RADIOELECTRIC SITES CONTROL FOR COMPLIANCE OF GSM OBILE CELLULAR TELEPHONY NETWORKS IN COTE DIVOIRE Workshop of ITU-T Study Group 5 Regional Group for.

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

International Telecommunication Union EMF ASSESSMENT BY MESEAREMENTS AND CALCULATION (IVORIAN CASE) Guy-Michel KOUAKOU, Vice-chair of study group 5 (ITU-T)
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. *See PowerPoint Lecture Outline for a complete, ready-made.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 116.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Bonding and Grounding What? Why? How?
European Standards for (RF)ID-Systems Helmut Wolf Phone: +49 (0) 6131 – ETSI Workshop on RFID and The Internet.
Amateur Radio Technician Class Element 2 Course Presentation ELEMENT 2 SUBELEMENTS T1 - FCC Rules, station license responsibilities T2 - Control operator.
Permit to Fly: the new rules
European Union Cohesion Policy
International Telecommunication Union Seminar on Impact of Electromagnetic Field Emissions Kampala, Uganda, 3-5 September 2003 ITU-T Study Group 5 Publications.
Nairobi, Kenya, 26 – 27July 2010 Role of ITU-T & ITU-R Ahmed ZEDDAM Ahmed ZEDDAM, ITU-T SG5 Chair France Telecom Orange ITU-T Workshop on Delivering Good.
International Telecommunication Union Accra, Ghana, June 2009 Conformance and Interoperability Testing: (WTSA-08) Resolution 76 Joshua Peprah Director,
Nairobi, Kenya, 26 – 27July 2010 EMF MEASURING IN KENYA Derick simiyu khamali Compliance and Enforcement Officer Communications Commission of Kenya ITU-T.
International Telecommunication Union Technical Session on Home Networks Geneva, 29/04/2011 ITU-T Study Group 5 Protection against Lightning Phil Day Australia.
International Telecommunication Union Geneva, July 2009 Electrical Safety and Electromagnetic Compatibility Ahmed ZEDDAM, ITU-T SG 5 Chairman (France.
Cotonou, Benin, 19 July 2012 Overview of ITU-T/SG 5 activities Ahmed ZEDDAM Ahmed ZEDDAM, ITU-T SG5 Chair France Telecom Orange ITU Workshop on Tackling.
International Telecommunication Union ITU-T Study Group 5 The need for special requirements Tetsuya Tominaga Technical Session on Home Networks Geneva,
RRC 04/05 ITU Information meeting September Computer methods for planning Ken Hunt Rapporteur for Chapter 10.
Summary of Results Study Period ITU-T Study Group 5 Protection against electromagnetic environment effects in telecommunications Roberto Pomponi.
ITU-T SG5 activities on EMF
Overview of SG5 and SG5RG for Africa activities
Standards for the protection of radio installations
Quito, Ecuador, 14 August 2013 Assessing EMF Levels Guidance and Recommendations Mike Wood EME Management Education & Compliance Telstra ITU Workshop on.
Relevant ITU-T Recommendations for the Protection of Base Stations
Paolo Gemma, Senior Expert, Huawei
International Telecommunication Union HIPSSA Project Support for Harmonization of the ICT Policies in Sub-Sahara Africa An overview of the main challenges.
Overview of the interoperability Regulation
Air Pollution Control « Air Pollution Control Ordinance » ( Chapter 311 ) The Air Pollution Control Ordinance(APCO) is the main legislative framework.
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
INSPECTION OF RISK AND ANALYSIS OF INSPECTION REPORT A PRACTICAL APPROACH PRESENTED BY AJAY K. JAIN.
Neighbourhood Watch Poland: DIALOG Programme experiences.
October 22, 2010; Tallinn, Estonia Cosimo Garofalo III ESTONIAN NUCLEAR POWER CONFERENCE.
Chapter 7 Transmission Media
Smart heat for comfort and safety 1 Self-regulating system to maintain water flow in gutters and downpipes.
1 an online tool for GSM networks Planning and Inventory and others… IMK Consulting Simple tools for complex needs IMK – your IT tailor.
Business Promotion Opportunities Logos Mahatma Mandir, Sector-13, Gandhinagar, Nr Ahmedabad.
Symposium on Road to sustainable land administration in Africa 7 th annual African conference and Exhibition on Geospatial information, technology and.
15. Oktober Oktober Oktober 2012.
Committed to connecting the world Overview of ITU-T Study Group 5 “Environment and Climate Change” Ahmed ZEDDAM France Telecom Orange Chairman, ITU-T Study.
Charging at 120 and 240 Volts 120-Volt Portable Vehicle Charge Cord 240-Volt Home Charge Unit.
EN Safety of escalators and moving walks - Part 2: Rules for the improvement of safety of existing escalators and moving walks © ELA | T. Kausel.
HIPSSA Cost model training workshop: Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA.
Kampala, Uganda, 23 June 2014 NATIONAL CAMPAIGN TO MEASURE NON-IONIZING RADIATION FROM RADIO INSTALLATIONS DALLY Brice Landry Technical Director VALSCH.
Committed to connecting the world Overview of ITU-T Study Group 5 “Environment and Climate Change” Cristina Bueti Adviser, ITU-T Study Group 5.
Visions of Australia – Regional Exhibition Touring Fund Applicant organisation Exhibition title Exhibition Sample Support Material Instructions 1) Please.
EE4503 Electrical Systems Design
Inspection & Test Overview suite412.
- Constructions with high technology - 20 years of experience - Located in Rio de Janeiro - Turn Key solutions - Diversing portfolio of business (international.
Electrical Power Systems
Overvoltage Protection, A. Zeddam, Dakar, Senegal, 25 March 2015 ITU Regional Standardization Forum For Africa Dakar, Senegal, March 2015 Overview.
Overview of ITU-T Study Group 5 “Environment and Climate Change” Cristina Bueti, Adviser, ITU.
Nairobi, Kenya, 26 – 27July 2010 Revue on RF Safety Reference Levels and Measurement protocols Christian BLANCHARD CEO Planet Network International ITU-T.
DAKAR, Senegal, 24 - March 25, 2015 ASSESSMENT OF THE CONFORMITY OF THE BASE STATIONS TO THE NORMATIVE REQUIREMENTS RELATED TO THE PROTECTION AGAINST LIGHTNING.
MAJEES TECHNICAL SERVICES LLC Telecommunications Division Overview.
Gaborone, Botswana, July 2011 EMF Measurement Protocol and equipments (part II) Country Experience : France Jean-Benoît Agnani Engineer Agence nationale.
Committed to Connecting the World March 2011 Geneva, March 2011 Presentation of the Recommendation ITU-T K 100: Presentation of the Recommendation.
International Telecommunication Union Committed to connecting the world Overview of ITU-T/SG5 “Environment and climate change” Ahmed Zeddam Chairman of.
Electrical and RF Safety. Electrical Safety Generators Generators convert mechanical energy to electrical energy. They actually consist of two devices:
Committed to connecting the world Overview of ITU-T SG5 Work on Damage protection and safety Guy-Michel KOUAKOU Chairman of Study Group 5 Regional Group.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 1 –Free movement of goods Bilateral.
UNIT-5. ELECTRICAL SAFETY, WIRING & INTRODUCTION TO POWER SYSTEM
EARTHING.
Module 6 Antenna Assembly and Look up Angles
Grounding for Amateur Radio
ICT & Environment Seminar
Overview of SG5 and SG5RG for Africa activities
Presentation transcript:

RADIOELECTRIC SITES CONTROL FOR COMPLIANCE OF GSM OBILE CELLULAR TELEPHONY NETWORKS IN COTE DIVOIRE Workshop of ITU-T Study Group 5 Regional Group for Africa, Cotonou, Benin, 19 July 2012 VALSCH-Consulting DALLY BRICE LANDRY Technical Manager

PURPOSE OF THE EXPERTISE MISSION SCOPE REFERENCES TO STANDARDS STRUCTURES OVERVIEW STRUCTURING OF THE MISSION MISSION OPERATION OBSERVATIONS FAULTS PICTORIAL EXPOSURES BY THE POPULATIONS MEASUREMENTS PICTORIAL REPORT AND SYNTHESIS PURPOSE OF THE EXPERTISE MISSION SCOPE REFERENCES TO STANDARDS STRUCTURES OVERVIEW STRUCTURING OF THE MISSION MISSION OPERATION OBSERVATIONS FAULTS PICTORIAL EXPOSURES BY THE POPULATIONS MEASUREMENTS PICTORIAL REPORT AND SYNTHESIS CONTENT

PURPOSE OF THE EXPERTISE Control the compliance of GSM radioelectric sites to standards requirement in the pylon implementation, electric security, buoying and electromagnetic compatibility; Abide by technical prespecriptions, namely perimeters for security and control; Enhance ATCI basic information over technical parameters for radioelectric operating setups; MISSION SCOPE The campaign covers the networks for the following mobile cellular telephony operators: ORANGE COTE DIVOIRE (OCI), MTN-CI, COMIUM (Koz), ATLANTIQUE TELECOM (Moov) and ORICEL (Green).

REFERENCES TO STANDARDS FOUNDATION DTU P : French Regulations BAEL 91 regulations for design and the calculation of armed concrete works following the method of neighbouring countries. DTU : French Regulations for the calculation of surface foundations METALLIC STRUCTURE (PYLON) DTU P : French Regulations NV 65 – regulations that define snow and wind impacts on constructions/ Eurocode I. DTU P : French Regulations CM 66 and addendum 80 – regulations of calculation of steel constructions / Eurocode III. DTU P : Justification par le calcul de la sécurité des constructions - règles de calculs des constructions à parois minces en acier. NFP22-430, NFP à 469 (assemblages métalliques).

SYSTEM OF OVERHEAD SIGNALLING (BUOYING) Recommendations of the International Civil Aviation Organization, OACI annex 14 chapter 6 (11/1999). LIGHTNING SYSTEM Rec IUT K56 : Protection of radio base stations against lightning discharges. (01/2010). Standards NFC : Protection of structures against lightning (12/1997). Standards NFC : Electric Installations and Cables. DIRECTIVES : IFC (international Financial Company) / WORLD BANK GROUP Environmental, sanitary and security directives for Telecommunications REFERENCES TO STANDARDS

FREE STANDING PYLON INFRASTRUCTURES OVERVIEW

Guyed Pylon

INFRASTRUCTURES OVERVIEW MAST and TRIPOD

MISSION STRUCTURING No of activity Designation of activity Budget (Day) Comments 01 Development work ATCI-VALSCH-OPERATORS OF CELLULAR MOBILE TELEPHONY 0,5 Working session, explanation on the purpose and control points related to the mission 02 Receiving of fragment for engineering table and positioning of sites Mapping 0,5 - 03Physical tracking for sites- Operation of the site implementation 04 Mission performance 0,5 Visual controls and measurement for IN SITU compliance, site per site 05Draft of mission report3Site per site, 06Draft of synthesis report3 Synthesis of standard gaps in percentage, for each plate covered 07 Presentation of outcomes 0,5 Plate per plate in line with the Operators DESIGN RADIO

POSITIONING OF SITES (MAP Info / Google Earth) MISSION OPERATION

ENVIRONMENTAL CONTROL OF RADIOELECTRIC INFRASTRUCTURE Such chapter deals with environmental verification for radioelectric sites, impacts over environment/works done during the operational phases, rehabilitation and re-development. PYLON Such chapter deals with measurements and visual controls to verify the stability of the infrastructure (aerial plants). SYSTEM OF AERIAL SIGNALLING This chapter deals with the control of buoying operations night and day according to the general prescriptions of the International Civil Aviation Organisation (OACI) and local civil aviation authority. MISSIONS OPERATION

SYSTEM OF LIGHTNING This chapter deals with the system control for combatting lightning to protect Telecom installation equipment and neighbouring. RADIOELECTRIC DISCHARGE This chapter is about the reading of true technical parameters, control of state and evaluation of radioelectric discharge embarked on pylons and other relevant structures. SYNTHESIS AND PRESCRIPTIONS This chapter is about the synthesis of faults and recommendations for rehabilitation and compliance of works. MISSIONS OPERATION MISSIONS DETAIL : CONTROL FOR INFRASTRUCTURE RADIOELECTRIC COMPLIANCE.docxCONTROL FOR INFRASTRUCTURE RADIOELECTRICOMPLIANCE.docx

OBSERVATIONS Zones Concept and Signagee Observations Non existence of the security perimeter; fault of security system in place; Absence of appropriate signage. 1. ENVIRONEMENTAL CONTROL FOR RADIOELECTRIC INFRASTRUCTURE

ENVIRONMENT AND INSTALLATION Dirty Site; Oxydization of shelter at some points; Intallation of cables outside CDCH ; Knickpoint of walls and concretes; Grids of non secured oxdized condensers; Electric Enclosures not secured; Fuel leakage under generator; Extinguisher: expired use period. 2.PYLON Preventers of end ofthe non existing higher ribs; Reach of the main structure; Advanced Oxydization of nuts and bolts; Security Kit, oxydized, damaged or not exist; Ladder and safety bow, oxydized, damaged or not exist; Mechanic tensions not in compliance with prescriptions; Vertical fault. OBSERVATIONS

3.SYSTEM OF SIGNALLING Deterioated Day buoying; Non Operative Night Buoying; Open junction box; Non operative dusk to dawn switch 4.LIGHTNING PROTECTION Measured value (isolated) higher to 10 Ohms ; Old Lightning conductor; Non Labelled Earthing Network; Earthing system; Absence of earthing system for some equipment; Vandalized site, Site vandalisé, cut and robbed flats. 5. RADIOELECTRIC DISCHARGE Brake caliper, nuts and bolts, retransmission arms oxydized; Retransmission arms not galvanized; Antenna not well fixed / Design Radio not in compliance with engineering table/space isolation not respected; Deteriorated leaktightness not well completed; Higher head discharge almost prescribed; OBSERVATIONS

FAULTS PICTORIAL ENVIRONMENT AND INSTALLATION - non existing perimeter for security, home activities on radioelectric site; - Concrete cracking on radioelectric infrastructure.

PICTORIAL PYLON Balancing clamps not well aligned, nuts and bolts and oxydized safety kits

PICTORIAL SYSTEM OF SIGNALLING Non existing buoying, components of the night buoying system damaged

PICTORIAL SYSTEM ANTI-LIGHTNING Lightning conductor posts oxydized, ground rod oxydized, earthing network robbed, cut and robbed strap copper, isolated measurement not in compliance with standard prescription

PICTORIAL RADIOELECTRIC DISCHARGE Plug holes and GSM antenna fixing stirrup attachments damaged.

EXPOSURES BY THE POPULATIONS -Exposure to electromagnetic waves transmitting sources (electrosmog) ; -Electrocution ; -Fire ; -Houses Destruction; -Aircraft crash (aeroplanes) ; -Destruction of home appliances; -Bad quality or interruption of communications; -Etc.

MEASUREMENTS PICTORIAL Measurement of earth resistibility. Measurement of faulting vertical angle. Measurement of mechanic tension of Hauban cable.

MEASUREMENTS PICTORIAL REPORT AND SYNTHESIS DVD-OCI \001_RAPPORT_VC_ATCI_RX_OCI.xls xDVD-OCI \001_RAPPORT_VC_ATCI_RX_OCI.xls x

THANKS FOR YOUR ATTENTION