André Augustinus 10 September 2001 Common Applications to Prototype A two way learning process.

Slides:



Advertisements
Similar presentations
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
Advertisements

The Detector Control System – FERO related issues
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
P.C. Burkimsher Alice DCS Workshop 18 March 2002 (Updated 27 March 2003) PVSS - How to get started Paul Burkimsher IT Division COntrols Group Support Services.
Alarms and interlocks handling in the FSM environment Hypernet 1.The standardization of the FSM state diagram; 2.The FSM error states and their recovering.
Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
André Augustinus 16 June 2003 DCS Workshop Safety.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
LHC Gas Control System Stefan Haider EP-TA1-GS ALICE DCS workshop, S.Haider2 Outline Introduction and working philosophyIntroduction and working.
Designing a HEP Experiment Control System, Lessons to be Learned From 10 Years Evolution and Operation of the DELPHI Experiment. André Augustinus 8 February.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
Object-Oriented Software Engineering Practical Software Development using UML and Java Chapter 1: Software and Software Engineering.
André Augustinus 16 September 2002 Safety issues.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
1 LV Power Supplies L.Jirden* u Detector solutions u Contracts u Tests u Outstanding issues *Presented by André Augustinus.
15/12/10FV 1 Common DCS hardware. General ideas Centralized system: o Common computers. Detector dedicated computers (with detector participation) only.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
Object-Oriented Software Engineering Practical Software Development using UML and Java Chapter 1: Software and Software Engineering.
André Augustinus 13 June 2005 Control through serial links RS232 etc.
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
Naming and Code Conventions for ALICE DCS (1st thoughts)
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 1 Answers from the HMPID to the ACC questions 1.Concerning global DCS overview drawing 2.Concerning.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
André Augustinus 16 September 2002 PVSS & Framework How to get started.
JCOP/DCS Plans for HW Upgrade A. Augustinus (ALICE), C
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
18/6/03GS/ALICE Forum1 LVPS - Grounding Meeting of LVPS TF on Tuesday 17/6 Overview of TPC, TRD and TOF subsystem with F. Szoncso/TIS-GS Review of subsystems.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
André Augustinus 9 October 2006 Interlocks update.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
ALICE TPC Gas Control System (toward the first fully implemented LHC gas system) S. Haider EP-TA1-GS.
André Augustinus 21 June 2004 DCS Workshop Follow-up from last workshop.
IS444: Modern tools for applications development Dr. Azeddine Chikh.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
Teaching slides Chapter 3
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
G. Dissertori ETHZ CMS Electronics ECAL DCS Software Planning G. Dissertori ETHZ
1 DCS Status & Plans 22 June 2004 L.Jirdén. 2 URD Status DCS Detectors TOF SPDSDDSSD TPCTRDZDCPMDHMPITS PHO CPVCAL FMDV0T0 TRATRG MU ACCEMC HV LV FEE.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
Windows Terminal Services for Remote PVSS Access Peter Chochula ALICE DCS Workshop 21 June 2004 Colmar.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
Database Issues Peter Chochula 7 th DCS Workshop, June 16, 2003.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
ACO & AD0 DCS Status report Mario Iván Martínez. LS1 from DCS point of view Roughly halfway through LS1 now – DCS available through all LS1, as much as.
Common components for OPC-UA developments at CERN: An enhanced OPC-UA toolkit Ben Farnham.
TPC Detector Control System
Presentation transcript:

André Augustinus 10 September 2001 Common Applications to Prototype A two way learning process

André Augustinus 10 September 2001DCS workshop2 Introduction  Why seeking common solutions? Avoid duplication of work in the detectors More efficient support from experts Bulk purchase may reduce hardware costs Spares can be shared; thus less spares Easier maintenance, very important in the longer term future Aim for a coherent, homogeneous DCS

André Augustinus 10 September 2001DCS workshop3 Common Solutions  Try to find communalities across detectors Need requirements  Look what solutions already exist or are proposed In ALICE In other experiments (JCOP) In the accelerator and services

André Augustinus 10 September 2001DCS workshop4 Common Solutions  Currently we concentrate on the process level of DCS  For solutions we concentrate on: CERN accepted commercial solutions CERN supported solutions (IT/CO, JCOP, …)

André Augustinus 10 September 2001DCS workshop5 Prototyping  We would like to participate actively in the prototyping: To learn the problems one might encounter To learn and test current technologies

André Augustinus 10 September 2001DCS workshop6 Prototyping  How will we proceed Participate actively in getting clear requirements This usually involves several iterations Based on the requirements, propose a solution that would fulfill the requirements (with help of experts in e.g. IT/CO) If accepted, provide support for the implementation and commissioning Collect feedback

André Augustinus 10 September 2001DCS workshop7 Objectives  The objectives of prototyping Validate current ideas Ease of implementation and maintenance Evaluate performance and reliability issues Evaluate scalability Validate possible “final solutions” on “real systems”

André Augustinus 10 September 2001DCS workshop8 Objectives  The objectives of prototyping Compose a “catalogue” of tested and supported solutions, easy to implement and maintain Guidelines Framework, examples  Inconveniences: To start it might be heavy on resources (manpower, money and time), but it’s not a waste, it is an investment System might at first be “over-dimensioned”

André Augustinus 10 September 2001DCS workshop9 Current status  Currently concentrating mainly on the process level of DCS  Two pilots: TPC High Voltage Low Voltage Cooling Fieldcage (drift field) HMPID High Voltage Low Voltage Fluid system

André Augustinus 10 September 2001DCS workshop10 Current status (HMPID)  Started well before the central team existed  Gained a lot of experience with hardware and software that is most likely to be used more generally in ALICE CAEN HV, PLC (Siemens), PVSS, DIM, SMI  Should make this expertise available to a wider public (even outside ALICE)  We learn more from them then they from us

André Augustinus 10 September 2001DCS workshop11 Current status (TPC)  Established first contacts with the various sub-systems: HV, LV, cooling and Fieldcage  High and Low Voltage: Based on tests and surveys the TPC found a devices that satisfied their needs: ISEG for HV and Wiener for LV We are currently investigating how these devices can fit in the global DCS picture (mainly a communication issue)

André Augustinus 10 September 2001DCS workshop12 Current status (TPC)  Cooling: A test system has been built and is in principle running. But might not be the most optimal choice to apply to the “final system” In the process of gathering more detailed requirements Based on this we should be able to propose a solution applicable to the “final system”; and adaptable to other detector needs

André Augustinus 10 September 2001DCS workshop13 Current status (TPC)  Fieldcage: HV Power Supply, Current monitor, Cooling, Internal safety Most advanced as far as our involvement is concerned. Currently refining the user requirements for the system. We are preparing a third iteration. Close to proposing a solution that in principle should be a “final solution”. The prototype control system should be running by the end of the year.

André Augustinus 10 September 2001DCS workshop14 Current status (Testlab)  Announced in May, but little progress during summer Siemens PLC is installed  Foreseen in the near future: More “typical” hardware to be installed Develop simple demo-applications  Goals: Get acquainted with hardware and software Use as a development platform for prototypes

André Augustinus 10 September 2001DCS workshop15 Future developments  Continue work on pilots  Start work on a “vertical slice” of ALICE Build a control system from the hardware up to the highest level Validate the proposed architecture of the DCS (see a later talk)

André Augustinus 10 September 2001DCS workshop16 Conclusions  Inform us on what you are doing  We need your requirements You’ll be getting more questionnaires You’ll be invited for meetings You’ll get examples/instructions to prepare your URD  The ideal DCS would have for all systems standard solutions, no “special cases”.

André Augustinus 10 September 2001DCS workshop17 Conclusions  We will not force you into a solution that will not match your requirements  We might be annoying you now, but you will profit from it in the long run  We are a collaboration