Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Prototype Test of Type-B 1 Takanori Sekiguchi KAGRA F2F MEETING Feb. 2015.

Slides:



Advertisements
Similar presentations
Global longitudinal quad damping vs. local damping G v8 1.
Advertisements

Vibration Isolation Group R. Takahashi (ICRR)Chief T. Uchiyama (ICRR)Payload design H. Ishizaki (NAOJ)Prototype test R. DeSalvo (Caltech)SAS design A.
LIGO - G R 1 HAM SAS Test Plan at LASTI David Ottaway November 2005 LIGO-G Z.
Takanori Sekiguchi Italy-Japan Workshop (19 April, 2013) Inverted Pendulum Control for KAGRA Seismic Attenuation System 1 D2, Institute for Cosmic Ray.
Control strategy in the vibrtion isolation system for KAGRA Ryutaro Takahashi (Institute for Cosmic Ray Research, Univ. of Tokyo / National Astronomical.
40m Suspension Electronics Benjamin Abbott California Institute of Technology 10/18/01 G R.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
LIGO-G D 1 Requirements Environment and constraints Performance requirements Functional requirements.
LIGO-G W Commissioning Data on Vibration Isolation & Suspensions Fred Raab 24 October 02.
Ilya Berdnikov, Cornell University. Characterization of the LIGO 40m Lab Mode Cleaner Digital Suspensions Summer Project by Ilya Berdnikov Mentors:
LIGO-G D 1 MEPI electroMagnetic External Pre-Isolator Backup alternative to the Hydraulic actuator approach Goal: maximum commonality with HEPI.
LIGO- G060XXX-00-R E2E meeting, September How to design feedback filters? E2E meeting September 27, 2006 Osamu Miyakawa, Caltech.
Vibration Isolation R. Takahashi (ICRR), K. Yamamoto (ICRR), T. Uchiyama (ICRR), T. Sekiguchi (ICRR), H. Ishizaki (NAOJ), A. Takamori (ERI), R. DeSalvo.
September 8, 2015 THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER Helios Vocca.
SEO report _SAITO 1. Overall schedule of iKAGRA installation/commissioning change to Michelson Interferometer 2. Scheduling of daily works for installation.
Cryo-payload Kazuhiro Yamamoto Institute for Cosmic Ray Research
The GEO 600 Detector Andreas Freise for the GEO 600 Team Max-Planck-Institute for Gravitational Physics University of Hannover May 20, 2002.
Prototype Test of Vibration Isolation System Current Status & Schedule
Takanori Sekiguchi Anual Meeting of Physics Society of Japan Sep. 22nd, 2013) Prototype Test of Vibration Isolation System Current Status & Schedule 1.
Takanori Sekiguchi External Review Alignment control servo for type-B/type-Bp (OpLev/WFS) 1 T. Sekiguchi.
Summary of Suspension Configurations Yuta Michimura Department of Physics, University of Tokyo March 18, 2015.
KAGRA Roadmap and Progress Evaluation Assessment S.Miyoki  M.Ando 2012/7/30.
Seismic Attenuation System (SAS) for LCGT Inverted pendulum: 30mHz 3 cascaded GAS filter: 500mHz Test mass suspension: triple pendulum Transfer functions.
Ryutaro Takahashi (National Astronomical Observatory of Japan) Vibrtion isolation system for KAGRA The 6th Korea-Japan workshop on KAGRA NAOJ, June,
Takanori Sekiguchi External Review Control and tuning of suspension 1 T. Sekiguchi KAGRA 4th External Review.
E v3 aLIGO SEI Testing and Commissioning Overall Plan
Behavior of an inverted pendulum in the Kamioka mine R. Takahashi (NAOJ), A. Takamori (ERI), E. Majorana (INFN) GWADW 2010 We are investigating behavior.
External forces from heat links in cryogenic suspensions D1, ICRR, Univ. Tokyo Takanori Sekiguchi GWADW in Hawaii.
New in-air seismic attenuation system for the next generation gravitational wave detector M.R. Blom, A. Bertolini, E. Hennes, A. Schimmel, H.J. Bulten,
Installation Plan of VIS Ryutaro Takahashi (NAOJ) for the 4th external review on 30 June.
LIGO-G D 1 Status of Detector Commissioning LSC Meeting, March 2001 Nergis Mavalvala California Institute of Technology.
The VIRGO Suspensions Control System Alberto Gennai The VIRGO Collaboration.
MSC winter, short-term schedule Commissioning meeting Cascina 2 Oct 2006.
1|8J.V. van Heijningen Cables finished! Assemble/ Disassemble Type B Payload LED selection measurements NAOJ GW Meeting, May 8 th,
Low frequency anti-vibration system of LCGT Vibration Isolation Group R. Takahashi (ICRR), K. Yamamoto (ICRR), T. Uchiyama (ICRR), T. Sekiguchi (ICRR),
Two Layers SAS: Damping of Torsion Mode Feb. 5th, 2011 F2F Meeting Takanori Sekiguchi, Riccardo DeSalvo, Ryutaro Takahashi 1/8.
Takanori Sekiguchi Status of Cryogenic Payload Overall Design 1 T. Sekiguchi, E. Hirose JGW-G
Vibration Isolation Subsystem KAGRA face to face meeting (31 July, 2012) R. Takahashi (ICRR), K. Yamamoto (ICRR), T. Uchiyama (ICRR), T. Sekiguchi (ICRR),
Advanced LIGO UK 1 LIGO-G K OSEM Development UK Advanced LIGO project Stuart Aston University of Birmingham for the UK Advanced LIGO Team LSC.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The University of Tokyo KAGRA external review (Cryogenic payload) 18 April 2012.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo LCGT internal review (Cryogenic payload) 30 January 2012.
Summary of iKAGRA Test Run Mar 25-31, 2016 Yuta Michimura Department of Physics, University of Tokyo April 12, 2016JGW-T
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo LCGT internal review (Cryogenic payload) 30 January 2012.
E. Majorana (INFN – Rome) ELiTES 3 rd General Meeting Hongo Campus – Tokyo – 9-10 Feb., 2015 Cryogenic platform with vertical suspension: a practical approach.
Filter #7 control April 18, 2016 –, Cascina Paolo Ruggi.
IKAGRA 初期アラインメント手順 Initial Alignment Procedure for iKAGRA Yuta Michimura Department of Physics, University of Tokyo July 5, 2016JGW-T
Local control sensors for iKAGRA payloads and perspective (Optical lever) Kazuhiro Agatsuma 2013/Dec./5 ELiTES meeting at Tokyo1.
Yoichi Aso Columbia University, New York, NY, USA University of Tokyo, Tokyo, Japan July 14th th Edoardo Amaldi Conference on Gravitational Waves.
Type-A SAS Local Control Simulation (Current Status)
Main Interferometer Subsystem
Type B Installation Plan
VIRGO–KAGRA Meeting about bottom filter damping
KAGRA用防振装置の開発 VIII Configuration Sensors and Actuators
A study of Arm Length Stabilization in KAGRA
Control of the KAGRA Cryogenic Vibration Isolation System
Vibration Isolation Systems
Cryogenic Payload Modeling: Vibration via Heat Links
Type B Installation Plan
LIGO Detector Commissioning
Institute for Cosmic Ray Research The University of Tokyo
Mark Barton f2f Meeting 2/22/16
LIGO Detector Commissioning
Mark Barton f2f Meeting 2/22/16
Summary of iKAGRA Test Run Mar 25-31, 2016
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
HAM SAS Test Plan at LASTI
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Development of vibration isolation systems for LCGT VII
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Cryogenic Payload Modeling: Vibration via Heat Links
Presentation transcript:

Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Prototype Test of Type-B 1 Takanori Sekiguchi KAGRA F2F MEETING Feb. 2015

Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Overview of SAS prototype test Payload prototype test Status & plan of full type-B test Contents 2

Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Prototype Test Status 3 AssemblyPerformance Pre-isolator GAS filter Payload Full SystemUndergoing TBD Pre-isolator GAS filter Payload

Takanori Sekiguchi ALPS Report, Dec. 26th, Payload Prototype Test

Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Payload Prototype Test in NAOJ 5 Purpose: Check the assemblability and feasibility Test the local control using OSEMs

Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Structure of payload 6 Bottom Filter Intermediate Mass/ Intermediate Recoil Mass Intermediate Mass/ Intermediate Recoil Mass Mirror / Recoil Mass

Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 (Rough) Assembly Procedure 7 Suspend mirror & RM

Takanori Sekiguchi ALPS Report, Dec. 26th, (Dummy) mirror suspended by φ0.2 steel wires Recoil mass suspended by φ0.6 tungsten wires Winches to suspend masses Height measure to check the wire length

Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 (Rough) Assembly Procedure 9 Suspend IM from BF

Takanori Sekiguchi ALPS Report, Dec. 26th, Tuning masses (weight control & balancing)

Takanori Sekiguchi ALPS Report, Dec. 26th, Screw to change the suspension point Tuning pitch frequency ~0.2 Hz

Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 (Rough) Assembly Procedure 12 Suspend IRM

Takanori Sekiguchi ALPS Report, Dec. 26th, IRM (without OSEMs) Suspended by 3 wires Screws for changing suspension points

Takanori Sekiguchi ALPS Report, Dec. 26th, Cable clip Cabling of electrical wires

Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Compensation masses to get enough weight for GAS filter Feedback to the design 15 Separate OSEM parts for easier assembly … and so on.

Takanori Sekiguchi ALPS Report, Dec. 26th, Control Test

Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 OSEM 17 Unit of a shadow sensor and a coil-magnet actuator (Current Design) LED PD flag coil magnet lens

Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 OSEM 18 Calibration results of shadow sensors of 4 prototype units Sensitivity: ~6.5 V/mm

Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 OSEM 19 Shadow sensor noise ~ 5e Hz

Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 OSEM 20 Actuation force by an OSEM actuator ~1.7 [N/A]

Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Actuator Diagonalization (Mirror) 21 X Y Z 3 DoFs we want to sense with 4 sensors: 4 actuators we use to actuate 3 DoFs: The actuation matrix D is improved by measurement. 1 st guess (Actuator Diagonalization)

Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Actuator Diagonalization (IM) 22 Z 6 DoFs we want to sense with 6 sensors: 1 st guess X Y actuators we use to actuate 6 DoFs:

Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Implementation in Digital System 23 MEDM Screen for type-B SAS control (under development) Sensor MatrixActuator Matrix Signal Flow Signals from shadow sensors Actuation Signals

Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Transfer functions (Mirror) 24 Pitch Yaw Length White noise is injected to virtual actuators

Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Transfer functions (IM) 25

Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Damping Control 26 Damping servo is applied to the 6-DoF motion of IM and 3- DoF motion of the mirror Derivative filter (viscous damping)

Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 In-loop performance 27 OSEM signal of IM longitudinal motion OSEM signal of IM yaw motion 3 μm  0.6 μm 30 μrad  2 μrad

Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Optical Lever 28 Optical levers to monitor mirror angles / displacement 1W SLD Half Mirror QPD2 QPD1 Collimator

Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Out of loop performance 29 Optical lever signals about mirror pitch motion Optical lever signals about mirror yaw motion 35 μrad  13 μrad 50 μrad  12 μrad

Takanori Sekiguchi ALPS Report, Dec. 26th, Full Type-B Test

Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Full Type-B Test West-End Room Full type-B prototype will be assembled and tested in vacuum Overall performance is to be checked by using optical lever

Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Current Status 32 Vacuum system preparation Height of the chamber is to be checked

Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Current Status 33 Cleaning and remanufacturing of IP base Finished on Jan. 28

Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Current Status 34 Vacuum pod for geophone (seismometer) manufactured Assembling and cabling should be done

Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Current Status 35 An assembly frame is designed.

Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Schedule 36 According to KAGRA schedule, prototype test is to be finished until the end of March. Extremely tight!

Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Main Tasks 37 Consider assembly procedure. Do mechanical tuning (leveling, weight control, etc.) Make an assembly manual (for installation of actual system) Manufacture in-vacuum electrical cables Design servo filter in mathematical model Prepare digital system interface Red: Important for KAGRA Violet: Time-consuming tasks

Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 We need your help!! 38 We call for KAGRA-shift This prototype test is an absolutely important step in considering installation procedure of actual system, and getting more realistic plan/schedule of VIS installation

iKAGRA schedule Fabry-Perot-Michelson VIS installation Stack install Stack MC suspension install MC PR2 & PR3 frame/payload procurement PR2 & PR3 IXA & EXA (Xarm cavity) frame/payload procurement IXA & EXA IYA & EYA (Yarm cavity) frame/payload procurement IYA & EYA BS modifying prototype payload procurement BS Xarm commissioning Full commissioning Observation Obs. Michelson VIS installation Stack install Stack MC suspension install MC PR2 & PR3 frame/payload procurement PR2 & PR3 IXA & IYA EXA & EYA frame/payload procurement EXA & EYA BS modifying prototype payload procurement BS Michelson commissioning Observation Obs. Schedule of VIS installation: iKAGRA Dec 2015 operation 39

Takanori Sekiguchi ALPS Report, Dec. 26th, END

Takanori Sekiguchi ALPS Report, Dec. 26th, Appendix

Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Close Loop TF 42