit

Basic obligations of the operator of an installation to operate the installation in accordance with the integrated permit to notify the Authority of a planned change in the installation to cooperate with the relevant administrative authorities in controlling compliance with the conditions of the integrated permit to notify the Authority without delay of all unusual situations, accidents at the installation and accidental releases of pollutants from the installation into the environment keep records of information on compliance with the binding conditions for operation of the integrated permit The operator of an installation must not operate the installation without an integrated permit

The Czech Environmental Inspectorate inspect compliance with obligations laid down by this Act or the integrated permit limit or stop the operation of an installation or its part, if its further operation would cause or could cause serious environmental damage or considerable material damage impose fines submit to the Region the results of a completed control, if this control reveals breach of obligations for which the Region imposes fines evaluate applications of the best available techniques and submit information on trends therein to the relevant administrative authorities not participate on the procedure on granting an Integrated Permit not perceive as an affected body of state administration.

Ministry of the Environment  execute supreme state supervision and shall be the central body of state administration  make decisions on applications for integrated permit for installations whose operations could significantly detrimentally affect the environment of an affected state  within its competence, evaluate the application of the best available techniques  submit the results of the evaluation of the best available techniques application to the administrative authorities and the relevant bodies of the European Communities  establish and maintain the integrated pollution register  provide methodical support in the area specified by this Act  fulfil tasks following from the relation to the European Communities in the area specified by this Act

Ministry of Industry and Trade  shall, within its competence, evaluate application of the best available techniques 1. Energy industries 2.Production and processing of metals 3.Processing of minerals 4.Chemical industry 6.1.Industrial plants for production 6.2.Plants for the pre-treatment or dyeing of fibres or textiles 6.3.Plants for tanning of hides and skins 6.7.Installations for the surface treatment of substances, objects or products using organic solvents 6.8.Installations for the carbon production or electrographite by means of incineration or graphitization  shall ensure the system for exchange of information on the best available techniques

Ministry of Agriculture  shall, within its competence, evaluate application of the best available techniques  6.4 a) Slaughterhouses with a car case production capacity greater than 50 tonnes per day b) Treatment and processing installations intended for the production of food or feed products c) Treatment and processing installations for milk with received quantity of milk exceeding 200 tonnes per day 6.5.Installations for the disposal or recycling of animal car cases and animal waste with a treatment capacity exceeding 10 tonnes per day 6.6.Installations for intensive rearing of poultry or pigs

Regions make decisions on application for an integrated permit with the exception of installations whose operation could significantly detrimentally affect environment of an affected state - these decisions makes the MoE carry out control of an integrated permit or operation of an installation impose fines request the operator of an installation to submit an application for granting an integrated permit evaluate application of the best available techniques and submit information on their development to the relevant administrative authorities

Regional Hygiene Officer in procedures on granting an integrated permit, the officer shall lay down the binding conditions for operation of a source of noise or vibrations if the hygiene limits cannot be met from the standpoint of protection of the public health, the officer shall check the integrated permit or operation of the installation the hygiene officer shall limit or terminate the operation of an installation or its part, if further its operation would or could cause serious damage to human health the officer shall impose fines

Participants in the Procedure the operator of the installation the municipality, in whose territory the installation is or is to be located the region, in whose territory the installation is or to be located - civic associations -public benefit societies -federations of employers or chamber of commerce -municipalities

Participation of the Authorized person statement on application by other Authorised person by the Agency of Integrated Prevention within 5 days within 75 days disclosure for a period of 30 days

Oral Discussion of the Application Decision on the Application - within 45 days - prolongation: 45 days

Application for granting an Integrated Permit identification of operator of an installation description of the installation and related activities description of raw materials and preparations, related materials and energy emission sources from the installation characterization of the place where the installation should be located description of emissions amount from the installation in water, air, soil description of technologies which prevent the emission formation and reduce them description of measures that prevent waste production or serve to the use of waste produced by installation localization and types of emission monitoring is needed characterization of measuring instruments + supplements

Pilot project system  preparation of Regions for the Integrated Permit granting according to the IPPC directive requirements  to prepare workshops for the clerks from the Regions who are responsible for issuing permits  to create a flexible system of BREF documents and other BAT sources  to support MoE in establishing and of to educate personal about related issues  to support the Czech working group in monitoring  to prepare documents

Institutional strengthening of the Czech Environmental Inspectorate – Implementation of the IPPC Directive

Institucional strengthening of the Czech Environmental Inspectorate – Implementation of the IPPC Directive Introduction of permitting according to the EU-IPPC Directive in selected pilot metal foundries in the Czech republic Institutional strengthening of the Czech Environmental Inspectorate /CEI/ Improvement of smog monitoring and control in the surroundings of 2 metallurgical companies in Ostrava

Institucional strengthening of the Czech Environmental Inspectorate – Implementation of the IPPC Directive Outputs  an agreement between the Czech government and the Czech foundry sector on a future emissions value framework  a Company Environmental Plan /CEP/ for the selected pilot foundries  demonstration permits  a database and documentation centre on clean technology and BAT in the foundry sector  2 seminars on IPPC, BAT, self/regulation and integration  a work plan for the CEI regarding implementation of IPPC  a seminar on clean production  3 study visits of stakeholders to meet colleague organisations in the Netherlands  installation of additional hardware and software to improve smog monitoring

Institucional strengthening of the Czech Environmental Inspectorate – Implementation of the IPPC Directive -Czech Environmental Inspectorate -Ministry of Environment -Ministry of Industry and Trade -Ministry of Regional Development -selected pilot foundries -Czech Foundry Union -steel mills involved -NGO`s – STUZ -project manager - DHV in the Netherlands -deputy project manager - DHV CR -air quality management expert - DHV in the Netherlands -environmental expert - DHV CR -Environmental Department of Dutch environmental permitting body -Dutch steel mill -The Netherlands Environmental Inspectorate

Institucional strengthening of the Czech Environmental Inspectorate – Implementation of the IPPC Directive smog monitoring equipment track permitting track -application format -preparation of application -IPPC permit study visit to the Netherlands –Dutch Foundry Union –permitting authorities –Environmental inspectorate –companies

The pilot IPPC project in paper industry enterprise (paper mill) Simulation Game 2000 – 2001 The Frantschach Pulp & Paper, a.s. Sweden 1969

The pilot IPPC project in paper industry enterprise (paper mill) Environmental Management System EN ISO to increase using of renewable energy sources -to reduce the water consumption -to reduce the waste water burden -to limit the origins of underground water contamination -to meet the emission limits for air and water

The pilot IPPC project in paper industry enterprise (paper mill) -VIII/2000 Elaborating the integrated permit application form -IX – X/2000Elaborating and handing in the Frantschach's integrated permit application -8. – Discussing the application Written comments of the authorities on the completed application Elaborating the standpoints of the authorities, NGOs and the public on the completed application Public hearing

The pilot IPPC project in paper industry enterprise (paper mill) Ministry of Environment Czech Environmental Inspectorate District Hygiene Station District Office Municipal Office Centre For a Cleaner Production Society for Sustainable Living Swedish Agency For Environment Swedish Environmental Court

The pilot IPPC project in paper industry enterprise (paper mill) –BAT - 90% –public hearing on the application –process of integrated permit granting administrative management  applicants  permit granting authorities

The Chicken Farming –6.6. Installation for the intensive rearing of poultry or pigs with more than places for poultry –Capacity: places The model discussion of the application Integrated permit 31. March 2003

The Chicken Farming -Czech Inspection of Environment -Regional Hygienic Officer -NGOs - Children of the Earth -vets -relevant administrative authorities –comments problem - Integrated Permit –more operators –one operator

internet IPPC

THANK YOU for your attention

IPPC Installations in the Czech Republic