Nairobi, Kenya, 26 – 27July 2010 EMF MEASURING IN KENYA Derick simiyu khamali Compliance and Enforcement Officer Communications Commission of Kenya ITU-T.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

WPA-WHO Global Survey of Psychiatrists' Attitudes Towards Mental Disorders Classification Results for the Spanish Society of Psychiatry.
Advanced Piloting Cruise Plot.
1
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
Quito, Ecuador, 14 August 2013 Assessing EMF Levels Guidance and Recommendations Mike Wood EME Management Education & Compliance Telstra ITU Workshop on.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Nairobi, Kenya, 26 – 27July 2010 Maintaining Equipment Standards to ensure good QoS Mwende Njiraini Engineer I/NT/LCS Communications Commission of Kenya.
Nairobi, Kenya, 26 – 27July 2010 Regulatory Monitoring and interventions on Quality of Service Derick simiyu khamali Compliance and Enforcement Officer.
Nairobi, Kenya, 26 – 27July 2010 Kenyas Experience in the Measurement of EMF James Chumba, Senior Radiation Protection Officer, Radiation Protection Board.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Site Safety Plans PFN ME 35B.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
PP Test Review Sections 6-1 to 6-6
EU market situation for eggs and poultry Management Committee 20 October 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
2 |SharePoint Saturday New York City
Green Eggs and Ham.
IP Multicast Information management 2 Groep T Leuven – Information department 2/14 Agenda •Why IP Multicast ? •Multicast fundamentals •Intradomain.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
LO: Count up to 100 objects by grouping them and counting in 5s 10s and 2s. Mrs Criddle: Westfield Middle School.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Note to the teacher: Was 28. A. to B. you C. said D. on Note to the teacher: Make this slide correct answer be C and sound to be “said”. to said you on.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Subtraction: Adding UP
Equal or Not. Equal or Not
Januar MDMDFSSMDMDFSSS
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Energy Generation in Mitochondria and Chlorplasts
CpSc 3220 Designing a Database
Presentation transcript:

Nairobi, Kenya, 26 – 27July 2010 EMF MEASURING IN KENYA Derick simiyu khamali Compliance and Enforcement Officer Communications Commission of Kenya ITU-T Workshop on Delivering Good Quality Telecommunication Service in a Safe Environment in Africa (Nairobi, Kenya, 26 July – 27 July 2010 )

Nairobi, Kenya, 26 – 27 July Introduction Kenya has a Memorandum of understanding between Radiation Protection Board (RPB) and Communications Commission of Kenya (CCK) to address issues of RF Emissions from telecommunications infrastructure. CCK and RPB have adopted various ways to deliver on this mandate through field monitoring & measurements The basis is on the reports received from NEMA on EIA any other complaint from the Public or perceived.

Non Ionising Radiation Measurements - NIR The Commission measures EMF Radiation levels from Communication installations country wide. The aim is to ascertain the performance by different operators in view of human safety, health and environmental welfare. This is done by Random sampling and visits to several masts/towers and antenna installations. 2/22/ :55 AM 3

4 Why NIR Monitoring Due to public concern after the Commission licensed more GSM operators who rolled out their network by building towers all over to satisfy growing demand. The resistance that operators were facing from the public whenever they wanted to establish new installations especially in residential places. Due to corporate responsibility to ensure quality telecommunication services are delivered in a safe and healthy environment.

2/22/ :55 AM 5 Objectives of NIR Monitoring To ascertain public safety as part of the consumer protection obligations. To assure and alleviate any public fears whenever installations are coming up. To support the operators and ensure network roll out is not hampered.

Common Concerns and Areas of Interest: Markets and shopping malls. Schools, hospitals, sports grounds and other public amenities. Residential areas Protected zones like Embassies, military and other sensitive facilities. 2/22/ :55 AM 6

7 Final Reports These are filed in the inspection reports file and also kept in soft copy. Each case stays as an open case until follow-ups on compliance are finalized. Future inspections are pegged on the basis filed and any new developments.

FIELD DATA COLLECTION The Following procedure is adopted: 1. Initial field strength & site review is done in the office prior to site visit using EIA reports received from NEMA. Adhoc sites are managed on the ground. 2. Line of sight is established on ground w.r.t antenna Azimuth & measurement points are determined using a compass & GPS 3. Normally two points are selected at about 100m and 200m from the base of the mast 2/22/ :55 AM 8

Results Data collected is analysed using specialised software and the reports are automatically generated. The results are compared with WHO & ICNIRP Thresholds to determine site Compliance & Non Compliance. 2/22/ :55 AM 9

Field work Nairobi, Kenya, 26 – 27 July

MONITORING TOOLS The Commission uses the following tools: 1. RAHAM – Radaition Hazard Metre 2. Spectrum Analyzer – FSH 18 2/22/ :55 AM 11

A Nairobi, Kenya, 26 – 27 July

Raham - (Radiation Hazard Metre) 2/22/ :55 AM 13

RAHAM PERFORMANCE The Raham has two antenna Probes with gauges for 18GHz and 48 GHz. The measurements are taken by pointing the probe to the antenna/mast. The measurements take 6 minutes and are recorded in terms of power density – W/m. The system can also be set manually to report other parameters and units. 2/22/ :55 AM 14

RAHAM SET UP One key component is the GPS that records the geographical data of every site and point visited. The Raham has two antenna Probes Covering different Ranges of the frequency spectrum. A) Ranges from 100KHz to 3 GHz B) Ranges from 3GHz to 18GHz. 2/22/ :55 AM 15

Raham main frame and probes 2/22/ :55 AM 16

B Nairobi, Kenya, 26 – 27 July

Spectrum Analyzer (Main Frame) 2/22/ :55 AM 18

SPECTRUM ANALYZER The Commission uses FSH 18 model from Rhode and Schwartz. The spectrum range monitored is from 9KHz to 7.5GHz. The unit has five antennas to fit this range as detailed in other slides below. 2/22/ :55 AM 19

FSH 18 PERFORMANCE The measurements are taken by pointing the probe to the suspect source - antenna/mast. The measurements are taken instantaneously and with respect to the specific operator frequencies. The data collected is analysed to ascertain compliance. 2/22/ :55 AM 20

Spectrum Analyzer (Mounted A) 2/22/ :55 AM 21

Spectrum Analyzer (Mounted B) 2/22/ :55 AM 22

Antenna (0.5 – 7.5 GHz) 2/22/ :55 AM 23

Antenna ( MHz) 2/22/ :55 AM 24

Antenna (9KHz-20MHz) 2/22/ :55 AM 25

Antenna (20-200MHz) 2/22/ :55 AM 26

Antenna (DOME) 2/22/ :55 AM 27

Industrial area Nairobi, Kenya, 26 – 27 July

Informal Settlement and school Nairobi, Kenya, 26 – 27 July

Multiple Residential Installations Nairobi, Kenya, 26 – 27 July

Nairobi, Kenya, 26 – 27 July

School Compound Nairobi, Kenya, 26 – 27 July

Kinder-garden site works Nairobi, Kenya, 26 – 27 July

2/22/ :55 AM 34 Thank you!