ITU-T SG 5 Technical Session Lightning protection 12 December 2005, ITU Headquarters, Geneva ITU-T Technical Session Lightning Protection Highlights &

Slides:



Advertisements
Similar presentations
International Telecommunication Union Seminar on Impact of Electromagnetic Field Emissions Kampala, Uganda, 3-5 September 2003 ITU-T Study Group 5 Publications.
Advertisements

Evolution of Optical Fibre Types and Cables
ITU-T Technical Session on EMF
Nairobi, Kenya, 26 – 27July 2010 Role of ITU-T & ITU-R Ahmed ZEDDAM Ahmed ZEDDAM, ITU-T SG5 Chair France Telecom Orange ITU-T Workshop on Delivering Good.
International Telecommunication Union ITU-T SG 5 Technical Session Lightning protection 12 December 2005, ITU Headquarters, Geneva Risk assessment for.
International Telecommunication Union Technical Session on Home Networks Geneva, 29/04/2011 ITU-T Study Group 5 Protection against Lightning Phil Day Australia.
International Telecommunication Union Geneva, July 2009 Electrical Safety and Electromagnetic Compatibility Ahmed ZEDDAM, ITU-T SG 5 Chairman (France.
Cotonou, Benin, 19 July 2012 Overview of ITU-T/SG 5 activities Ahmed ZEDDAM Ahmed ZEDDAM, ITU-T SG5 Chair France Telecom Orange ITU Workshop on Tackling.
International Telecommunication Union ITU-T Study Group 5 The need for special requirements Tetsuya Tominaga Technical Session on Home Networks Geneva,
International Telecommunication Union ITU-T Workshop Lightning Protection Technical Session December 2005, Geneva, Switzerland Risk assessment for.
Summary of Results Study Period ITU-T Study Group 5 Protection against electromagnetic environment effects in telecommunications Roberto Pomponi.
ITU-T SG5 activities on EMF
Standards for the protection of radio installations
Quito, Ecuador, 14 August 2013 Assessing EMF Levels Guidance and Recommendations Mike Wood EME Management Education & Compliance Telstra ITU Workshop on.
Relevant ITU-T Recommendations for the Protection of Base Stations
Privacy By Design Sample Use Case
Committed to connecting the world Overview of ITU-T Study Group 5 “Environment and Climate Change” Ahmed ZEDDAM France Telecom Orange Chairman, ITU-T Study.
Doc.: 18-11/58r0 Submission July 2011 John Notor, Notor ResearchSlide 1 Summary of ITU-R Documents Notice: This document has been prepared to assist IEEE.
Committed to connecting the world Overview of ITU-T Study Group 5 “Environment and Climate Change” Cristina Bueti Adviser, ITU-T Study Group 5.
Cloud computing security related works in ITU-T SG17
Committed to connecting the world Ninth ITU Symposium on ICTs, the Environment and Climate Change Kochi, India, 15 December 2014 Damage prevention and.
© 2012 DEHN + SÖHNE / protected by ISO Site visits to Botas Lightning and Surge Protection 1.
International Telecommunication Union ITU-T Study Group 05 Damage to equipment in Japan Tetsuya Tominaga Technical Session on Home Networks Geneva, 29/04/2011.
Mr. Harethe El Ouadhane IEC member for IEC MT14. |Infrastructure Business | Germany | Test Engineer & Expert (Internal Arc, Making, Breaking.
Committed to connecting the world Ninth ITU Symposium on ICTs, the Environment and Climate Change Kochi, India, 15 December 2014 Damage prevention and.
Geneva, Switzerland, September 2014 Critical telecommunication infrastructure protection in Brazil Antonio Guimaraes / Paulo Moura National Telecommunication.
Geneva, Switzerland, 4 December 2014 ISO work on Mobile Financial Services Patrice Hertzog, Chairman, ISO T68/SC7 ITU Workshop.
Overvoltage Protection, A. Zeddam, Dakar, Senegal, 25 March 2015 ITU Regional Standardization Forum For Africa Dakar, Senegal, March 2015 Overview.
Lima, Peru, 10 December 2013 Overview of ITU-T Activities on Human Exposure to Electromagnetic Fields (EMFs) Mike Wood, General Manager, Telstra EME Management.
Overview of ITU-T Study Group 5 “Environment and Climate Change” Cristina Bueti, Adviser, ITU.
GRB, 59th session January, 2014 Informal document GRB (59 th GRB, January 2014, agenda item 6) Method of Deceleration Measuring and Data.
EPR ‘Fundamentals of Calculation of Earth Potential Rise in the Underground Power Distribution Cable Network’ by Ashok K. Parsotam (1997) available free.
WG3 Leader: Michelle Bush International Working Forum for Regulatory Supervision of Legacy Sites (RSLS) – Technical Meeting October 2013.
International Telecommunication Union ITU-T SG 5 Technical Session “Lightning protection” 12 December 2005, ITU Headquarters, Geneva Risk regarding safety.
Integrated Grounding, Equipotential Bonding and Lightning Protection in Smart Grids and Smart Buildings – A Multi-Faced Approach Ladies and gentlemen,
Summary of Results Study Period ITU-T Study Group 5 Environment and Climate Change Mr Ahmed Zeddam.
2nd Workshop on Wideband Speech Quality - June ETSI TC STQ STF 294 Improving the quality of eEurope wideband speech applications by developing a.
44th GRSP Session Status report of Informal Group on FI Pierre CASTAING Chairman Informal Document No. GRSP (44th session, December 2008, agenda.
IAEA International Atomic Energy Agency Advanced Workshop School for Drafting Regulations on Radiation Safety RER/9/096.
EVPC1 Informal adhoc EVPC Working Group Geneva, may 18 th, 2010 Proposal from FRANCE based on EVPC informal group work Informal document No. GRSP
International Telecommunication Union ITU-T Study Group 05 The model testing/simulations Yasuhiro Honma Technical Session on Home Networks Geneva, 29/04/2011.
Hoeffelman_BE_ALPHA 2_Block 1 Barcelona May EMI-EMF update Recent achievement and work going on in relevant WG’s Jean Hoeffelman ELIA- Belgium.
ITU Workshop on “Voice and Video over LTE” Geneva, Switzerland, 1 December 2015 ACTIVITIES OF THE ITU-T SG11 TOWARDS IMS AND VoLTE/ViLTE INTEROPERABILITY.
Advanced Science and Technology Letters Vol.47 (Architecture and Civil Engineering 2014), pp Electromagnetic.
International Telecommunication Union Committed to connecting the world Overview of ITU-T/SG5 “Environment and climate change” Ahmed Zeddam Chairman of.
Eleventh ITU Symposium on ICTs, the Environment and Climate Change Kuala Lumpur, Malaysia, 21 April 2016 Damage prevention and safety Requirements for.
ITU Symposium on ICTs, the Environment and Climate Change Kuala Lumpur, Malaysia 21 April 2016 Session2: Damage prevention and safety Resistibility of.
Committed to connecting the world Overview of ITU-T SG5 Work on Damage protection and safety Guy-Michel KOUAKOU Chairman of Study Group 5 Regional Group.
Jeju, 13 – 16 May 2013Standards for Shared ICT TTA activities since GSC-16 Keun Hyeob Lee, President of TTA Document No: GSC17-PLEN-39 Source: TTA Contact:
DEVELOPMENT AND MAINTENANCE OF THE TECHNICAL AND SCIENTIFIC KNOWLEDGE BASE NECESSARY FOR TSO.
ICT & Environment Seminar Standard & Guidelines For Safe Use.
USAID’s Data Quality Standards & Conducting a DQA # ? % ?
IEEE NPEC SC2 Equipment Qualification Electromagnetic Compatibility Compliance Type Test-Design Considerations- Installation and Mitigation Standard/Guidance.
ITU-T Study Group 5: Environment and Climate Change
Ch 4: Transmission Line Calculations
Radio Base Stations Sited on Power Line Towers
Electric Vehicles Safety Global Technical Regulation
THE ROLE OF TSOs IN THE NATIONAL SAFETY ORGANIZATION
Investment Recommendations
Technical Session on EMF Introduction
ITU-T Study Group 5 “Environment and Climate Change”
CENELEC TC215 WG3 (EN Series)
ITU Workshop on “With Information and Communication Technologies (ICTs) everywhere - how safe is EMF in Latin America ?” (Lima, Peru, 10 December 2013)
Data Line Gas Capsule Protectors
Recent IPTV standardization and business model in Japan
EMF Update From ETSI TC Safety DOCUMENT #: GSC13-GRSC6-06 FOR:
ITU-T Study Group 5 Protection against electromagnetic environment effects in telecommunications Roberto Pomponi.
Ahmed Kulab Moh. Abed Foaad Al-Habeel
PSS verification and validation
SIG RFC 2019 Relevant Summary
Presentation transcript:

ITU-T SG 5 Technical Session Lightning protection 12 December 2005, ITU Headquarters, Geneva ITU-T Technical Session Lightning Protection Highlights & Conclusions Ahmed Zeddam France Telecom

ITU-T SG 5 Technical Session Lightning protection 12 December 2005, ITU Headquarters, Geneva ITU-T Technical Session Lightning Protection Agenda Risk assessment for structure R. Pomponi, Telecom Italia Risk assessment for services A. Zeddam, France Telecom Risk regarding safety P. Day, Telstra Experimental result C. Fonseca Barbosa, CPqD

ITU-T SG 5 Technical Session Lightning protection 12 December 2005, ITU Headquarters, Geneva ITU-T Highlights from Presentation 1 Risk assessment for structures IEC standard gives an exhaustive risk assessment for structures, its contents and connected services This standard should be used for protection need evaluation of the exchange or customers buildings and remote site Critical points: Risk evaluation for loss of service Protection factor P M due to flashes near the structure Necessary clarification and/or improvement: Protection factor values P Z due flashes near the service are missed for 1 kV equipment resistibility P SPD values for SPDs installed on shielded cables Induction loop between two equipment inside the structure is missed

ITU-T SG 5 Technical Session Lightning protection 12 December 2005, ITU Headquarters, Geneva ITU-T Highlights from Presentation 1 Risk assessment for structures IEC standard gives a risk assessment for services following the same approach for structures This standard should be used for protection need evaluation along the service and structures where the service is entering (customers buildings, centres and remote site….) Critical points: Some parameters needed for the risk assessment are till now contained in IEC For the time being, application only to the Telecom line protection (IEC ) Necessary clarification and/or improvement: Shielding factor for internal & external wiring Protection factor values P' Z due flashes near the service are missed for 1 kV equipment resistibility P SPD values for SPDs installed on shielded cables Global approach : service + structure

ITU-T SG 5 Technical Session Lightning protection 12 December 2005, ITU Headquarters, Geneva ITU-T Highlights from Presentation 3 Risk regarding safety Draft IEC is a good basis for the preparation of K.risk and determining the risk associated with a telecommunications service Further work needs to be performed to accurately calculate the risk associated with the introduction of the remote telecommunications earth The factor L c used to determine the collection area needs rationale and validation. It is critical to an accurate calculation The linkage between P X and L X needs to be established and appropriate loss values determined for domestic telecommunications equipment

ITU-T SG 5 Technical Session Lightning protection 12 December 2005, ITU Headquarters, Geneva ITU-T Highlights from Presentation 4 Experimental results Shielding factors and protective effect of SPD applied to telecommunication lines can be assessed from simply equations derived from travelling wave theory. The wave form of current induced into a short circuited loop by lightning is identical to the inducing current. The time derivative of the surge current that flows through a service of an installation struck by lightning is only a few percent of the lightning currents di/dt. The experimental site with rocket triggered lightning of Cachoeira Paulista - Brazil is a relevant source of information in order to revise the existing standards on lightning protection and to develop new ones.

ITU-T SG 5 Technical Session Lightning protection 12 December 2005, ITU Headquarters, Geneva ITU-T Conclusion IEC /TC 81 has recently produced new series of standards on Lightning Protection regarding the structures and services These standards can be used by ITU-T SG 5 for the amendment or development of Recommendations Some clarification and/or improvement are sill necessary, particularly for IEC standard SG5 has relevant source of information based on experimental results in order to revise the existing standards on lightning protection SG5 will continue its liaison with IEC TC 81 in order to improve the knowledge on lightning protection and develop new standards